67 resultados para KPIs
Resumo:
The main objectives of this paper are to: firstly, identify key issues related to sustainable intelligent buildings (environmental, social, economic and technological factors); develop a conceptual model for the selection of the appropriate KPIs; secondly, test critically stakeholder's perceptions and values of selected KPIs intelligent buildings; and thirdly develop a new model for measuring the level of sustainability for sustainable intelligent buildings. This paper uses a consensus-based model (Sustainable Built Environment Tool- SuBETool), which is analysed using the analytical hierarchical process (AHP) for multi-criteria decision-making. The use of the multi-attribute model for priority setting in the sustainability assessment of intelligent buildings is introduced. The paper commences by reviewing the literature on sustainable intelligent buildings research and presents a pilot-study investigating the problems of complexity and subjectivity. This study is based upon a survey perceptions held by selected stakeholders and the value they attribute to selected KPIs. It is argued that the benefit of the new proposed model (SuBETool) is a ‘tool’ for ‘comparative’ rather than an absolute measurement. It has the potential to provide useful lessons from current sustainability assessment methods for strategic future of sustainable intelligent buildings in order to improve a building's performance and to deliver objective outcomes. Findings of this survey enrich the field of intelligent buildings in two ways. Firstly, it gives a detailed insight into the selection of sustainable building indicators, as well as their degree of importance. Secondly, it tesst critically stakeholder's perceptions and values of selected KPIs intelligent buildings. It is concluded that the priority levels for selected criteria is largely dependent on the integrated design team, which includes the client, architects, engineers and facilities managers.
Resumo:
Key Performance Indicators (KPIs) are the main instruments of Business Performance Management. KPIs are the measures that are translated to both the strategy and the business process. These measures are often designed for an industry sector with the assumptions about business processes in organizations. However, the assumptions can be too incomplete to guarantee the required properties of KPIs. This raises the need to validate the properties of KPIs prior to their application to performance measurement. This paper applies the method called EXecutable Requirements Engineering Management and Evolution (EXTREME) for validation of the KPI definitions. EXTREME semantically relates the goal modeling, conceptual modeling and protocol modeling techniques into one methodology. The synchronous composition built into protocol modeling enables raceability of goals in protocol models and constructive definitions of a KPI. The application of the method clarifies the meaning of KPI properties and procedures of their assessment and validation.
Resumo:
A motivação fulcral na escolha desta temática foi a escassez de investigação realizada em Portugal sobre os Indicadores Chave de Desempenho (KPI’s) do Departamento de F&B da indústria hoteleira. A presente tese tem como objetivo primordial analisar a problemática do controlo e gestão do Departamento de F&B no ramo hoteleiro, através de um modelo que procura avaliar o desempenho da performance do Departamento de F&B, através da implementação dos Indicadores de Desempenho (KPI’s), quer financeiros quer não financeiros, na cadeia hoteleira alvo do estudo. Através da pesquisa bibliográfica e sua consequente análise foi possível efetuar um enquadramento do assunto a abordar, retirando as principais diretrizes para a construção do questionário. Com este trabalho pretende-se auxiliar os profissionais da área na escolha de ferramentas que contribuíam para uma maior rentabilidade financeira do seu departamento. Também se pretende fomentar os conhecimentos dos proprietários e gestores hoteleiros e a importância de recolha e análise dos dados de modo organizado e uniformizado, garantindo assim o sucesso contínuo de eficiência e maximização da rentabilidade. Finalmente, com o trabalho apresentado, pretende-se acrescentar valor nesta área do setor hoteleiro uma vez que é reduzida a nível nacional.
