976 resultados para Load power


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Load modelling plays an important role in power system dynamic stability assessment. One of the widely used methods in assessing load model impact on system dynamic response is parametric sensitivity analysis. A composite load model-based load sensitivity analysis framework is proposed. It enables comprehensive investigation into load modelling impacts on system stability considering the dynamic interactions between load and system dynamics. The effect of the location of individual as well as patches of composite loads in the vicinity on the sensitivity of the oscillatory modes is investigated. The impact of load composition on the overall sensitivity of the load is also investigated.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

“Hardware in the Loop” (HIL) testing is widely used in the automotive industry. The sophisticated electronic control units used for vehicle control are usually tested and evaluated using HIL-simulations. The HIL increases the degree of realistic testing of any system. Moreover, it helps in designing the structure and control of the system under test so that it works effectively in the situations that will be encountered in the system. Due to the size and the complexity of interaction within a power network, most research is based on pure simulation. To validate the performance of physical generator or protection system, most testing is constrained to very simple power network. This research, however, examines a method to test power system hardware within a complex virtual environment using the concept of the HIL. The HIL testing for electronic control units and power systems protection device can be easily performed at signal level. But performance of power systems equipments, such as distributed generation systems can not be evaluated at signal level using HIL testing. The HIL testing for power systems equipments is termed here as ‘Power Network in the Loop’ (PNIL). PNIL testing can only be performed at power level and requires a power amplifier that can amplify the simulation signal to the power level. A power network is divided in two parts. One part represents the Power Network Under Test (PNUT) and the other part represents the rest of the complex network. The complex network is simulated in real time simulator (RTS) while the PNUT is connected to the Voltage Source Converter (VSC) based power amplifier. Two way interaction between the simulator and amplifier is performed using analog to digital (A/D) and digital to analog (D/A) converters. The power amplifier amplifies the current or voltage signal of simulator to the power level and establishes the power level interaction between RTS and PNUT. In the first part of this thesis, design and control of a VSC based power amplifier that can amplify a broadband voltage signal is presented. A new Hybrid Discontinuous Control method is proposed for the amplifier. This amplifier can be used for several power systems applications. In the first part of the thesis, use of this amplifier in DSTATCOM and UPS applications are presented. In the later part of this thesis the solution of network in the loop testing with the help of this amplifier is reported. The experimental setup for PNIL testing is built in the laboratory of Queensland University of Technology and the feasibility of PNIL testing has been evaluated using the experimental studies. In the last section of this thesis a universal load with power regenerative capability is designed. This universal load is used to test the DG system using PNIL concepts. This thesis is composed of published/submitted papers that form the chapters in this dissertation. Each paper has been published or submitted during the period of candidature. Chapter 1 integrates all the papers to provide a coherent view of wide bandwidth switching amplifier and its used in different power systems applications specially for the solution of power systems testing using PNIL.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

An isolated wind power generation scheme using slip ring induction machine (SRIM) is proposed. The proposed scheme maintains constant load voltage and frequency irrespective of the wind speed or load variation. The power circuit consists of two back-to-back connected inverters with a common dc link, where one inverter is directly connected to the rotor side of SRIM and the other inverter is connected to the stator side of the SRIM through LC filter. Developing a negative sequence compensation method to ensure that, even under the presence of unbalanced load, the generator experiences almost balanced three-phase current and most of the unbalanced current is directed through the stator side converter is the focus here. The SRIM controller varies the speed of the generator with variation in the wind speed to extract maximum power. The difference of the generated power and the load power is either stored in or extracted from a battery bank, which is interfaced to the common dc link through a multiphase bidirectional fly-back dc-dc converter. The SRIM control scheme, maximum power point extraction algorithm and the fly-back converter topology are incorporated from available literature. The proposed scheme is both simulated and experimentally verified.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This study presents a novel magnetic arm-switch-based integrated magnetic circuit for a three-phase series-shunt compensated uninterruptible power supply (UPS). The magnetic circuit acts as a common interacting field for a number of energy ports, viz., series inverter, shunt inverter, grid and load. The magnetic arm-switching technique ensures equivalent series or shunt connection between the inverters. In normal grid mode (stabiliser mode), the series inverter is used for series voltage correction and the shunt one for current correction. The inverters and the load are effectively connected in parallel when the grid power is not available. These inverters are then used to share the load power. The operation of the inverters in parallel is ensured by the magnetic arm-switching technique. This study also includes modelling of the magnetic circuit. A graphical technique called bond graph is used to model the system. In this model, the magnetic circuit is represented in terms of gyrator-capacitors. Therefore the model is also termed as gyrator-capacitor model. The model is used to extract the dynamic equations that are used to simulate the system using MATLAB/SIMULINK. This study also discusses a synchronously rotating reference frame-based control technique that is used for the control of the series and shunt inverters in different operating modes. Finally, the gyrator-capacitor model is validated by comparing the simulated and experimental results.