995 resultados para Interference operation point
Resumo:
The pumping processes requiring wide range of flow are often equipped with parallelconnected centrifugal pumps. In parallel pumping systems, the use of variable speed control allows that the required output for the process can be delivered with a varying number of operated pump units and selected rotational speed references. However, the optimization of the parallel-connected rotational speed controlled pump units often requires adaptive modelling of both parallel pump characteristics and the surrounding system in varying operation conditions. The available information required for the system modelling in typical parallel pumping applications such as waste water treatment and various cooling and water delivery pumping tasks can be limited, and the lack of real-time operation point monitoring often sets limits for accurate energy efficiency optimization. Hence, alternatives for easily implementable control strategies which can be adopted with minimum system data are necessary. This doctoral thesis concentrates on the methods that allow the energy efficient use of variable speed controlled parallel pumps in system scenarios in which the parallel pump units consist of a centrifugal pump, an electric motor, and a frequency converter. Firstly, the suitable operation conditions for variable speed controlled parallel pumps are studied. Secondly, methods for determining the output of each parallel pump unit using characteristic curve-based operation point estimation with frequency converter are discussed. Thirdly, the implementation of the control strategy based on real-time pump operation point estimation and sub-optimization of each parallel pump unit is studied. The findings of the thesis support the idea that the energy efficiency of the pumping can be increased without the installation of new, more efficient components in the systems by simply adopting suitable control strategies. An easily implementable and adaptive control strategy for variable speed controlled parallel pumping systems can be created by utilizing the pump operation point estimation available in modern frequency converters. Hence, additional real-time flow metering, start-up measurements, and detailed system model are unnecessary, and the pumping task can be fulfilled by determining a speed reference for each parallel-pump unit which suggests the energy efficient operation of the pumping system.
Resumo:
Pysyäkseen kilpailukykyisenä vapautuneilla sähkömarkkinoilla on voimalaitoksen energiantuotantokustannusten oltava mahdollisimman matalia, tinkimättä kuitenkaan korkeasta käytettävyydestä. Polttoaineen energiasisällön mahdollisimman hyvä hyödyntäminen on ratkaisevan tärkeää voimalaitoksen kannattavuudelle. Polttoainekustannusten osuus on konvektiivisilla laitoksilla yleensä yli puolet koko elinjakson kustannuksista. Kun vielä päästörajat tiukkenevat koko ajan, korostuu polttoaineen korkea hyötykäyttö entisestään. Korkea energiantuotannon luotettavuus ja käytettävyys ovat myös elintärkeitä pyrittäessä kustannusten minimointiin. Tässä työssä on käyty läpi voimalaitoksen kustannuksiin vaikuttavia käsitteitä, kuten hyötysuhdetta, käytettävyyttä, polttoaineen hintoja, ylös- ja alasajoja ja tärkeimpiä häviöitä. Ajostrategiassa ja poikkeamien hallinnassa pyritään hyvään hyötysuhteeseen ja alhaisiin päästöihin joka käyttötilanteessa. Lisäksi on tarkasteltu tiettyjen suureiden, eli höyryn lämpötilan ja paineen, savukaasun hapen pitoisuuden, savukaasun loppulämpötilan, sekä lauhduttimen paineen poikkeamien vaikutusta ohjearvostaan energiantuotantokustannuksiin. Happi / hiilimonoksidi optimoinnissa on otettu huomioon myös pohjatuhkan palamattomat.
Resumo:
The aim of this thesis is to investigate the thermal loading of medium voltage three-level NPC inverter’s semiconductor IGCT switches in different operation points. The objective is to reach both a fairly accurate off-line simulation program and also so simple a simulation model that its implementation into an embedded system could be reasonable in practice and a real time use should become feasible. Active loading limitation of the inverter can be realized with a thermal model which is practical in a real time use. Determining of the component heating has been divided into two parts; defining of component losses and establishing the structure of a thermal network. Basics of both parts are clarified. The simulation environment is Matlab-Simulink. Two different models are constructed – a more accurate one and a simplified one. Potential simplifications are clarified with the help of the first one. Simplifications are included in the latter model and the functionalities of both models are compared. When increasing the calculation time step a decreased number of considered components and time constants of the thermal network can be used in the simplified model. Heating of a switching component is dependent on its topological position and inverter’s operation point. The output frequency of the converter defines mainly which one of the switching components is – because of its losses and heating – the performance limiting component of the converter. Comparison of results given by different thermal models demonstrates that with larger time steps, describing of fast occurring switching losses becomes difficult. Generally articles and papers dealing with this subject are written for two-level inverters. Also inverters which apply direct torque control (DTC) are investigated rarely from the heating point of view. Hence, this thesis completes the former material.
