853 resultados para Knowledge Management Maturity Model


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The dynamic capabilities view (DCV) focuses on renewal of firms’ strategic knowledge resources so as to sustain competitive advantage within turbulent markets. Within the context of the DCV, the focus of knowledge management (KM) is to develop the KMC through deploying knowledge governance mechanisms that are conducive to facilitating knowledge processes so as to produce superior business performance over time. The essence of KM performance evaluation is to assess how well the KMC is configured with knowledge governance mechanisms and processes that enable a firm to achieve superior performance through matching its knowledge base with market needs. However, little research has been undertaken to evaluate KM performance from the DCV perspective. This study employed a survey study design and adopted hypothesis-testing approaches to develop a capability-based KM evaluation framework (CKMEF) that upholds the basic assertions of the DCV. Under the governance of the framework, a KM index (KMI) and a KM maturity model (KMMM) were derived not only to indicate the extent to which a firm’s KM implementations fulfill its strategic objectives, and to identify the evolutionary phase of its KMC, but also to bench-mark the KMC in the research population. The research design ensured that the evaluation framework and instruments have statistical significance and good generalizabilty to be applied in the research population, namely construction firms operating in the dynamic Hong Kong construction market. The study demonstrated the feasibility of quantitatively evaluating the development of the KMC and revealing the performance heterogeneity associated with the development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Business Process Management (BPM) has been identified as the number one business priority by a recent Gartner study (Gartner, 2005). However, BPM has a plethora of facets as its origins are in Business Process Reengineering, Process Innovation, Process Modelling, and Workflow Management to name a few. Organisations increasingly recognize the requirement for an increased process orientation and require appropriate comprehensive frameworks, which help to scope and evaluate their BPM initiative. This research project aims toward the development of a holistic and widely accepted BPM maturity model, which facilitates the assessment of BPM capabilities. This paper provides an overview about the current model with a focus on the actual model development utilizing a series of Delphi studies. The development process includes separate studies that focus on further defining and expanding the six core factors within the model, i.e. strategic alignment, governance, method, Information Technology, people and culture.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Assess your current records management measures

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is an exploratory study to scrutinise Project Knowledge Management in Project-Based Organisations, specifically in the Project Management Office (PMO). It is the first attempt to investigate the maturity of Project Management, from a Knowledge Management perspective. The findings of this study address multiple Knowledge Management processes and practices to both assess the level of Knowledge Management Maturity in PMOs, and improve the capability of Project Knowledge Management in Project-based Organisations. This research significantly contributes to bridge the current gap in the existing Project Management Maturity Models.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Practitioners and academics have developed numerous maturity models for many domains in order to measure competency. These initiatives have often been influenced by the Capability Maturity Model. However, an accumulative effort has not been made to generalize the phases of developing a maturity model in any domain. This paper proposes such a methodology and outlines the main phases of generic model development. The proposed methodology is illustrated with the help of examples from two advanced maturity models in the domains of Business Process Management and Knowledge Management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Asset service organisations often recognize asset management as a core competence to deliver benefits to their business. But how do organizations know whether their asset management processes are adequate? Asset management maturity models, which combine best practices and competencies, provide a useful approach to test the capacity of organisations to manage their assets. Asset management frameworks are required to meet the dynamic challenges of managing assets in contemporary society. Although existing models are subject to wide variations in their implementation and sophistication, they also display a distinct weakness in that they tend to focus primarily on the operational and technical level and neglect the levels of strategy, policy and governance as well as the social and human resources – the people elements. Moreover, asset management maturity models have to respond to the external environmental factors, including such as climate change and sustainability, stakeholders and community demand management. Drawing on five dimensions of effective asset management – spatial, temporal, organisational, statistical, and evaluation – as identified by Amadi Echendu et al. [1], this paper carries out a comprehensive comparative analysis of six existing maturity models to identify the gaps in key process areas. Results suggest incorporating these into an integrated approach to assess the maturity of asset-intensive organizations. It is contended that the adoption of an integrated asset management maturity model will enhance effective and efficient delivery of services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper introduces an ontology-based knowledge model for knowledge management. This model can facilitate knowledge discovery that provides users with insight for decision making. The users requiring the insight normally play different roles with different requirements in an organisation. To meet the requirements, insights are created by purposely aggregated transnational data. This involves a semantic data integration process. In this paper, we present a knowledge management system which is capable of representing knowledge requirements in a domain context and enabling the semantic data integration through ontology modeling. The knowledge domain context of United Bible Societies is used to illustrate the features of the knowledge management capabilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The adoption of simulation as a powerful enabling method for knowledge management is hampered by the relatively high cost of model construction and maintenance. A two-step procedure, based on a divide and conquer strategy, is proposed in this paper. First, a simulation program is partitioned based on a reinterpretation of the model-view-controller architecture. Individual parts are then connected, in terms of abstraction, to guard against possible changes that resulted from shifting user requirements. We explore the applicability of these design principles through a detailed discussion of an industry case study. The knowledge-based perspective guides the design of architecture to accommodate the need of emulation without compromising the integrity of the simulation program. The synergy between simulation and a knowledge management perspective, as shown in the case study, has the potential to achieve the objectives of rapid development of models, with low maintenance cost. This could, in turn, facilitate an extension of the use of simulation in the knowledge management domain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A stage model for knowledge management systems in policing financial crime is developed in this paper. Stages of growth models enable identification of organizational maturity and direction. Information technology to support knowledge work of police officers is improving. For example, new information systems supporting police investigations are evolving. Police investigation is an information-rich and knowledge-intensive practice. Its success depends on turning information into evidence. This paper presents an organizing framework for knowledge management systems in policing financial crime. Future case studies will empirically have to illustrate and validate the stage hypothesis developed in this paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To effectively manage the challenges being faced by construction organisations in a fast changing business environment, many organisations are attempting to integrate knowledge management (KM) into their business operations. KM activities interact with each other and form a process which receives input from its internal business environment and produces outputs that should be justified by its business performance. This paper aims to provide further understanding on the dynamic nature of the KM process. Through a combination of path analysis and system dynamic simulation, this study found that: 1) an improved business performance enables active KM activities and provide feedback and guidance for formulating learning-based policies; and 2) effective human resource recruitment policies can enlarge the pool of individual knowledge, which lead to a more conducive internal business environment, as well as a higher KM activity level. Consequently, the desired business performance level can be reached within a shorter time frame.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the evolution of knowledge management from the initial knowledge migration stage, through adaptation and creation, to the reverse knowledge migration stage in international joint ventures (IJVs). While many studies have analyzed these stages (mostly focusing on knowledge transfer), we investigated the path-dependent nature of knowledge flow in IJVs. The results from the empirical analysis based on a survey of 136 Korean parent companies of IJVs reveal that knowledge management in IJVs follows a sequential, multi-stage process, and that the knowledge transferred from parents to IJVs must first be adapted within its new environment before it reaches the creation stage. We also found that only created knowledge is transferred back to parents.