924 resultados para IMMEDIATE LOADING
Resumo:
Immediate loading of dental implants shortens the treatment time and makes it possible to give the patient an esthetic appearance throughout the treatment period. Placement of dental implants requires precise planning that accounts for anatomic limitations and restorative goals. Diagnosis can be made with the assistance of computerized tomographic scanning, but transfer of planning to the surgical field is limited. Recently, novel CAD/CAM techniques such as stereolithographic rapid prototyping have been developed to build surgical guides in an attempt to improve precision of implant placement. The aim of this case report was to show a modified surgical template used throughout implant placement as an alternative to a conventional surgical guide.
Resumo:
The aim of this study was to present the factors that influence planning for immediate loading of implants through a literature review for treatment success. Research was conducted in the PubMed database including the key words immediate implant loading, implant-supported prostheses, and implant planning for studies published from 2000 to 2011. Forty-eight articles were used in this review to describe the indications and counterindications, presurgical planning, and technologies available for planning of this treatment alternative.
Resumo:
The treatment with implants aims to obtain a direct interface between bone and implant. The implant is kept load-free during 4 to 6 months in the 2-stage procedure, which is considered a requisite for osseointegration. However, this period is based on empirical principles and uncomfortable for patient. So, the immediate loading protocol was Suggested to submit implants to occlusal function after placement. This protocol has been applied for several conditions of edentulism. The aim of this study was to evaluate the treatment alternatives for immediate loading of complete and partial edentulous patients. In general, the studies have demonstrated high previsibility for rehabilitation of complete edentulous arches with full-arch, implant-supported prosthesis. The rehabilitation with immediate loading for maxillary overdenture is questionable because there is no longitudinal study in literature. The studies with partial edentulous arches have demonstrated high success rates for implants placed in the mandibular and maxillary anterior region. Additional care is recommended for posterior region mainly in the maxillary arch, and further studies are suggested to corroborate this treatment.
Resumo:
Two-stage procedure for dental implants presents corroborated clinical success over 40 years. The evolution of surgical techniques, development of diagnostic methods, knowledge about tissue biology, and quality of implants regarding design and surface supported studies with I surgical stage followed by immediate prosthesis placement. However, several factors influence the treatment success with immediate loading. SO, this Study aimed to evaluate some factors regarding the success and characteristics of implants and patients.
Resumo:
Purpose: The aim of this study was to evaluate by means of digital radiography the behavior of the alveolar bone crest in external hexagon implants following the use of 2 different types of abutments, one for conventional cemented prosthesis and one for modified cemented prosthesis.Methods: Ten external hexagon implants (platform 4.1) were placed in 5 patients. Initial instrumentation was carried out to obtain primary stability of the temporary prostheses under immediate loading. Each patient received both abutments for conventional and modified cemented prosthesis. Standardized digital periapical radiographies were performed at times T0 (immediately after implant placement) and T1 (4 months after implant placement). A straight line was initially established from the implant platform to the distal and mesial periimplantar marginal bone tissue (immediately in contact with the implant) and measured by digital radiography, using Sidexis version 2.3 (Sirona Dental Systems GmbH, Bensheim, Germany) software. The data were submitted to paired-samples t-test analysis.Results: There was no significant difference between the conventional and modified cemented prosthesis. In both cases, t-test results were within the null hypothesis level.Conclusion: The abutment for the modified cemented prosthesis resulted in no significant radiographic difference of alveolar bone crest height, when compared with the conventional cemented prostheses.
Resumo:
The transfer of an intraoral implant position to the cast for an immediate loading implant is an important step and may be difficult to achieve with commonly used transfer and impression methods. Thus, the purpose of this report is to describe a technique for the use of a surgical template to transfer the implant position for fabrication of a provisional restoration. This technique simplifies the procedure, eliminates the need for taking an impression, avoids surgical site contamination, and maintains an adequate emergence profile during fabrication of the definitive restoration. An indexing technique for transferring the position of the implant from the treated surface after extraction is described.