Resumo:
Management systems standards (MSSs) have developed in an unprecedented manner in the last few years. These MSS cover a wide array of different disciplines, aims and activities of organisations. Also, organisations are populated with an enormous diversity of independent management systems (MSs). An integrated management system (IMS) tends to integrate some or all components of the business. Maximising their integration in one coherent and efficient MS is increasingly a strategic priority and constitutes an opportunity for businesses to be more competitive and consequently, promote its sustainable success. Those organisations that are quicker and more efficient in their integration and continuous improvement will have a competitive advantage in obtaining sustainable value in our global and competitive business world. Several scholars have proposed various theoretical approaches regarding the integration of management sub-systems, leading to the conclusion that there is no common practice for all organisations as they encompass different characteristics. One other author shows that several tangible and intangible gains for organisations, as well as to their internal and external stakeholders, are achieved with the integration of the individual standardised MSs. The purpose of this work was to conceive a model, Flexible, Integrator and Lean for IMSs, according to ISO 9001 for quality; ISO 14001 for environment and OHSAS 18001 for occupational health and safety (IMS–QES), that can be adapted and progressively assimilate other MSs, such as, SA 8000/ISO 26000 for social accountability, ISO 31000 for risk management and ISO/IEC 27001 for information security management, among others. The IMS–QES model was designed in the real environment of an industrial Portuguese small and medium enterprise, that over the years has been adopting, gradually, in whole or in part, individual MSSs. The developed model is based on a preliminary investigation conducted through a questionnaire. The strategy and research methods have taken into consideration the case study. Among the main findings of the survey we highlight: the creation of added value for the business through the elimination of several organisational wastes; the integrated management of the sustainability components; the elimination of conflicts between independent MS; dialogue with the main stakeholders and commitment to their ongoing satisfaction and increased contribution to the company’s competitiveness; and greater valorisation and motivation of employees as a result of the expansion of their skill base, actions and responsibilities, with their consequent empowerment. A set of key performance indicators (KPIs) constitute the support, in a perspective of business excellence, to the follow up of the organisation’s progress towards the vision and achievement of the defined objectives in the context of each component of the IMS model. The conceived model had many phases and the one presented in this work is the last required for the integration of quality, environment, safety and others individual standardised MSs. Globally, the investigation results, by themselves, justified and prioritised the conception of an IMS–QES model, to be implemented at the company where the investigation was conducted, but also a generic model of an IMS, which may be more flexible, integrator and lean as possible, potentiating the efficiency, added value both in the present and, fundamentally, for future.
Resumo:
O objetivo deste trabalho consiste em avaliar as capacidades das femto-células, no âmbito do planeamento e otimização de redes Universal Mobile Telecommunication System (UMTS) instaladas no interior de edifícios num ambiente empresarial. A avaliação será feita através do estudo da tecnologia das femto-células, e do planeamento efetuado num cenário real onde, através do desenvolvimento e teste de um conjunto parametrizações, será avaliado o funcionamento das femto-células assim como forma de otimizar o seu desempenho. O estudo realizado permitiu identificar um conjunto de características que as femto-células partilham com as Self-Organizing Networks (SON), como a auto-configuração, auto-otimização de parâmetros rádio, ajuste dinâmico da área de cobertura, atribuição automática de Scrambling Codes (SC) e da frequência da portadora, criação automática de relações de vizinhança, entre outras, que permitem facilitar o processo de planeamento e otimização de redes móveis UMTS. Recorrendo a um cenário empresarial real, foi efetuado um planeamento celular indoor de raiz, através do qual foi possível testar o funcionamento da algumas das principais funções das femto-células, nomeadamente a capacidade de ajuste dinâmico da área de cobertura. Foi também avaliado o funcionamento de um grupo co-localizado de femto-células, onde foi possível testar parametrizações com o objetivo de melhorar o processo de handover entre as femto-células do grupo, e entre estas e a rede macro Global System for Mobile Communications (GSM). A avaliação de cada um de cada uma das parametrizações testada, é efetuada a partir das medidas recolhidas no terreno, recorrendo à ferramenta TEMS® Investigation, assim como aos Key Performance Indicators (KPIs) que as femto-células disponibilizam. Os resultados obtidos mostram o benefício da utilização das femto-células num ambiente empresarial real, assim como os eventuais problemas e desafios que podem surguir do planeamento celular indoor recorrendo à tecnologia das femto-células, sendo apresentada a parametrização que permite obter o melhor desempenho da rede instalada.