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The increasing integration of larger amounts of wind energy into power systems raises important operational issues, such as the balance between power generation and demand. The pumped storage hydro (PSH) units are one possible solution to mitigate this problem, once they can store the excess of energy in the periods of higher generation and lower demand. However, the behaviour of a PSH unit may differ considerably from the expected in terms of wind power integration when it operates in a liberalized electricity market under a price-maker context. In this regard, this paper models and computes the optimal PSH weekly scheduling in a price-taker and price-maker scenarios, either when the PSH unit operates in standalone and integrated in a portfolio of other generation assets. Results show that the price-maker standalone PSH will integrate less wind power in comparison with the price-taker situation. Moreover, when the PSH unit is integrated in a portfolio with a base load power plant, the role of the price elasticity of demand may completely change the operational profile of the PSH unit. (C) 2014 Elsevier Ltd. All rights reserved.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In order to contribute to the discussion of defining a generalized power theory, valid for unbalanced and non linear circuits, this paper discusses the relationship and discrepancies among four modern power theories. Three-phase four-wire circuits, under different conditions, have been analyzed, since the most conflicting and intriguing interpretations take place in case of return conductor occurrence. Simulation results of different load, power supply and line conditions will be discussed in order to elucidate the author's conclusions and to provoke the readers for additional discussions. © 2010 IEEE.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A solar power satellite is paid attention to as a clean, inexhaustible large- scale base-load power supply. The following technology related to beam control is used: A pilot signal is sent from the power receiving site and after direction of arrival estimation the beam is directed back to the earth by same direction. A novel direction-finding algorithm based on linear prediction technique for exploiting cyclostationary statistical information (spatial and temporal) is explored. Many modulated communication signals exhibit a cyclostationarity (or periodic correlation) property, corresponding to the underlying periodicity arising from carrier frequencies or baud rates. The problem was solved by using both cyclic second-order statistics and cyclic higher-order statistics. By evaluating the corresponding cyclic statistics of the received data at certain cycle frequencies, we can extract the cyclic correlations of only signals with the same cycle frequency and null out the cyclic correlations of stationary additive noise and all other co-channel interferences with different cycle frequencies. Thus, the signal detection capability can be significantly improved. The proposed algorithms employ cyclic higher-order statistics of the array output and suppress additive Gaussian noise of unknown spectral content, even when the noise shares common cycle frequencies with the non-Gaussian signals of interest. The proposed method completely exploits temporal information (multiple lag ), and also can correctly estimate direction of arrival of desired signals by suppressing undesired signals. Our approach was generalized over direction of arrival estimation of cyclostationary coherent signals. In this paper, we propose a new approach for exploiting cyclostationarity that seems to be more advanced in comparison with the other existing direction finding algorithms.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

There is a paucity of evidence-based support for the allocation of rest interval duration between incremental loads in the assessment of the load-power profile. We examined the effect of rest interval duration on muscular power production in the load-power profile and sought to determine if greater rest is required with increasing load (i.e., variable rest interval). Ten physically trained men completed 4 experimental conditions in a crossover balanced design. Participants performed jump squats across incremental loads (0-60 kg) on 4 occasions, with an allocated recovery interval of 1, 2, 3, or 4 minutes. The mean log-transformed power output at each load was used for comparison between conditions (rest intervals). Unloaded jump squats (0 kg) maximized power output at each condition. The maximal mechanical power output was 66.6 ± 6.5 W·kg (1 minute), 66.2 ± 5.2 W·kg (2 minutes), 67.1 ± 5.9 W·kg (3 minutes), and 66.2 ± 6.5 W·kg (4 minutes). Trivial or unclear differences in power output were observed between rest intervals at each incremental load. As expected, power declined per 10 kg increment in load, the magnitude of decrease was 13.9-14.5% (confidence limits [CL]: ±1.3-2.0%) and 13.4-14.6% (CL: ±2.4-3.9%) for relative peak and mean power, respectively, yet differences in power output between conditions were likely insubstantial. The prescription of rest intervals between loads that are longer than 1 minute have a likely negligible effect on muscular power production in the jump squat incremental load-power profile. Practitioners should select either a 1- to 4-minute rest interval to best accommodate the logistical constraints of their monitoring sessions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Training at the load that maximizes peak mechanical power (Pmax) is considered superior for the development of power. We aimed to identify the Pmax load ('optimal load') in the jump squat and to quantify small, moderate, large, and very large substantial differences