959 resultados para Major project
Rating defence major project success : the role of personal attributes and stakeholder relationships
Resumo:
In this paper we develop and test a model of the associations between major project managers' personal attributes and project success in the context of the Australian Defence industry. In our model, emotional intelligence, cognitive flexibility and systemic thinking were hypothesised to relate to project success, mediated by internal and external stakeholder relationships. The model was tested in an online survey with 373 major project managers. Emotional intelligence and cognitive flexibility were found to be related to the development, quality and effectiveness of major project managers' relationships with both internal and external stakeholders; and these in turn were associated with their ratings of project success. Systemic thinking, however, had no relationship with either stakeholder relationships or project success. Additional research is needed to examine the contribution of a wider range of personal attributes to stakeholder relationships and project success, and to assess whether this model is applicable in other industries and types of projects.
Resumo:
This thesis identifies attributes, skills and behaviours that major project managers require for stakeholder relationships competence and project success within a major project environment. It develops valid and reliable measures of internal and external stakeholder relationships competence, tests a complex conceptual model and explores the effectiveness of the QUT Executive Masters of Complex Project Management and Strategic Procurement in developing major project managers' stakeholder relationships competence. Implications of this thesis are for government and industry in identifying factors associated with major project success, as this will lead to better major project outcomes potentially resulting in time and monetary savings of years and billions of dollars.
Resumo:
In this paper, we detail the development of two stakeholder relationships scales. The scales measure major project managers' perceived competence in developing (establishing and maintaining) high quality, effective relationships with stakeholders who are internal and external to their organization. Our sample consists of 373 major project managers from a sub-set of the Australian defense industry. Both the internal stakeholder relationships scale and the external stakeholder relationships scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships literature and the stakeholder management literature. We recommend that researchers test these scales with multiple samples, across different project types and project industries in the future. The stakeholder relationship scales should be versatile enough to be applied to project management generally but are perhaps best suited to major project environments.
Resumo:
This paper relates to government initiatives which aim at advancing their country’s economic development and investor attractiveness. It identifies large scale projects that involve collaboration between government and business (termed: large scale collaborative venture – LSCV) as one aspect of competing in the new economy. The study pursued the research proposition that a LSCV can be effectively facilitated by following a theory based process similar to what is used in corporate practice. An approach to managing such ventures is outlined, based on strategic marketing theory applied to a major project, the Multifunction Polis. It is proposed that such an approach may enhance the success of a collaborative venture and thereby help countries participate more successfully in global competition through such ventures.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
A major project in the Sustainable Built Assets core area is the Sustainable Sub-divisions – Ventilation Project that is the second stage of a planned series of research projects focusing on sustainable sub-divisions. The initial project, Sustainable Sub-divisions: Energy focused on energy efficiency and examined the link between dwelling energy efficiency and sub-divisional layout. In addition, the potential for on site electricity generation, especially in medium and high-density developments, was also examined. That project recommended that an existing lot-rating methodology be adapted for use in SEQ through the inclusion of sub divisional appropriate ventilation data. Acquiring that data is the object of this project. The Sustainable Sub-divisions; Ventilation Project will produce a series of reports. The first report (Report 2002-077-B-01) summarised the results from an industry workshop and interviews that were conducted to ascertain the current attitudes and methodologies used in contemporary sub-division design in South East Queensland. The second report (Report 2002-077-B-02) described how the project is being delivered as outlined in the Project Agreement. It included the selection of the case study dwellings and monitoring equipment and data management process. This third report (Report 2002-077-B-03) provides an analysis and review of the approaches recommended by leading experts, government bodies and professional organizations throughout Australia that aim to increase the potential for passive cooling and heating at the subdivision stage. This data will inform issues discussed on the development of the enhanced lot-rating methodology in other reports of this series. The final report, due in June 2007, will detail the analysis of data for winter 2006 and summer 2007, leading to the development and delivery of the enhanced lot-rating methodology.
Resumo:
This report examines the involvement of manufacturers in value-adding through service-enhancement of product offerings. This focus has been prompted by: emphasis in the knowledge-economy literature on the increasing role played by services in economic growth; and recent analysis which suggests that the most dynamic sector of many economies is an integrated manufacturing-services sector (see Part One of this report). The report initially describes the emergence of an integrated manufacturing-services sector in the context of increasingly knowledge-based economic systems. Part Two reports on the results of a survey of manufacturers in the building and construction product system, investigating their involvement in service provision. Parts Three and Four present two case studies of exemplary manufacturers involved in adding value to their manufacturing operations through services offered on building and construction projects. The report examines manufacturers of materials, products, equipment and machinery used on building and construction projects. The two case study sections of the report, in part, focus on a major project undertaken by each of the manufacturers. This project element of activity is focussed on (as opposed to wholesale or retail supply), because this area of activity involves a broader array of service-enhancement mechanisms and more complex bundling of products and services.
Resumo:
Effective planning is an important part of meeting the learning needs of students in middle years classrooms. Yet this is a task with inherent complexity. Teachers who subscribe to a contemporary philosophy of middle years education often come together to cooperatively plan and teach a major project. These teachers often represent a range of teaching areas and between them they work with groups of students. Working in this way requires teachers to juggle the demands of curriculum, pedagogy and assessment, while considering short and long term goals and objectives, the diverse needs of students, and relevant contextual factors. Because all teachers, regardless of their specialist teaching area, are teachers of literacy, expertise in planning for content learning as well as literacy learning is essential.
