995 resultados para Maintenance de programme


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Road maintenance work has gradually been increasing in Latin America. Existing contracts in Argentina, Chile, Guatemala and Uruguay - 210 overall - account for a total of 20,212 kilometers of public roadways by level of service. In Brazil, Ecuador and Peru, 26 contracts are now in the pipeline for the maintenance of 7,700 kilometres of roadway. This issue of the FAL Bulletin presents a survey of the status of road maintenance considered at the second Seminar of the Americas of the Road Maintenance Training Programme (Provial), held in Lima, Peru from 18 to 21 October 1999 and which examined the type of financing used in road maintenance as well as contracts, institutions and interaction between the public and private sectors.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Les changements sont faits de façon continue dans le code source des logiciels pour prendre en compte les besoins des clients et corriger les fautes. Les changements continus peuvent conduire aux défauts de code et de conception. Les défauts de conception sont des mauvaises solutions à des problèmes récurrents de conception ou d’implémentation, généralement dans le développement orienté objet. Au cours des activités de compréhension et de changement et en raison du temps d’accès au marché, du manque de compréhension, et de leur expérience, les développeurs ne peuvent pas toujours suivre les normes de conception et les techniques de codage comme les patrons de conception. Par conséquent, ils introduisent des défauts de conception dans leurs systèmes. Dans la littérature, plusieurs auteurs ont fait valoir que les défauts de conception rendent les systèmes orientés objet plus difficile à comprendre, plus sujets aux fautes, et plus difficiles à changer que les systèmes sans les défauts de conception. Pourtant, seulement quelques-uns de ces auteurs ont fait une étude empirique sur l’impact des défauts de conception sur la compréhension et aucun d’entre eux n’a étudié l’impact des défauts de conception sur l’effort des développeurs pour corriger les fautes. Dans cette thèse, nous proposons trois principales contributions. La première contribution est une étude empirique pour apporter des preuves de l’impact des défauts de conception sur la compréhension et le changement. Nous concevons et effectuons deux expériences avec 59 sujets, afin d’évaluer l’impact de la composition de deux occurrences de Blob ou deux occurrences de spaghetti code sur la performance des développeurs effectuant des tâches de compréhension et de changement. Nous mesurons la performance des développeurs en utilisant: (1) l’indice de charge de travail de la NASA pour leurs efforts, (2) le temps qu’ils ont passé dans l’accomplissement de leurs tâches, et (3) les pourcentages de bonnes réponses. Les résultats des deux expériences ont montré que deux occurrences de Blob ou de spaghetti code sont un obstacle significatif pour la performance des développeurs lors de tâches de compréhension et de changement. Les résultats obtenus justifient les recherches antérieures sur la spécification et la détection des défauts de conception. Les équipes de développement de logiciels doivent mettre en garde les développeurs contre le nombre élevé d’occurrences de défauts de conception et recommander des refactorisations à chaque étape du processus de développement pour supprimer ces défauts de conception quand c’est possible. Dans la deuxième contribution, nous étudions la relation entre les défauts de conception et les fautes. Nous étudions l’impact de la présence des défauts de conception sur l’effort nécessaire pour corriger les fautes. Nous mesurons l’effort pour corriger les fautes à l’aide de trois indicateurs: (1) la durée de la période de correction, (2) le nombre de champs et méthodes touchés par la correction des fautes et (3) l’entropie des corrections de fautes dans le code-source. Nous menons une étude empirique avec 12 défauts de conception détectés dans 54 versions de quatre systèmes: ArgoUML, Eclipse, Mylyn, et Rhino. Nos résultats ont montré que la durée de la période de correction est plus longue pour les fautes impliquant des classes avec des défauts de conception. En outre, la correction des fautes dans les classes avec des défauts de conception fait changer plus de fichiers, plus les champs et des méthodes. Nous avons également observé que, après la correction d’une faute, le nombre d’occurrences de défauts de conception dans les classes impliquées dans la correction de la faute diminue. Comprendre l’impact des défauts de conception sur l’effort des développeurs pour corriger les fautes est important afin d’aider les équipes de développement pour mieux évaluer et prévoir l’impact de leurs décisions de conception et donc canaliser leurs efforts pour améliorer la qualité de leurs systèmes. Les équipes de développement doivent contrôler et supprimer les défauts de conception de leurs systèmes car ils sont susceptibles d’augmenter les efforts de changement. La troisième