in power output across a spectrum of loads to identify loads that are substantially different to the optimal, and lastly, to investigate the nature of power production (load-force-velocity profiles). Professional Australian Rules Football (ARF; n = 16) and highly trained Rugby Union (RU; n = 20) players (subdivided into stronger [SP] vs. weaker [WP] players) performed jump squats across incremental loads (0-60 kg). Substantial differences in peak power (W·kg(-1)) were quantified as 0.2-2.0 of the log transformed between-athlete SD at each load, backtransformed and expressed as a percent with 90% confidence limits (CL). A 0-kg jump squat maximized peak power (ARF: 57.7 ± 10.8 W·kg(-1); RU: 61.4 ± 8.5 W·kg(-1); SP: 64.4 ± 7.5 W·kg(-1); WP: 54.8 ± 9.5 W·kg(-1)). The range for small to very large substantial differences in power output was 4.5-55.9% (CL: ×/÷1.36) and 2.8-32.4% (CL: ×/÷1.31) in ARF and RU players, whereas in SP and WP, it was 3.7-43.1% (CL: ×/÷1.32) and 4.3-51.7% (CL: ×/÷1.36). Power declined per 10-kg increment in load, 14.1% (CL: ±1.6) and 10.5% (CL: ±1.5) in ARF and RU players and 12.8% (CL: ±1.9) and 11.3% (CL: ±1.7) in SP and WP. The use of a 0-kg load is superior for the development of jump squat maximal power, with moderate to very large declines in power output observed at 10- to 60-kg loads. Yet, performance of heavier load jump squats that are substantially different to the optimal load are important in the development of sport-specific force-velocity qualities and should not be excluded.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, the optimal allocation and sizing of distributed generators (DGs) in a distribution system is studied. To achieve this goal, an optimization problem should be solved in which the main objective is to minimize the DGs cost and to maximise the reliability simultaneously. The active power balance between loads and DGs during the isolation time is used as a constraint. Another point considered in this process is the load shedding. It means that if the summation of DGs active power in a zone, isolated by the sectionalizers because of a fault, is less than the total active power of loads located in that zone, the program start shedding the loads in one-by-one using the priority rule still the active power balance is satisfied. This assumption decreases the reliability index, SAIDI, compared with the case loads in a zone are shed when total DGs power is less than the total load power. To validate the proposed method, a 17-bus distribution system is employed and the results are analysed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The paper proposes a solution for testing of a physical distributed generation system (DGs) along with a computer simulated network. The computer simulated network is referred as the virtual grid in this paper. Integration of DG with the virtual grid provides broad area of testing of power supplying capability and dynamic performance of a DG. It is shown that a DG can supply a part of load power while keeping Point of Common Coupling (PCC) voltage magnitude constant. To represent the actual load, a universal load along with power regenerative capability is designed with the help of voltage source converter (VSC) that mimics the load characteristic. The overall performance of the proposed scheme is verified using computer simulation studies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, a new three-phase, five-level inverter topology with a single-dc source is presented. The proposed topology is obtained by cascading a three-level flying capacitor inverter with a flying H-bridge power cell in each phase. This topology has redundant switching states for generating different pole voltages. By selecting appropriate switching states, the capacitor voltages can be balanced instantaneously (as compared to the fundamental) in any direction of the current, irrespective of the load power factor. Another important feature of this topology is that if any H-bridge fails, it can be bypassed and the configuration can still operate as a three-level inverter at its full power rating. This feature improves the reliability of the circuit. A 3-kW induction motor is run with the proposed topology for the full modulation range. The effectiveness of the capacitor balancing algorithm is tested for the full range of speed and during the sudden acceleration of the motor.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a multilevel inverter topology suitable for the generation of dodecagonal space vectors instead of hexagonal space vectors as in the case of conventional schemes. This feature eliminates all the 6n +/- 1 (n = odd) harmonics from the phase voltages and currents in the entire modulation range with an increase in the linear modulation range. The topology is realized by flying capacitor-based three-level inverters feeding from two ends of an open-end winding induction motor with asymmetric dc links. The flying capacitor voltages are tightly controlled throughout the modulation range using redundant switching states for any load power factor. A simple and fast carrier-based space-vector pulsewidth modulation (PWM) scheme is also proposed for the topology which utilizes only the sampled amplitudes of the reference wave for the PWM timing computation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In the present paper, a novel topology for generating a 17-level inverter using three-level flying capacitor inverter and cascaded H-bridge modules with floating capacitors. The proposed circuit is analyzed and various aspects of it are presented in the paper. This circuit is experimentally verified and the results are shown. The stability of the capacitor balancing algorithm has been verified during sudden acceleration. This circuit has many pole voltage redundancies. This circuit has an advantage of balancing all the capacitor voltages instantaneously by switching through the redundancies. Another advantage of this topology is its ability to generate all the 17 pole voltages from a single DC link which enables back to back converter operation. Also, the proposed inverter can be operated at all load power factors and modulation indices. Another advantage is, if one of the H-bridges fail, the inverter can still be operated at full load with reduced number of levels.