Resumo:
In general, modern networks are analysed by taking several Key Performance Indicators (KPIs) into account, their proper balance being required in order to guarantee a desired Quality of Service (QoS), particularly, cellular wireless heterogeneous networks. A model to integrate a set of KPIs into a single one is presented, by using a Cost Function that includes these KPIs, providing for each network node a single evaluation parameter as output, and reflecting network conditions and common radio resource management strategies performance. The proposed model enables the implementation of different network management policies, by manipulating KPIs according to users' or operators' perspectives, allowing for a better QoS. Results show that different policies can in fact be established, with a different impact on the network, e.g., with median values ranging by a factor higher than two.
Resumo:
Relatório de estágio para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização em Vias de Comunicação e Transportes
Resumo:
Dissertação para a obtenção de Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia e Gestão Industrial
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
The purpose of this thesis is to study the impact of a port strike on companies that perform as logistic service providers in a supply chain (SC), here denominated 3PL (third-party logistic providers). These companies are highly dependent on ports to perform their activity, since they provide international services. Consequently, a disruption in a port can seriously impair their business. A stevedores’ strike is one of the possible disruptions that can affect ports. This study aims to analyze the negative effects caused by this disruption, and what strategies 3PLs may implement in order to keep their performance levels stable and have a quick recovery time. Within this objective, the first step will be to establish a theoretical context about the maritime port’s sector and 3PLs in a SC context, to then expand the concept of a resilient SC, and finally to develop a theoretical framework in order to better contextualize the case study. Subsequently, the impact of a port strike will be quantified by using a case study comprising three companies, covering the areas of land and sea distribution and port operations. Information from primary sources was assembled in two phases: first via e-mail and, in a second phase, through a personal interview. The information from secondary sources was obtained through television news, internet and conferences, enabling its cross-analysis. Finally, by analyzing the collected data, it will be possible to draw conclusions about the measures carried out by each company to minimize the negative effects of the strike, thus contributing to a more resilient SC. As a conclusion, a stevedores’ strike will create a snow-ball of negative effects in the SC, degrading all relevant KPIs (key performance indicators) of the 3PLs under study. No mitigation and contingency strategies available proved really effective to reduce the negative effects of a port strike disruption.
Resumo:
Unilever Jerónimo Martins is a Portuguese joint-venture leading firm in what concerns the supply chain industry of fast-moving consumer goods in Portugal. The scope of analysis of this Work Project is focusing on Unilever-JM operations and services in the Portuguese market regarding quality, efficiency and effectiveness over B2B customers. It will be analysed the possibility of development and implementation of a performance measurement system, Tableau de Bord, which will be crucial for the identification of potential opportunities of improvement with impact in the supply chain processes. This will be completed through the establishment of KPI’s to monitor and manage periodically logistics, planning and customer service processes’ performance, which are the ones where the bottlenecks are impacting more in the supply chain. In this work project the nexus causality for the problems will also be discussed and some recommendations will be prepared to tackle the inefficiencies found through the monitoring of the previous core processes, in order to improve efficacy and quality service of the supply chain.
Resumo:
Towards a holistic perspective of CRM, this project aims to diagnose and propose a strategy and market segmentation for Siemens Healthcare. The main underlying principle is to apply a full customer-centric outlook taking own business properties into consideration while preserving Siemens Healthcare’s culture and vision. Mainly focused on market segmentation, this project goes beyond established boundaries by employing an unbiased perspective of CRM while challenging current strategy, goals, processes, tools, initiatives and KPIs. In order to promote a sustainable business excellence strategy, this project aspires to streamline CRM strategic importance and driving the company one step forward.