contribution concerne la détection des défauts de conception. Pendant les activités de maintenance, il est important de disposer d’un outil capable de détecter les défauts de conception de façon incrémentale et itérative. Ce processus de détection incrémentale et itérative pourrait réduire les coûts, les efforts et les ressources en permettant aux praticiens d’identifier et de prendre en compte les occurrences de défauts de conception comme ils les trouvent lors de la compréhension et des changements. Les chercheurs ont proposé des approches pour détecter les occurrences de défauts de conception, mais ces approches ont actuellement quatre limites: (1) elles nécessitent une connaissance approfondie des défauts de conception, (2) elles ont une précision et un rappel limités, (3) elles ne sont pas itératives et incrémentales et (4) elles ne peuvent pas être appliquées sur des sous-ensembles de systèmes. Pour surmonter ces limitations, nous introduisons SMURF, une nouvelle approche pour détecter les défauts de conception, basé sur une technique d’apprentissage automatique — machines à vecteur de support — et prenant en compte les retours des praticiens. Grâce à une étude empirique portant sur trois systèmes et quatre défauts de conception, nous avons montré que la précision et le rappel de SMURF sont supérieurs à ceux de DETEX et BDTEX lors de la détection des occurrences de défauts de conception. Nous avons également montré que SMURF peut être appliqué à la fois dans les configurations intra-système et inter-système. Enfin, nous avons montré que la précision et le rappel de SMURF sont améliorés quand on prend en compte les retours des praticiens.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Objective: To evaluate an experimental heroin maintenance programme.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Improving the sustainability of the housing stock is a major challenge facing the UK social housing sector. UK social housing accounts for approximately 18% of total UK housing and generates maintenance costs in the region of 1.25 billion pounds per annum. The extent to which routine maintenance can be used as a vehicle to improve the overall sustainability (social, environmental and economic) of existing social housing is one focus of a 5 year EPSRC funded research programme. This paper reports the findings of a questionnaire survey examining current social housing maintenance practices and attitudes towards sustainability. The research found that, whilst the stock condition survey is the favoured format for determining maintenance need and economics the basis for priority setting; neither systematically addresses wider sustainability issues; and, whilst cost is a major barrier to more sustainable solutions being adopted, landlords are able and have the desire to improve their practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Presently the UK social housing stock accounts for approximately 18% of the total UK housing with maintenance costs in the region of £1.25 billion per annum. In terms of its impact on the environment, housing is generally responsible for approximately 27% of the UK’s CO2 emissions. The extent to which routine maintenance (planned preventative and responsive) can be used as a vehicle to improve the overall sustainability (social, environmental and economic) of existing social housing is one focus of a 5 year EPSRC funded research programme. This paper reports on the findings of a series of in-depth interviews with social housing providers examining current social housing maintenance practices and attitudes towards sustainability. This paper will report the initial findings of interviews and outline a new performance based multi-criteria maintenance model from which an AHP hierarchy will be presented, integrating the principles of sustainability into maintenance strategies

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study was to convert existing faba bean (Vicia faba L.) single nucleotide polymorphism (SNP) markers from cleaved amplification polymorphic sequences and SNaPshot® formats, which are expensive and time-consuming, to the more convenient KBiosciences competitive allele‐specific PCR (KASP) assay format. Out of 80 assays designed, 75 were validated, though a core set of 67 of the most robust markers is recommended for further use. The 67 best KASP SNP assays were used across two generations of single seed descent to detect unintended outcrossing and to track and quantify loss of heterozygosity, a capability that will significantly increase the efficiency and performance of pure line production and maintenance. This same set of assays was also used to examine genetic relationships between the 67 members of the partly inbred panel, and should prove useful for line identification and diversity studies in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Includes bibliography.