Resumo:
This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding the operation point of a particular area without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. The methodology is based on the decomposition of the first-order optimality conditions of the AC power flow, which is formulated as a nonlinear programming problem. To allow better visualization of the concept of independent operation of each TSO, an artificial neural network have been used for computing border information of the interconnected TSOs. A multi-area Power Flow tool can be seen as a basic building block able to address a large number of problems under a multi-TSO competitive market philosophy. The IEEE RTS-96 power system is used in order to show the operation and effectiveness of the decentralized AC Power Flow. ©2010 IEEE.
Resumo:
This paper proposes an approach of optimal sensitivity applied in the tertiary loop of the automatic generation control. The approach is based on the theorem of non-linear perturbation. From an optimal operation point obtained by an optimal power flow a new optimal operation point is directly determined after a perturbation, i.e., without the necessity of an iterative process. This new optimal operation point satisfies the constraints of the problem for small perturbation in the loads. The participation factors and the voltage set point of the automatic voltage regulators (AVR) of the generators are determined by the technique of optimal sensitivity, considering the effects of the active power losses minimization and the network constraints. The participation factors and voltage set point of the generators are supplied directly to a computational program of dynamic simulation of the automatic generation control, named by power sensitivity mode. Test results are presented to show the good performance of this approach. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
This paper presents a methodology to address reactive power compensation using Evolutionary Particle Swarm Optimization (EPSO) technique programmed in the MATLAB environment. The main objective is to find the best operation point minimizing power losses with reactive power compensation, subjected to all operational constraints, namely full AC power flow equations, active and reactive power generation constraints. The methodology has been tested with the IEEE 14 bus test system demonstrating the ability and effectiveness of the proposed approach to handle the reactive power compensation problem.
Resumo:
This paper presents a programable perturbation and observation control implementation for a wind generation system and its power electronic converter. The objective of the method in this particular application is to adjust the power delivered to charge a battery to its maximum and allowable value, function of the real values of several parameters and their continuous variation, the most important the wind velocity and the turbine efficiency. Also, to improve the power throughput and to use the turbine and generator marginal zones of operation, an unusual power converter is used, allowing a wide range for the input voltage values. The implemented control is continuously measuring the actual power and looks for a new and powerful operation point. © 2014 IEEE.
Resumo:
This paper presents a programable perturbation and observation control implementation for a wind generation system and its power electronic converter. The objective of the method in this particular application is to adjust the power delivered to charge a battery to its maximum and allowable value, function of the real values of several parameters and their continuous variation, the most important the wind velocity and the turbine efficiency. Also, to improve the power throughput and to use the turbine and generator marginal zones of operation, an unusual power converter is used, allowing a wide range for the input voltage values. The implemented control is continuously measuring the actual power and looks for a new and powerful operation point. © 2014 IEEE.
Resumo:
Centrifugal compressors are widely used for example in process industry, oil and gas industry, in small gas turbines and turbochargers. In order to achieve lower consumption of energy and operation costs the efficiency of the compressor needs to be improve. In the present work different pinches and low solidity vaned diffusers were utilized in order to improve the efficiency of a medium size centrifugal compressor. In this study, pinch means the decrement of the diffuser flow passage height. First different geometries were analyzed using computational fluid dynamics. The flow solver Finflo was used to solve the flow field. Finflo is a Navier-Stokes solver. The solver is capable to solve compressible, incompressible, steady and unsteady flow fields. Chien's k-e turbulence model was used. One of the numerically investigated pinched diffuser and one low solidity vaned diffuser were studied experimentally. The overall performance of the compressor and the static pressure distribution before and after the diffuser were measured. The flow entering and leaving the diffuser was measured using a three-hole Cobra-probe and Kiel-probes. The pinch and the low solidity vaned diffuser increased the efficiency of the compressor. Highest isentropic efficiency increment obtained was 3\% of the design isentropic efficiency of the original geometry. It was noticed in the numerical results that the pinch made to the hub and the shroud wall was most beneficial to the operation of the compressor. Also the pinch made to the hub was better than the pinchmade to the shroud. The pinch did not affect the operation range of the compressor, but the low solidity vaned diffuser slightly decreased the operation range.The unsteady phenomena in the vaneless diffuser were studied experimentally andnumerically. The unsteady static pressure was measured at the diffuser inlet and outlet, and time-accurate numerical simulation was conducted. The unsteady static pressure showed that most of the pressure variations lay at the passing frequency of every second blade. The pressure variations did not vanish in the diffuser and were visible at the diffuser outlet. However, the amplitude of the pressure variations decreased in the diffuser. The time-accurate calculations showed quite a good agreement with the measured data. Agreement was very good at the design operation point, even though the computational grid was not dense enough inthe volute and in the exit cone. The time-accurate calculation over-predicted the amplitude of the pressure variations at high flow.
