964 resultados para Information protection and management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The 10th annual Jisc, GuildHE and Universities UK information legislation and management survey shows a rise in the number of Freedom of Information (FOI) requests for the tenth consecutive year. In contrast Environmental Information Regulations (EIR) requests appear to have levelled off to a fairly consistent rate, while Data Protection Act (DPA) requests have declined back to levels last seen in 2008. The average monthly number of FOI requests received by UK universities has risen by 19% since 2013 and by almost seven times over the last decade since our survey began. The average across the 46 participating institutions was 219 FOI requests with the highest of 454 reported by one participant.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The 10th annual Jisc, GuildHE and Universities UK information legislation and management survey shows a rise in the number of Freedom of Information (FOI) requests for the tenth consecutive year. In contrast Environmental Information Regulations (EIR) requests appear to have levelled off to a fairly consistent rate, while Data Protection Act (DPA) requests have declined back to levels last seen in 2008. The average monthly number of FOI requests received by UK universities has risen by 19% since 2013 and by almost seven times over the last decade since our survey began. The average across the 47 participating institutions was 218 FOI requests with the highest of 454 reported by one participant.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study explores the relationship between the qualities of an information system and management accounting adaptability (MAA) and effectiveness in firms. Design/methodology/approach I develop and empirically test a model where the qualities of the information system and management accounting effectiveness are mediated by MAA. Findings Information system flexibility (ISF) and shared knowledge had a significant and positive correlation with MAA, which in turn had a positive and significant correlation with management accounting effectiveness. There was also a moderation effect of ISF on the correlation betweeen information system integration and MAA. Research implications Information system integration may not lead to management accounting stability, but the lack of flexibility of a system and a lack of cooperation between the stakeholders might lead to its stagnation. Practical implications Organizations are advised to implement solutions that are relatively flexible and modular, as well as encourage cooperation between stakeholders to fully leverage and improve the existing and future systems. Originality/value The study extends the discourse on the interaction between management accounting and information systems by exploring the role of a number of factors that drive MAA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rapport de stage présenté à la Faculté des arts et sciences en vue de l'obtention du grade de Maîtrise ès sciences (M. Sc.) en criminologie (option Analyse Criminologique).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Continuous Plankton Recorder (CPR) survey was conceived from the outset as a programme of applied research designed to assist the fishing industry. Its survival and continuing vigour after 70 years is a testament to its utility, which has been achieved in spite of great changes in our understanding of the marine environment and in our concerns over how to manage it. The CPR has been superseded in several respects by other technologies, such as acoustics and remote sensing, but it continues to provide unrivalled seasonal and geographic information about a wide range of zooplankton and phytoplankton taxa. The value of this coverage increases with time and provides the basis for placing recent observations into the context of long-term, large-scale variability and thus suggesting what the causes are likely to be. Information from the CPR is used extensively in judging environmental impacts and producing quality status reports (QSR); it has shown the distributions of fish stocks, which had not previously been exploited; it has pointed to the extent of ungrazed phytoplankton production in the North Atlantic, which was a vital element in establishing the importance of carbon sequestration by phytoplankton. The CPR continues to be the principal source of large-scale, long-term information about the plankton ecosystem of the North Atlantic. It has recently provided extensive information about the biodiversity of the plankton and about the distribution of introduced species. It serves as a valuable example for the design of future monitoring of the marine environment and it has been essential to the design and implementation of most North Atlantic plankton research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Indigenous patients with acute coronary syndromes represent a high-risk group. There are however few contemporary datasets addressing differences in the presentation and management of Indigenous and non-Indigenous patients with chest pain. METHODS: The Heart Protection Project, is a multicentre retrospective audit of consecutive medical records from patients presenting with chest pain. Patients were identified as Indigenous or non-Indigenous, and time to presentation and cardiac investigations as well as rates of cardiac investigations and procedures were compared between the two groups. RESULTS: Of the 2380 patients included, 199 (8.4%) identified as Indigenous, and 2174 (91.6%) as non-Indigenous. Indigenous patients were younger, had higher rates hyperlipidaemia, diabetes, smoking, known coronary artery disease and a lower rate of prior PCI; and were significantly less likely to have private health insurance, be admitted to an interventional facility or to have a cardiologist as primary physician. Following adjustment for difference in baseline characteristics, Indigenous patients had comparable rates of cardiac investigations and delay times to presentation and investigations. CONCLUSIONS: Although the Indigenous population was identified as a high-risk group, in this analysis of selected Australian hospitals there were no significant differences in treatment or management of Indigenous patients in comparison to non-Indigenous.