867 resultados para Infrastructure Procurement


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public private partnerships (PPP) have been widely used as a method for public infrastructure project delivery not only locally and internationally, however the adoption of PPPs in social infrastructure procurement has still been very limited. The objective of this paper is to investigate the potential of implementation of current PPP framework in social affordable housing projects in South East Queensland. Data were collected from 22 interviewees with rich experiences in the industry. The findings of this study show that affordable housing investment have been considered by the industry practitioners as a risky business in comparison to other private rental housing investment. The main determents of the adoption of PPPs in social infrastructure project are the tenant-related factors, such as the inability of paying rent and the inability of caring the property. The study also suggests the importance of seeking strategic partnership with community-based organisation that has experiences in managing similar tenants’ profiles. Current PPP guideline is also viewed as inappropriate for the affordable housing projects, but the principle of VFM framework and risk allocation in PPPs still be applied to the affordable housing projects. This study helps to understand the viability of PPP in social housing procurement projects, and point out the importance of developing guideline for multi-stakeholder partnership and the expansion of the current VFM and PPPs guidelines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

According to Tan et al. (2011), the establishment of a clear sustainability policy in the construction industry is paramount, if only as a statement of the commitment of the top management to protecting the environment and enhancing social responsibility. The resulting policies should then translate into proactive strategies and action plans that improve the sustainability performance of contractors and provide a competitive advantage by integrating “long-run profitability” with sustainable development efforts. The strategies should also take into account climatic protection issues through greenhouse gas emissions (GHGe) monitoring and reduction initiatives (Stocker & Luptacik, 2009)...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Typically only a limited number of consortiums are able to competitively bid for Public Private Partnership (PPP) projects. Consequently, this may lead to oligopoly pricing constraints and ineffective competition, thus engendering ex ante market failure. In addressing this issue, this paper aims to determine the optimal number of bidders required to ensure a healthy level of competition is available to procure major infrastructure projects. The theories of Structure-Conduct-Performance (SCP) paradigm; Game Theory and Auction Theory and Transaction Cost Economics are reviewed and discussed and used to produce an optimal level of competition for major infrastructure procurement, that prevents market failure ex ante (lack of competition) and market failure ex post (due to asymmetric lock-in).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and delivering Value for Money (VfM). As part of the background to this challenge, a critique is given of current practice in the selection of the approach to procure major public sector infrastructure in Australia and which is akin to the Multi-Attribute Utility Approach (MAUA). To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision-making model is presented. The model addresses the make-or-buy decision (risk allocation); the bundling decision (property rights incentives), as well as the exchange relationship decision (relational to arms-length exchange) in its novel approach to articulating a procurement strategy designed to yield superior VfM across the whole life of the asset. The aim of this paper is report on the development of this decisionmaking model in terms of the procedural tasks to be followed and the method being used to test the model. The planned approach to testing the model uses a sample of 87 Australian major infrastructure projects in the sum of AUD32 billion and deploys a key proxy for VfM comprising expressions of interest, as an indicator of competition.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In 2009 the Australian Federal and State governments are expected to have spent some AU$30 billion procuring infrastructure projects. For governments with finite resources but many competing projects, formal capital rationing is achieved through use of Business Cases. These Business cases articulate the merits of investing in particular projects along with the estimated costs and risks of each project. Despite the sheer size and impact of infrastructure projects, there is very little research in Australia, or internationally, on the performance of these projects against Business Case assumptions when the decision to invest is made. If such assumptions (particularly cost assumptions) are not met, then there is serious potential for the misallocation of Australia’s finite financial resources. This research addresses this important gap in the literature by using combined quantitative and qualitative research methods, to examine the actual performance of 14 major Australian government infrastructure projects. The research findings are controversial as they challenge widely held perceptions of the effectiveness of certain infrastructure delivery practices. Despite this controversy, the research has had a significant impact on the field and has been described as ‘outstanding’ and ‘definitive’ (Alliancing Association of Australasia), "one of the first of its kind" (Infrastructure Partnerships of Australia) and "making a critical difference to infrastructure procurement" (Victorian Department of Treasury). The implications for practice of the research have been profound and included the withdrawal by Government of various infrastructure procurement guidelines, the formulation of new infrastructure policies by several state governments and the preparation of new infrastructure guidelines that substantially reflect the research findings. Building on the practical research, a more rigorous academic investigation focussed on the comparative cost uplift of various project delivery strategies was submitted to Australia’s premier academic management conference, the Australian and New Zealand Academy of Management (ANZAM) Annual Conference. This paper has been accepted for the 2010 ANZAM National Conference following a process of double blind peer review with reviewers rating the paper’s overall contribution as "Excellent" and "Good".