Resumo:
Pumppukäytöt vastaavat noin neljänneksestä Euroopan sähkömoottoreissa kulutettavasta sähkötehosta. Energian kallistumisen vuoksi energian säästämisestä ja energiatehokkuudesta on tullut yhä tärkeämpää. Taajuusmuuttajat ovat tuoneet yksinkertaisen säätötavan, jolla suurimmassa osassa pumppukäyttöjä voidaan saada huomattavia energiasäästöjä. Koko energiansäästöpotentiaalin hyödyntämiseksi täytyy kuitenkin pumppujen toimintaa tarkkailla. Tarkkailu voidaan toteuttaa käyttämällä taajuusmuuttajan sisäisiä mittauksia pumpun toimintapisteen määrittämiseen. Tässä työssä muodostetaan kaksi simulointimallia, joilla voidaan tutkia pumppukäytön toimintapistettä ja energiatehokkuutta. Pumpattavan nesteen ominaisuuksien vaikutusta malleihin tutkitaan ja tapoja korjata virhettä selvitetään. Mallien tuottamia estimaatteja verrataan laboratorio ja pilot-kohteiden mittauksiin. Pilot-kohteiden avulla tutkitaan voidaanko simulointimalleja käyttää teollisuuden energiansäästöpotentiaalia omaavien pumppukäyttöjen havaitsemiseen.
Resumo:
Synchronous motors are used mainly in large drives, for example in ship propulsion systems and in steel factories' rolling mills because of their high efficiency, high overload capacity and good performance in the field weakening range. This, however, requires an extremely good torque control system. A fast torque response and a torque accuracy are basic requirements for such a drive. For large power, high dynamic performance drives the commonly known principle of field oriented vector control has been used solely hitherto, but nowadays it is not the only way to implement such a drive. A new control method Direct Torque Control (DTC) has also emerged. The performance of such a high quality torque control as DTC in dynamically demanding industrial applications is mainly based on the accurate estimate of the various flux linkages' space vectors. Nowadays industrial motor control systems are real time applications with restricted calculation capacity. At the same time the control system requires a simple, fast calculable and reasonably accurate motor model. In this work a method to handle these problems in a Direct Torque Controlled (DTC) salient pole synchronous motor drive is proposed. A motor model which combines the induction law based "voltage model" and motor inductance parameters based "current model" is presented. The voltage model operates as a main model and is calculated at a very fast sampling rate (for example 40 kHz). The stator flux linkage calculated via integration from the stator voltages is corrected using the stator flux linkage computed from the current model. The current model acts as a supervisor that prevents only the motor stator flux linkage from drifting erroneous during longer time intervals. At very low speeds the role of the current model is emphasised but, nevertheless, the voltage model always stays the main model. At higher speeds the function of the current model correction is to act as a stabiliser of the control system. The current model contains a set of inductance parameters which must be known. The validation of the current model in steady state is not self evident. It depends on the accuracy of the saturated value of the inductances. Parameter measurement of the motor model where the supply inverter is used as a measurement signal generator is presented. This so called identification run can be performed prior to delivery or during drive commissioning. A derivation method for the inductance models used for the representation of the saturation effects is proposed. The performance of the electrically excited synchronous motor supplied with the DTC inverter is proven with experimental results. It is shown that it is possible to obtain a good static accuracy of the DTC's torque controller for an electrically excited synchronous motor. The dynamic response is fast and a new operation point is achieved without oscillation. The operation is stable throughout the speed range. The modelling of the magnetising inductance saturation is essential and cross saturation has to be considered as well. The effect of cross saturation is very significant. A DTC inverter can be used as a measuring equipment and the parameters needed for the motor model can be defined by the inverter itself. The main advantage is that the parameters defined are measured in similar magnetic operation conditions and no disagreement between the parameters will exist. The inductance models generated are adequate to meet the requirements of dynamically demanding drives.