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The thesis project has been developed in partnership with the Design Department of Blackshape Spa, a carbon – fiber ultra – light airplane company in Monopoli (Bari, Italy). The main goal is the assessment of a starting point for a damage tolerant concept during the design and certification phases of the Blackshape BS 115 airplane, with respect to EASA CS VLA & CS 23 Regulations. This approach has been carried out starting from an initial literary review as far as the way of modeling composites fractures is concerned. Further on, three finite element models have been generated and implemented in order to simulate defects occurring during manufacturing and service phases. At last, the procedures of non - destructive inspections have been taken into account, in order to establish how to investigate primary structures defects and delaminations during maintenance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a reliability analysis of a photovoltaic rural electrification (PVRE) programme is proposed considering the failures in the 13 000 installed Solar Home System (SHS) devices occurring over a long operating period of 5 years. A previous arrangement of the database and a brief explanation of the reliability concepts will serve to introduce the failure distribution of every component, from which the SHS lifetime operating features will be described. An application example will show the usefulness of the obtained results in the forecasting of spare parts during the maintenance period. The conclusions of this study may be useful in the scientific design of PVRE programme maintenance structures, with the goal of shedding some light on the technical management mechanisms in decentralised rural electrification.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Experiences in decentralized rural electrification programmes using solar home systems have suffered difficulties during the operation and maintenance phase, due in many cases, to the underestimation of the maintenance cost, because of the decentralized character of the activity, and also because the reliability of the solar home system components is frequently unknown. This paper reports on the reliability study and cost characterization achieved in a large photovoltaic rural electrification programme carried out in Morocco. The paper aims to determinate the reliability features of the solar systems, focusing in the in-field testing for batteries and photovoltaic modules. The degradation rates for batteries and PV modules have been extracted from the in-field experiments. On the other hand, the main costs related to the operation and maintenance activity have been identified with the aim of establishing the main factors that lead to the failure of the quality sustainability in many rural electrification programmes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an assessment and evaluation of the costs of operation and maintenance (O&M) in a real PV rural electrification (PVRE) programme, with the aim of characterizing its costs structure. Based on the extracted data of the 5-years operational costs of a private operator, the programme has been analyzed to take out the most relevant costs involved in the O&M phase as well as the comparative appraisal between the 3 main activities: installation, O&M and management. Through this study we try to answer to the new challenge of decentralized rural electrification based on larger programmes (with tens of thousands of SHSs) and longer maintenance and operation periods (at least 10 years).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Con 1.300 millones de personas en el mundo sin acceso a la electricidad (la mayoría en entornos rurales de países empobrecidos), la energía solar fotovoltaica constituye una solución viable técnica y económicamente para electrificar las zonas más remotas del planeta donde las redes eléctricas convencionales no llegan. Casi todos los países en el mundo han desarrollado algún tipo de programa de electrificación fotovoltaica rural durante los últimos 40 años, principalmente los países más pobres, donde a través de diferentes modelos de financiación, se han instalado millones de sistemas solares domiciliarios (pequeños sistemas fotovoltaicos para uso doméstico). Durante este largo período, se han ido superando muchas barreras, como la mejora de la calidad de los sistemas fotovoltaicos, la reducción de costes, la optimización del diseño y del dimensionado de los sistemas, la disponibilidad financiera para implantar programas de electrificación rural, etc. Gracias a esto, la electrificación rural descentralizada ha experimentado recientemente un salto de escala caracterizada por la implantación de grandes programas con miles de sistemas solares domiciliarios e integrando largos períodos de mantenimiento. Muchos de estos grandes programas se están llevando a cabo con limitado éxito, ya que generalmente parten de supuestos e hipótesis poco contrastadas con la realidad, comprometiendo así un retorno económico que permita el desarrollo de esta actividad a largo plazo. En este escenario surge un nuevo reto: el de cómo garantizar la sostenibilidad de los grandes programas de electrificación rural