849 resultados para Management Project
Resumo:
Report produced by Iowa Departmment of Agriculture and Land Stewardship
Resumo:
Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.
Final Report (SPR Project 90-00-RB10-012) on the Maintenance Asset Management Project Phase II, 2013
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Resumo:
0-472-842.
Resumo:
There has been a strong move towards entrepreneurial education in high schools and at universities over the past few years. This has been echoed by a call from state governments around Australia to promote enterprise thinking and education in high schools. It also parallels the push within engineering to learn across the traditional boundaries , particularly between engineering and business. To meet this call, The Engineering Link Group (TELG) developed the Future Engineers Australia Management Project (FEAMP) in 2003. The project is based around Enterprise Education, and was inspired by the Smallpeice Year 12 Engineering Management course in the UK. The idea was to take high school students in years 11 and 12 and turn them into ‘engineering entrepreneurs’. This paper presents the design, development and evaluation of FEAMP as a five day residential course for year 11 and 12 students who want to learn more about being entrepreneurs and managers. It is a hands-on activity where the students invent, develop and sell an engineering concept to venture capitalists and ultimately to customers at a trade fair. It has been run successfully for two years, going from strength to strength. © 2005, Australasian Association for Engineering Education
Resumo:
The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile Project Management emerges as a manifestation against traditional approaches, mainly due to their inability of accepting requirements’ changes. Therefore, these practices and concepts can be considered in order to reduce the risks concerning the increase of competition and innovation – which does not apply to the IT sector solely. The current study reviews the literature on Agile Project Management and its adoption across different sectors in order to assess which practices and concepts can be applied on a non-IT context. Nine different methods are reviewed, where two of these show a higher relevance – Scrum and Extreme Programming. The identified practices and concepts can be separated into four different groups: Cultural and Organizational Structures, Process, Practices, and Artefacts. A framework based on the work by Boehm & Turner in 2004 is developed in order to support the decision of adopting agile methods. A survey intended for project managers was carried in order to assess the implementation of the identified practices and concepts and to evaluate which variables have the highest importance on the developed decision support framework. It is concluded that New Product Development is the project type with the highest potential to implement an agile approach and that the Project Final Product’s Innovativeness, Competitiveness, and the Project Member’s Experience and Autonomy are the most important aspects to consider an implementation of an Agile approach.
Resumo:
Tutkielman tavoitteena on määritellä projektikontrolloinnin ja - riskijohtamisen roolit ja toiminnot saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tämä on kvalitatiivinen tutkielma, jossa käytetään voimakkaasti kuvailevia metodeita. Materiaali tutkimuksen empiiriseen osaan kerättiin kyselykaavakkeen avulla. Kyselykaavakkeiden tulokset käsiteltiin Microsoft Office Access- ohjelmalla ja analysoitiin Microsoft Office Excel- ohjelmalla ja Pivot table- työkalun avulla. Tutkimustulokset osoittavat, että asianmukaisessa projektikontrollointi- ja riskijohtamismetodien käytössä ja käyttötiheydessä esiintyy puutteita saksalaisissa kone- ja tehdassuunnitteluteollisuusyrityksissä. Tehostamalla ja keskittymällä enemmän projektikontrollointi- ja riskijohtamismetodeihin ja prosesseihin sekä projektien että yritysten suorituskyky paranisi.
Resumo:
Tutkielman päätavoitteena oli tutkia miten projektisalkun hallinnalla voidaan tukea organisaation strategista ohjausta ja liiketoimintaa. Tämän lisäksi avaintavoitteina oli kuvata projektisalkun hallinnan nykytilanne kohdeyrityksessä, paljastaa erityisiä kehitystarpeita ja lopulta luoda kohdeyrityksen projektisalkunhallinnalle tavoitetila. Kirjallisuuskatsauksessa pohdittiin projektisalkun hallinnan roolia ja tavoitteita, projektisalkun hallinnassa käyttävää prosessia, sekä menetelmiä ja tekniikoita, joilla salkkua hallitaan. Työn empiirisessä osassa syvennyttiin tutkimaan projektinsalkun hallintaan liittyviä erityispiirteitä kohdeyrityksessä. Tutkimustulosten huolellinen analysointi osoitti, että aikaisempi kirjallisuus ei riittävästi huomioi kokonaisvaltaisen, integroidun lähestymistavan tarvetta ja viestinnän tärkeyttä projektisalkun hallinnassa. Tutkimuksen johtopäätöksinä luotiin uusi integroitu projektisalkun hallintamalli ja määriteltiin kohdeyritykselle projektisalkun hallinnan tavoitetila sekä ne kehitysaskeleet, joita yrityksen tulisi lähitulevaisuudessa ottaa.