Resumo:
Pumppukäytöt vastaavat noin neljännestä Euroopan alueen sähkömoottoreissa kuluvasta energiasta. Energian hinnan nousun vuoksi energian säästäminen ja energiatehokkuus ovat nousseet tärkeään asemaan paljon energiaa kuluttavassa teollisuudessa. Pumppukäyttöjen hyötysuhteen parantaminen on noussut olennaiseen osaan paperi- ja kartonkiteollisuuden energiatehokkuustarkasteluissa. Tässä työssä tarkastellaan kartonkikoneen pumppukäyttöjen toiminnan energiatehokkuutta moottorin virtamittausten perusteella. Analyysi perustuu moottorin akselitehon määrittämiseen ja sen perusteella tehtävään pumpun toimintapisteen laskentaan. Työssä esitellään käytetyt estimointimenetelmät ja niillä saadut tulokset kartonkikoneen pumppukäytöille. Lisäksi työssä arvioidaan kolmen yksittäisen pumppukäytön energiankulutuksen säästöpotentiaalia. Työssä käytettyä menetelmää voidaan käyttää sekä vakio- että vaihtonopeuspumppukäyttöjen toiminnan ja hyötysuhteen analysointiin.
Resumo:
Työssä tutkitaan raskaiden työkoneiden hybridisointimitoitusta simuloimalla. Työssä esitetään simulation-in-the-loop-simulointiin perustuva järjestelmä, jolla esimerkkitapauksena oleva kaivoslastauskone työympäristöineen voidaan mallintaa mekaaniselta osaltaan monikappaledynamiikkaan perustuvalla ohjelmistolla ja hybridijärjestelmän osalta Simulinkissa. Yhdistetty simulointi mahdollistaa hybridityökoneen virtuaalimallin ohjaamisen käyttäjän toimesta reaaliajassa. Simuloinnista saadaan tuloksena mm. työsykli, jota voidaan käyttää hybridisointimitoitukseen. Hybridisointi toteutetaan kahdella erilaisella kokoonpanolla, joista analysoidaan suorituskykyä sekä polttoaineen kulutusta. Tuloksia verrataan pelkästään dieselmoottoria voimanlähteenä käyttävään lastauskoneeseen. Työssä tehty tutkimus osoittaa, että (sarja-) hybridisoinnilla voidaan saavuttaa merkittäviä etuja raskaiden työkoneiden polttoainetehokkuudessa. Dieselmoottoria voidaan ajaa sellaisessa staattisessa toimintapisteessä, jonka hyötysuhde on korkea riippumatta työkoneen kuormituksesta. Saavutettu hyöty on toteutetussa tutkimuksessa parhaimmillaan jopa 56 % vähennys polttoaineenkulutuksessa. Lisäksi tarvittava dieselin nimellisteho pienenee huomattavasti. Tutkimuksen osana esitellään myös Hardware-in-the-Loop -laitteisto, jonka avulla voidaan liittää oikea sähkömoottori ja taajuudenmuuttaja osaksi virtuaalisesti simuloitua työkonetta.
Resumo:
Traction motor design significantly differs from industrial machine design. The starting point is the load cycle instead of the steady-state rated operation point. The speed of the motor varies from zero to very high speeds. At low speeds, heavy overloading is used for starting, and the field-weakening region also plays an important role. Finding a suitable fieldweakening point is one of the important design targets. At the lowest speeds, a high torque output is desired, and all current reserves of the supplying converter unit are used to achieve the torque. In this paper, a 110-kW 2.5-p.u. starting torque and a maximum 2.5-p.u. speed permanent-magnet traction motor will be studied. The field-weakening point is altered by varying the number of winding turns of machine. One design is selected for prototyping. Theoretical results are verified by measurements.
Resumo:
The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system