985 resultados para LOB, repetitive construction, scheduling, work continuity, waste


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Line of Balance (LOB) scheduling technique is a significant technique that plays a vital role in repetitive construction projects. It became more demanding in the construction industry due to the construction of mega repetitive projects e.g. housing schemes, high rise buildings, railways and highways, etc. This paper aims to evaluate the real application of LOB in repetitive housing projects in the UAE which could fill the gap as there is lack of similar empirical studies in the Middle East. The paper firstly presents a concise literature review on the application and limitation of LOB comparing to CPM in repetitive projects. Then, a case study of 275 villas housing project in the UAE is demonstrated and analysed, where LOB technique was used and monitored throughout the lifecycle of the project. The findings point out significant controlling benefits of using LOB comparing with CPM in the project and address some limitations hindering the efficient use of LOB in the UAE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Research, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Research, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Research, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Federal Highway Administration, Office of Research, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article reports on a cross-sectional case study of a large construction project in which Electronic document management (EDM) was used. Attitudes towards EDM from the perspective of individual end users were investigated. Responses from a survey were combined with data from system usage log files to obtain an overview of attitudes prevalent in different user segments of the total population of 334 users. The survey was followed by semi-structured interviews with representative users. A strong majority of users from all segments of the project group considered EDM as a valuable aid in their work processes, despite certain functional limitations of the system used and the complexity of the information mass. Based on the study a model describing the key factors affecting end user EDM adoption is proposed. The model draws on insight from earlier studies of EDM enabled projects and theoretical frameworks on technology acceptance and success of information systems, as well as the insights gained from the case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information technologies are used across all stages of the construction process, and are crucial in the delivery of large projects. Drawing on detailed research on a construction megaproject, we take a practice-based approach to examining the practical and theoretical tensions between existing ways of working and the introduction of new coordination tools in this paper. We analyze the new hybrid practices that emerge, using insights from actor-network theory to articulate the delegation of actions to material and digital objects within ecologies of practice. The three vignettes that we discuss highlight this delegation of actions, the “plugging” and “patching” of ecologies occurring across media and the continual iterations of working practices between different types of media. By shifting the focus from tools to these wider ecologies of practice, the approach has important managerial mplications for the stabilization of new technologies and practices and for managing technological change on large construction projects. We conclude with a discussion of new directions for research, oriented to further elaborating on the importance of the material in understanding change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Malcolm Payne’s latest work proposes to survey the continuity and change in social work from its inception and origins, up until the present day. In order to do justice to the theme, its author could have concentrated on developing a narrative of a national enterprise, or restricted himself to a regional analysis (Western European Social Work) or opt instead for a more narrowly focused cultural exploration, White Anglo-Saxon Social Work (WASSW). One can only infer that limiting himself in this fashion would have struck the author as parochial, or rather, that only a truly global enterprise could satisfy his capacious mind. One is left to marvel at the invocation of Darwin’s great work and wonder what was the process of the author’s “natural” selection of this material.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Highway Safety Manual (HSM) is the compilation of national safety research that provides quantitative methods for analyzing highway safety. The HSM presents crash modification functions related to freeway work zone characteristics such as work zone duration and length. These crash modification functions were based on freeway work zones with high traffic volumes in California. When the HSM-referenced model was calibrated for Missouri, the value was 3.78, which is not ideal since it is significantly larger than 1. Therefore, new models were developed in this study using Missouri data to capture geographical, driver behavior, and other factors in the Midwest. Also, new models for expressway and rural two-lane work zones that barely were studied in the literature were developed. A large sample of 20,837 freeway, 8,993 expressway, and 64,476 rural two-lane work zones in Missouri was analyzed to derive 15 work zone crash prediction models. The most appropriate samples of 1,546 freeway, 1,189 expressway, and 6,095 rural two-lane work zones longer than 0.1 mile and with a duration of greater than 10 days were used to make eight, four, and three models, respectively. A challenging question for practitioners is always how to use crash prediction models to make the best estimation of work zone crash count. To solve this problem, a user-friendly software tool was developed in a spreadsheet format to predict work zone crashes based on work zone characteristics. This software selects the best model, estimates the work zone crashes by severity, and converts them to monetary values using standard crash estimates. This study also included a survey of departments of transportation (DOTs), Federal Highway Administration (FHWA) representatives, and contractors to assess the current state of the practice regarding work zone safety. The survey results indicate that many agencies look at work zone safety informally using engineering judgment. Respondents indicated that they would like a tool that could help them to balance work zone safety across projects by looking at crashes and user costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to focus on the identification of the existing capacities of post disaster C&D waste management in developing countries, with a special emphasis on Sri Lanka to determine the capacity gaps and related influencing factors.

Design/methodology/approach – Multiple case studies and expert interviews were conducted to gather primary information on the existing capacities of disaster C&D waste management. Three case studies, including 15 individuals and six experts representing government, non-government institutions and others, were selected.

Findings – The results revealed the existing capacities, capacity gaps and influencing factors for post disaster C&D waste management in the areas of skills and confidence building, links and collaborations, continuity and sustainability, research and development, communication andcoordination, organisational implementation and investment in infrastructure.

Research limitations/implications – This study limited disaster C&D waste to debris generated from totally or partially damaged buildings and infrastructure as a direct impact of natural disasters orfrom demolished buildings and infrastructure at rehabilitation or at early recovery stages.

Originality/value – The research enabled an analysis of existing capacities and identified capacity gaps in post disaster C&D waste management with influencing factors developing countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.