Relevância:

70.00% 70.00%

Publicador:

Resumo:

To ensure infrastructure assets are procured and maintained by government on behalf of citizens, appropriate policy and institutional architecture is needed, particularly if a fundamental shift to more sustainable infrastructure is the goal. The shift in recent years from competitive and resource-intensive procurement to more collaborative and sustainable approaches to infrastructure governance is considered a major transition in infrastructure procurement systems. In order to better understand this transition in infrastructure procurement arrangements, the concept of emergence from Complex Adaptive Systems (CAS) theory is offered as a key construct. Emergence holds that micro interactions can result in emergent macro order. Applying the concept of emergence to infrastructure procurement, this research examines how interaction of agents in individual projects can result in different industry structural characteristics. The paper concludes that CAS theory, and particularly the concept of ‘emergence’, provides a useful construct to understand infrastructure procurement dynamics and progress towards sustainability.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Public Private Partnership (PPP) is a well established methodology for procuring public works projects. By incorporating the private sector’s expertise, efficiency, innovation, business sense, risk sharing, financing etc. into public works projects, the quality of public services and facilities can be uplifted. Like many jurisdictions, Hong Kong is also keen to take aboard this methodology which is so familiar but yet so distant. Although they have been one of the first jurisdictions to utilise the private sector in public works projects, their comfortable financial reserves has meant that there has been no urge to push the movement until recently. PPP has become increasingly popular amongst governments. The Hong Kong Special Administrative Region (HKSAR) government is no exception. Some of the more active works departments have commissioned studies to investigate the best ways to deliver these projects, others have even trialed the method themselves. The efficiency Unit of the HKSAR government has also become an active arm in conducting research in this area. Although so, the information that is currently available is still very broad. Building from their works there is a need to develop a best practice framework for implementing PPP projects in Hong Kong by incorporating international experiences. To develop a best practice framework will require thorough investigation into the benefits, difficulties and critical success factor of PPP. PPP should also be compared with other procurement methods. In order to do so it is important to clearly understand the local situation by an analysis of projects conducted to date. Lessons learnt can further be derived from other countries and incorporated to those derived locally. Finally the best conditions in terms of project nature, complexity, types, and scales for adopting PPP should be derived. The aim and objectives of this study were achieved via a comprehensive literature review, in-depth case analyses, interview survey with experts from both Hong Kong and overseas, and finally a large scale data collection was conducted via a questionnaire survey with PPP practitioners. These findings were further triangulated before they were used as the basis to form the best practice framework presented in this thesis. The framework was then further validated by PPP experts to ensure it is comprehensive, objective, reliable and practical. This study has presented a methodology that can be adopted for future studies. It has also updated our knowledge on the development trends of PPP as well as opened up the experiences of other jurisdictions. The findings have shown that the local industry is familiar with “what” should be done in PPP projects but they are unsure of “how” these goals can be achieved. This framework has allowed this further knowledge to be delivered to PPP practitioners. As a result, the development of this framework can help to resolve the current economic crisis by encouraging more developments and business opportunities for the private sector. In addition, the correct projects can be delivered by PPP, the advantages of PPP can be maximised, and the general public can benefit from the private sector’s participation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

During recent years, a wide spectrum of research has questioned whether public services/infrastructure procurement through private finance, as exemplified by the UK Private Finance Initiative (PFI), meets minimum standards of democratic accountability. While broadly agreeing with some of these arguments, this paper suggests that this debate is flawed on two grounds. Firstly, PFI is not about effective procurement, or even about a pragmatic choice of procurement mechanisms which can potentially compromise public involvement and input; rather it is about a process where the state creates new profit opportunities at a time when the international financial system is increasingly lacking in safe investment opportunities. Secondly, because of its primary function as investment opportunity, PFI, by its very nature, prioritises the risk-return criteria of private finance over the needs of the public sector client and its stakeholders. Using two case studies of recent PFI projects, the paper illustrates some of the mechanisms through which finance capital exercises control over the PFI procurement process. The paper concludes that recent proposals aimed at “reforming” or “democratising” PFI fail to recognise the objective constraints which this type of state-finance capital nexus imposes on political process.