Reinvigorating and redesigning early intervention in psychosis services for young people in Auckland
Resumo:
RESUMO: Auckland tem sido pioneira na implementação de modelos de Intervenção Precoce em Psicose. No entanto, esta organização do serviço não mudou nos últimos 19 anos. Segundo os dados obtidos da utilização do serviço, no período de 1996 -2012 foram atendidos 997 doentes, que tinham um número médio de 89 contactos (IQR: 36-184), com uma duração média de 62 horas de contactos (IQR: 24-136). Estes doentes passaram um número médio de 338 dias (IQR: 93-757) em contacto com o programa. 517 doentes (52%) não necessitaram de internamento no hospital, e os que foram internados, ficaram uma mediana de 124 dias no hospital (IQR: 40-380). Os doentes asiáticos tiveram um aumento de 50% de probabilidade de serem internados no hospital. Este relatório inclui 15 recomendações para orientar as reformas para o serviço e, nomeadamente, delinear a importância de uma visão organizacional e dos seus componentes-chave. As recomendações incluem o reforço da gestão e da liderança numa estrutura de equipe mais integrada, com recursos dedicados a melhorar a consciencialização da comunidade, a educação e deteção precoce, bem como a capacidade de receber referenciações diretas. Os Indicadores Chave de Desempenho devem ser estabelecidos, mas os Exames de Estado Mental em risco, devem ser removidos. Auckland deve manter a faixa etária alvo atual. A duração do serviço deve ser aumentada para um mínimo de três anos, com a opção de aumentá-la para cinco anos. A proporção de gestor de cuidados para os doentes deve ser preconizada em 1:15, enquanto o pessoal de apoio não-clínico deve ser aumentado. Os psiquiatras devem ter uma carga de trabalho de cerca de 80 doentes por equivalente de tempo completo. Um serviço local de prestação de cuidados deve ser desenvolvido com, nomeadamente, intervenções culturais para responder às necessidades da população multicultural de Auckland. A capacidade de investigação deve ser incorporada no Serviço de Intervenção Precoce em Psicoses. Qualquer alteração deverá envolver contacto com todas as partes interessadas, e a Administração Regional de Saúde deve comprometer-se em tempo, recursos humanos e políticos para apoiar e facilitar a mudança do sistema, investindo de forma significativa para melhor servir a comunidade Auckland.----------------------------------- ABSTRACT: Auckland has been pioneering in the adoption of Early Intervention in Psychosis models but the design of the service has not changed in 19 years. In service utilisation data from 997 patients seen from 1996 -2012, patients had a median number of 89 contacts (IQR: 36-184), with a median duration of 62 hours of contact (IQR: 24-136). Patients spent a median number of 338 days (IQR: 93-757) in contact with the program. 517 patients (52%) did not require admission to hospital, and those who did spent a median of 124 days in hospital (IQR: 40-380). Asian patients had a 50% increased chance of being admitted to hospital. This report includes 15 recommendations to guide reforms to the service, including outlining the importance of vision and key components. It recommends strengthened managerial leadership and a more integrated team structure with dedicated resources for improved community awareness, education and early detection as well as the capacity to take direct referrals. Key Performance Indicators (KPIs) should be established but At Risk Mental States should be excluded. Auckland should maintain the current target age range. The duration of service should be increased to a minimum of three years, with the option to extend this to five years. The ratio of care co-ordinator to patients should be capped at 1:15 whilst non-clinical supporting staff should be increased. Psychiatrists should have a caseload of about 80 per FTE. A local Service Delivery framework should be developed, as should cultural interventions to meet the needs of the multicultural population of Auckland. Research capacity should be incorporated into the fabric of Early Intervention in Psychosis Services. Any changes should involve consultation with all stakeholders, and the DHB should commit to investing time, human and political resources to support and facilitate meaningful system change to best serve the Auckland community.