936 resultados para Long-term operational planning
Resumo:
Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper
Resumo:
Evolving family structure and economic conditions may affect individuals' ability and willingness to plan for future long-term care (LTC) needs. We applied life course constructs to analyze focus group data from a study of family decision making about LTC insurance. Participants described how past exposure to caregiving motivated them to engage in LTC planning; in contrast, child rearing discouraged LTC planning. Perceived institutional and economic instability drove individuals to regard financial LTC planning as either a wise precaution or another risk. Perceived economic instability also shaped opinions that adult children are ill-equipped to support parents' LTC. Despite concerns about viability of social insurance programs, some participants described strategies to maximize gains from them. Changing norms around aging and family roles also affected expectations of an active older age, innovative LTC options, and limitations to adult children's involvement. Understanding life course context can inform policy efforts to encourage LTC planning.
Resumo:
This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.
Resumo:
On 17-20 July 2007, 45 experts on sea turtles, fisheries, conservation and finance from 10 countries convened at the Bellagio Sea Turtle Conservation Initiative workshop in Terengganu to focus on methods to save the imperiled Pacific leatherback from extinction. The group developed a strategic plan to guide the prioritization and long term financing of Pacific leatherback turtle conservation and recovery objectives. Participants identified critical conservation actions and agreed that a business plan is urgently needed to reverse the trajectory towards extinction of the Pacific leatherback. The conservation actions prioritized by the participants encompassed protecting nesting beaches including eggs and nesting females; reducing direct and indirect turtle take in coastal fisheries; and strengthening regional and sub-regional cooperation. The group committed to work together on fundraising and implementation of these urgent conservation actions. This report presents outputs and the plan that was produced from the workshop.
Resumo:
Following automation of lighthouses around the coastline of Ireland, reports of accelerated deterioration of interior granite stonework have increased significantly with an associated deterioration in the historic structure and rise in related maintenance costs. Decay of granite stone- work primarily occurs through granular disintegration with the effective grusification of granite surfaces. A decay gradient exists within the towers whereby the condition of granite in the lower levels is much worse than elsewhere. The lower tower levels are also regions with highest rela- tive humidity values and greatest salt concentrations. Data indicate that post-automation decay may have been trig- gered by a change in micro-environmental conditions within the towers associated with increased episodes of condensation on stone surfaces. This in turn appears to have facilitated deposition and accumulation of hygro- scopic salts (e.g. NaCl) giving rise to widespread evidence of deliquescence in the lower tower levels. Evidence indicates that the main factors contributing to accelerated deterioration of interior granite stonework are changes in micro-environmental conditions, salt weathering, chemical weathering through the corrosive effect of strongly alkaline conditions on alumino-silicate minerals within the granite and finally, the mica-rich characteristics of the granite itself which increases its structural and chemical susceptibility to subaerial weathering processes by creating points of weakness within the granite. This case study demonstrates how seemingly minor changes in micro-environmental conditions can unintentionally trigger the rapid and extensive deterioration of a previously stable rock type and threaten the long-term future of nationally iconic opera- tional historic structures.
Resumo:
The simulated annealing optimization technique has been successfully applied to a number of electrical engineering problems, including transmission system expansion planning. The method is general in the sense that it does not assume any particular property of the problem being solved, such as linearity or convexity. Moreover, it has the ability to provide solutions arbitrarily close to an optimum (i.e. it is asymptotically convergent) as the cooling process slows down. The drawback of the approach is the computational burden: finding optimal solutions may be extremely expensive in some cases. This paper presents a Parallel Simulated Annealing, PSA, algorithm for solving the long term transmission network expansion planning problem. A strategy that does not affect the basic convergence properties of the Sequential Simulated Annealing algorithm have been implementeded and tested. The paper investigates the conditions under which the parallel algorithm is most efficient. The parallel implementations have been tested on three example networks: a small 6-bus network, and two complex real-life networks. Excellent results are reported in the test section of the paper: in addition to reductions in computing times, the Parallel Simulated Annealing algorithm proposed in the paper has shown significant improvements in solution quality for the largest of the test networks.
Resumo:
Includes bibliography
Resumo:
Includes bibliography
Resumo:
Effective July 21, 1977.
Resumo:
Az EU-ban, a mai állapotok szerint, csak „transzferunióról” beszélhetünk és nem egységes piacról. Az eurós pénzfolyamatok eltorzítva közvetítik a versenyképességet is: mind az árukban és vagyontárgyakban, mind – főleg – a pénzügyi eszközökben megtestesült munkákat/teljesítményeket rosszul árazzák. Egy ilyen keretben különösen könnyen alakul ki az, amit potyautas-problémának nevezünk, vagyis ahol tényleges vagy mérhető teljesítményleadás, vagy éppen fizetés nélkül lehet fogyasztani, és túl olcsón lehet szabad forrásokhoz jutni. Az eurózóna számos közvetítő mechanizmusában is tökéletlen. A sok, szuverénadósság-présbe került tagország között van kicsi, közepes és nagy is. Ez a tény, valamint az általános növekedési és munkapiaci problémák, egyértelműen „rendszerszintű zavarokat” jeleznek, amelyeket ebben a dolgozatban teljesítmény közvetítési-átviteli problémának hívunk, és ezért egy szokatlan, ám annál beszédesebb, elektromosenergia-átviteli rendszeranalógiával segítünk értelmezni. Megmutatjuk, hogy egy jó nagyvállalat miért jobb pénzügyi tervező, mint egy azonos méretű állam. _____ Why are ill-defined transfer mechanisms diverting valuable assets and resources to the wrong destination within the EU? Why do we witness ongoing pressure in the EU banking sector and in government finances? We offer an unusual answer to these questions: we apply an analogy from physics (from an electric generation and distribution network) to show the transmission inefficiency and waste, respectively, of the EU distribution mechanisms. We demonstrate that there are inherent flaws in both the measurement and in the distribution of assets and resources amongst the key EU markets: goods, money and factor markets. In addition, we find that when international equalizer mechanism is at work (cohesion funds allocated), many of these equity functions are at risk with respect to their reliable measurement. Especially are at risk the metered load factors, likewise the loss/waste factors. The map of desired outcomes does not match the real outcome, since EUtransfers in general are put to work with low efficiency.