51 resultados para Levee systemReliabilityFragility CurveOvertoppingPipingClassificationHazard


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Other Audit Reports

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Disaster Grants – Public Assistance program of the Green Bay Levee and Drainage District in Lee County, Iowa for the year ended June 30, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Disaster Grants – Public Assistance program of the Iowa River - Flint Creek Levee District in Des Moines County and Louisa County, Iowa for the year ended June 30, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work aims to evaluate the reliability of these levee systems, calculating the probability of “failure” of determined levee stretches under different loads, using probabilistic methods that take into account the fragility curves obtained through the Monte Carlo Method. For this study overtopping and piping are considered as failure mechanisms (since these are the most frequent) and the major levee system of the Po River with a primary focus on the section between Piacenza and Cremona, in the lower-middle area of the Padana Plain, is analysed. The novelty of this approach is to check the reliability of individual embankment stretches, not just a single section, while taking into account the variability of the levee system geometry from one stretch to another. This work takes also into consideration, for each levee stretch analysed, a probability distribution of the load variables involved in the definition of the fragility curves, where it is influenced by the differences in the topography and morphology of the riverbed along the sectional depth analysed as it pertains to the levee system in its entirety. A type of classification is proposed, for both failure mechanisms, to give an indication of the reliability of the levee system based of the information obtained by the fragility curve analysis. To accomplish this work, an hydraulic model has been developed where a 500-year flood is modelled to determinate the residual hazard value of failure for each stretch of levee near the corresponding water depth, then comparing the results with the obtained classifications. This work has the additional the aim of acting as an interface between the world of Applied Geology and Environmental Hydraulic Engineering where a strong collaboration is needed between the two professions to resolve and improve the estimation of hydraulic risk.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

F also available in microfiche.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A recommendation to use a portion of the Illinois General Assembly's appropriation for the Wood River Drainage and Levee District--funds to help defray the District's funding requirements associated with U.S. Army Corps of Engineers' projects--for the construction of the Grassy Lake Pump Station to alleviate interior flooding within the District.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This material is based upon work supported by the National Science Foundation through the Florida Coastal Everglades Long-Term Ecological Research program under Cooperative Agreements #DBI-0620409 and #DEB-9910514. This image is made available for non-commercial or educational use only.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This material is based upon work supported by the National Science Foundation through the Florida Coastal Everglades Long-Term Ecological Research program under Cooperative Agreements #DBI-0620409 and #DEB-9910514. This image is made available for non-commercial or educational use only.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Examination of the mechanisms involved in the construction of present-day vegetative deposits along coastal waterways has made it possible to establish depositional patterns that can be compared with those found in similar environments in geologic time. These patterns include not only the composition and transport of the debris but also an estimation of the time involved in its deposition. Six sites with active deposits of plant macrodebris in the coastal basin of the Itanhaem River, Sao Paulo State, Brazil, were used in the study. In the central portion of the basin, the interior coastal plain is covered with restinga forest (dense, wet tropical forest of low altitudes), while the lower portion consists of mangrove swamps. The coast reflects anthropogenic intervention, and only a few scattered remnants of precolonization dune vegetation remain. The results after three years of study suggest that the accumulation of plant macrodebris in the middle and lower portions of the basin is parautochthonous, since only the leaves of genera typical of the restinga forest and mangrove swamp, respectively, were found. Along the coast the accumulations involved a mixture of parautochthonous and allochthonous elements. On the levee of the Branco River and within the mangrove swamp, deposition was slow, and many of the elements decayed quickly; such accumulations show little potential for preservation and eventual fossilization. A different site, however, reveals the rapid deposition of thick layers of plant debris, presumably associated with storms, and these accumulations are preserved for long periods, constituting good candidates for possible fossilization.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.