Resumo:
The Six Sigma technique is one of the quality management strategies and is utilised for improving the quality and productivity in the manufacturing process. It is inspired by the two major project methodologies of Deming’s "Plan – Do – Check – Act (PDCA)" Cycle which consists of DMAIC and DMADV. Those two methodologies are comprised of five phases. The DMAIC project methodology will be comprehensively used in this research. In brief, DMAIC is utilised for improving the existing manufacturing process and it involves the phases Define, Measure, Analyse, Improve, and Control. Mask industry has become a significant industry in today’s society since the outbreak of some serious diseases such as the Severe Acute Respiratory Syndrome (SARS), bird flu, influenza, swine flu and hay fever. Protecting the respiratory system, then, has become the fundamental requirement for preventing respiratory deceases. Mask is the most appropriate and protective product inasmuch as it is effective in protecting the respiratory tract and resisting the virus infection through air. In order to satisfy various customers’ requirements, thousands of mask products are designed in the market. Moreover, masks are also widely used in industries including medical industries, semi-conductor industries, food industries, traditional manufacturing, and metal industries. Notwithstanding the quality of masks have become the prioritisations since they are used to prevent dangerous diseases and safeguard people, the quality improvement technique are of very high significance in mask industry. The purpose of this research project is firstly to investigate the current quality control practices in a mask industry, then, to explore the feasibility of using Six Sigma technique in that industry, and finally, to implement the Six Sigma technique in the case company to develop and evaluate the product quality process. This research mainly investigates the quality problems of musk industry and effectiveness of six sigma technique in musk industry with the United Excel Enterprise Corporation (UEE) Company as a case company. The DMAIC project methodology in the Six Sigma technique is adopted and developed in this research. This research makes significant contribution to knowledge. The main results contribute to the discovering the root causes of quality problems in a mask industry. Secondly, the company was able to increase not only acceptance rate but quality level by utilising the Six Sigma technique. Hence, utilising the Six Sigma technique could increase the production capacity of the company. Third, the Six Sigma technique is necessary to be extensively modified to improve the quality control in the mask industry. The impact of the Six Sigma technique on the overall performance in the business organisation should be further explored in future research.
Resumo:
This report presents the results of Phase 3 of the Innovative Road Products Project: National Focus Groups. The groups developed solutions to address the most important obstacles constraining the adoption of innovative products in Australian road construction projects. The Innovative Products Survey, the major Project deliverable in 2011, and the largest innovation survey ever undertaken in the Australian road consutrction industry, results in the identification of key obstacles constraining the adoption of innovative products on road projects.
Resumo:
This research is part of a major project with a stimulus that rose from the need to manage a large number of ageing bridges in low traffic volume roads (LTVR) in Australia. The project investigated, designed and consequently constructed, involved replacing an ageing super-structure of a 10m span bridge with a disused Flat-bed Rail Wagon (FRW). This research, therefore, is developed on the premises that the FRW can be adopted as the main structural system for the bridges in LTVR network. The main focus of this research is to present two alternate deck wearing systems (DWS) as part of the design of the FRW as road bridge deck conforming to AS5100 (2004). The bare FRW structural components were first examined for their adequacy (ultimate and serviceability) in resisting the critical loads specified in AS5100(2004). Two options of DWSs were evaluated and their effects on the FRW examined. The first option involved usage of timber DWS; the idea of this option was to use all the primary and secondary members of the FRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option involved usage of reinforced concrete DWS with only the primary members of the FRW sharing the AS5100 (2004) loading. This option inherently minimised the risk associated with any uncertainty of the secondary members to their structural adequacy. This thesis reports the design phases of both options with conclusions of the selection of the ideal option for better structural performance, ease of construction and cost. The comparison carried out here focuses on the distribution of the traffic load by the FRW as a superstructure. Advantages and disadvantages highlighting cost comparisons and ease of constructability of the two systems are also included.
Resumo:
Many students enter business degrees without a defined career goal beyond working in the business world and adopt a scattergun approach to employability by accumulating certifications accessed through individual subjects. Yet, space and time limitations commonly prevent extended exposure to rewarding and interesting career subfields within main specialisations. This case study draws on student feedback collected over three years exploring students’ career interest following an elective human resource development subject in the final stage of a human resources major. Project-based curriculum provided students with scaffolded learning while undertaking key multiphase human resource development tasks. Subsequently, students reported human resource development career interest and intent, attributed to more realistic appreciation of human resource development’s activities, scope, and values. The paper makes an important contribution illustrating how curriculum design can transform instrumentalism into logically, emotionally, and intuitively based career engagement. Further, human resource development is a study and career area little mentioned in higher education or careers literature.
Resumo:
This report describes the Year One Pilot Study processes, and articulates findings from the major project components designed to address these challenges noted above (See Figure 1). Specifically, the pilot study tested the campaign research and development process involving participatory design with young people and sector partners, and the efficacy and practicality of conducting a longitudinal, randomised control trial online with minors, including ways oflinking survey data to campaign data. Each sub-study comprehensively considered the ethical requirements of conducting online research with minors in school settings. The theoretical and methodological framework for measuring campaign engagement and efficacy (Sub-studies 3, 4 and 5) drew on the Model of Goal-Directed Behaviour (MGB) (Perugini & Bagozzi 2001) and Nudge Theory (Thaler & Sunstein, 2008).