fotovoltaica. Se argumenta que la principal causa de esta falta de rentabilidad es el imprevisto alto coste de la fase de operación y mantenimiento. Cuestiones clave tales como la estructura de costes de operación y mantenimiento o la fiabilidad de los componentes del sistema fotovoltaico no están bien caracterizados hoy en día. Esta situación limita la capacidad de diseñar estructuras de mantenimiento capaces de asegurar la sostenibilidad y la rentabilidad del servicio de operación y mantenimiento en estos programas. Esta tesis doctoral tiene como objetivo responder a estas cuestiones. Se ha realizado varios estudios sobre la base de un gran programa de electrificación rural fotovoltaica real llevado a cabo en Marruecos con más de 13.000 sistemas solares domiciliarios instalados. Sobre la base de este programa se ha hecho una evaluación en profundidad de la fiabilidad de los sistemas solares a partir de los datos de mantenimiento recogidos durante 5 años con más de 80.000 inputs. Los resultados han permitido establecer las funciones de fiabilidad de los equipos tal y como se comportan en condiciones reales de operación, las tasas de fallos y los tiempos medios hasta el fallo para los principales componentes del sistema, siendo este el primer caso de divulgación de resultados de este tipo en el campo de la electrificación rural fotovoltaica. Los dos principales componentes del sistema solar domiciliario, la batería y el módulo fotovoltaico, han sido analizados en campo a través de una muestra de 41 sistemas trabajando en condiciones reales pertenecientes al programa solar marroquí. Por un lado se ha estudiado la degradación de la capacidad de las baterías y por otro la degradación de potencia de los módulos fotovoltaicos. En el caso de las baterías, los resultados nos han permitido caracterizar la curva de degradación en capacidad llegando a obtener una propuesta de nueva definición del umbral de vida útil de las baterías en electrificación rural. También sobre la base del programa solar de Marruecos se ha llevado a cabo un estudio de caracterización de los costes reales de operación y mantenimiento a partir de la base de datos de contabilidad del programa registrados durante 5 años. Los resultados del estudio han permitido definir cuáles son costes que más incidencia tienen en el coste global. Se han obtenido los costes unitarios por sistema instalado y se han calculado los montantes de las cuotas de mantenimiento de los usuarios para garantizar la rentabilidad de la operación y mantenimiento. Finalmente, se propone un modelo de optimización matemática para diseñar estructuras de mantenimiento basado en los resultados de los estudios anteriores. La herramienta, elaborada mediante programación lineal entera mixta, se ha aplicado al programa marroquí con el fin de validar el modelo propuesto. ABSTRACT With 1,300 million people worldwide deprived of access to electricity (mostly in rural environments), photovoltaic solar energy has proven to be a cost‐effective solution and the only hope for electrifying the most remote inhabitants of the planet, where conventional electric grids do not reach because they are unaffordable. Almost all countries in the world have had some kind of rural photovoltaic electrification programme during the past 40 years, mainly the poorer countries, where through different organizational models, millions of solar home systems (small photovoltaic systems for domestic use) have been installed. During this long period, many barriers have been overcome, such as quality enhancement, cost reduction, the optimization of designing and sizing, financial availability, etc. Thanks to this, decentralized rural electrification has recently experienced a change of scale characterized by new programmes with thousands of solar home systems and long maintenance periods. Many of these large programmes are being developed with limited success, as they have generally been based on assumptions that do not correspond to reality, compromising the economic return that allows long term activity. In this scenario a new challenge emerges, which approaches the sustainability of large programmes. It is argued that the main cause of unprofitability is the unexpected high cost of the operation and maintenance of the solar systems. In fact, the lack of a paradigm in decentralized rural services has led to many private companies to carry out decentralized electrification programmes blindly. Issues such as the operation and maintenance cost structure or the reliability of the solar home system components have still not been characterized. This situation does not allow optimized maintenance structure to be designed to assure the sustainability and profitability of the operation and maintenance service. This PhD thesis aims to respond to these needs. Several studies have been carried out based on a real and large photovoltaic rural electrification programme carried out in Morocco with more than 13,000 solar home systems. An in‐depth reliability assessment has been made from a 5‐year maintenance database with more than 80,000 maintenance inputs. The results have allowed us to establish the real reliability functions, the failure rate and the main time to failure of the main components of the system, reporting these findings for the first time in the field of rural electrification. Both in‐field experiments on the capacity degradation of batteries and power degradation of photovoltaic modules have been carried out. During the experiments both samples of batteries and modules were operating under real conditions integrated into the solar home systems of the Moroccan programme. In the case of the batteries, the results have enabled us to obtain a proposal of definition of death of batteries in rural electrification. A cost assessment of the Moroccan experience based on a 5‐year accounting database has been carried out to characterize the cost structure of the programme. The results have allowed the major costs of the photovoltaic electrification to be defined. The overall cost ratio per installed system has been calculated together with the necessary fees that users would have to pay to make the operation and maintenance affordable. Finally, a mathematical optimization model has been proposed to design maintenance structures based on the previous study results. The tool has been applied to the Moroccan programme with the aim of validating the model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Twelve families responded to posters displayed in a methadone clinic for inclusion in a pilot study assessing the viability and potential utility of an intensive, multi-component family-focused intervention, the Parents Under Pressure programme. The programme was designed to improve child behaviour, decrease parental stress and improve family functioning in methadone-maintained families by targeting affect regulation, mood, views of self as a parent, drug use and parenting skills. Nine of the families completed the programme delivered in their homes; eight were recontacted at 3 months. Each family reported significant improvements in three domains: parental functioning, parent - child relationship and parental substance use and risk behaviour. In addition to the changes in family functioning, the majority of families reported a decrease in concurrent alcohol use, HIV risk-taking behaviour and maintenance dose of methadone. The families reported high levels of satisfaction with the programme. It is recommended that future studies include independent measures (e.g. behavioural observations) of child outcome and parental functioning. The results were optimistic and provided the impetus to evaluate the treatment programme using a randomized controlled trial.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of Total Productive Maintenance (TPM) is to maximise plant and equipment effectiveness, to create a sense of ownership for operators, and promote continuous improvement through small group activities involving production, engineering and maintenance personnel. This paper describes and analyses a case study of TPM implementation at a newspaper printing house in Singapore. However, rather than adopting more conventional implementation methods such as employing consultants or through a project using external training, a unique approach was adopted based on Action Research using a spiral of cycles of planning, acting observing and reflecting. An Action Research team of company personnel was specially formed to undertake the necessary fieldwork. The team subsequently assisted with administering the resulting action plan. The main sources of maintenance and operational data were from interviews with shop floor workers, participative observation and reviews conducted with members of the team. Content analysis using appropriate statistical techniques was used to test the significance of changes in performance between the start and completion of the TPM programme. The paper identifies the characteristics associated with the Action Research method when used to implement TPM and discusses the applicability of the approach in related industries and processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved. Acknowledgements This review is one of a series of systematic reviews for the ROMEO project (Review Of MEn and Obesity), funded by the National Institute for Health Research, Health Technology Assessment Programme (NIHR HTA Project 09/127/01; Systematic reviews and integrated report on the quantitative and qualitative evidence base for the management of obesity in men http://www.hta.ac.uk/2545). The views and opinions expressed therein are those of the authors and do not necessarily reflect those of the Department of Health. HERU, HSRU and NMAHP are funded by the Chief Scientist Office of the Scottish Government Health and Social Care Directorates. The authors accept full responsibility for this publication. We would also like to thank the Men's Health Forums of Scotland, Ireland, England and Wales: Tim Street, Paula Carroll, Colin Fowler and David Wilkins. We also thank Kate Jolly for further information about the Lighten Up trial.