Resumo:
We report the simultaneous rehabilitation of an edentulous patient with a hybrid (zygomatic and conventional implants) all-on-four implant-supported prosthesis for the maxilla and a standard (conventional implants) all-on-four implant-supported prosthesis for the mandible. The transfer impression was made with a multifunctional guide and the upper and lower prostheses were placed 24 h postoperatively. Clinical and radiographic examinations showed no infection or bony resorption 2 years later. Simultaneous maxillary and mandibular rehabilitation with all-on-four immediate loading is a viable, fast and effective option for edentulous patients. (C) 2009 Published by Elsevier Ltd on behalf of The British Association of Oral and Maxillofacial Surgeons.
Resumo:
Introduction: The goal of implant treatment is the formation of a direct bone-implant interface contact. Purpose: This study aimed to evaluate the possibilities of immediate loading treatment for edentulous patients rehabilitated with mandibular and maxillary overdentures. Material and methods: A literature review using the PubMed and BIREME databases between the periods of 1977 and 2011 was performed. Results: From an initial yield of 218 titles, 78 articles were selected for text analysis, finally resulting in 23 studies (16 prospective, 6 prospective randomized, and 1 prospective multicenter) that met the inclusion criteria. Conclusion: The immediate loading protocol through which the implants are subjected to occlusal function immediately after their placement was introduced to overcome this limitation. © 2013 Springer-Verlag Berlin Heidelberg.
Resumo:
Moderate and controlled loading environments support or enhance osteogenesis, and, consequently, a high degree of bone-to-implant contact can be acquired. This is because when osteoprogenitor cells are exposed to limited physical deformation, their differentiation into osteoblasts is enhanced. Then, some range of microstrain is considered advantageous for bone ingrowth and osseointegration. The primary stability has been considered one of the main clinical means of controlling micromotion between the implant and the forming interfacial tissue, which helps to establish the proper mechanical environment for osteogenesis. Based on the biological aspects of immediate loading (IL), the objective of this study is to present a clinical case of maxillary arch rehabilitation using immediate loading with implant-supported fixed restoration after bone graft. Ten dental implants were placed in the maxilla 6 months after the autogenous bone graft, removed from the mandible (bilateral oblique line and chin), followed by the installation of an immediate-load fixed cross-arch implant-supported restoration because primary stability was reached for 8 implants. In addition, instructions about masticatory function and how it is related to interfacial micromotion were addressed and emphasized to the patient. The reasons for the IL were further avoidance of an interim healing phase, a potential reduction in the number of clinical interventions for the patient, and aesthetic reasons. After monitoring the rehabilitation for 8 years, the authors can conclude that maxillary IL can be performed followed by a well-established treatment planning based on computed tomography, providing immediate esthetics and function to the patient even when autogenous bone graft was previously performed in the maxilla.
Resumo:
Objective: To evaluate the influence of different insertion torques on healing of implants loaded immediately or left unloaded.Material and methods: In six Labrador dogs, all mandibular premolars and molars were extracted. After 4 months of healing, flaps were elevated, and two implant sites were prepared at each side of the mandible. The distal sites were prepared conventionally while the mesial sites were underprepared by 0.3 mm. As a consequence, different final insertion torques of about 30 Ncm at the distal and >70 Ncm at the mesial sites were recorded. Healing abutments were applied to the left and transmucosal abutments to the right side. Flaps were sutured, crown preparation of the upper right second and third premolars was performed, and impressions were taken. Within 24 h, crowns were cemented both to implants and teeth in the right side of the mouth. After 4 months, the animals were sacrificed and ground sections obtained for histological evaluation.Results: A higher buccal bony crestal resorption and a more apical position of the coronal level of osseointegration were found at the loaded compared with the unloaded sites. MBIC% and percentages of peri-implant mineralized tissue (MB%) were higher at the loaded compared with the unloaded sites. Moreover, a higher MBIC% was found at the lower compared with the higher final insertion torque.Conclusions: Immediate loading does not seem to have a negative effect on osseointegration. High torque values for the immediate loading procedures were not necessary. Probably, low torque values, were sufficient to obtain primary stability and hence may provide better osseointegration than high torque value.
Resumo:
The oral rehabilitation of edentulous patients with immediate loading has become a safe procedure with high predictability. The success is related to immediate fabrication of a passive fit framework to attach the implants. Based on these considerations, this case report shows an alternative technique for mandibular rehabilitation using implants immediately loaded, where the framework was fabricated using cylinders with internal reinforcement and precast pieces, electrowelding, and conventional welding providing esthetics and function to the patient in a short period of time.
Resumo:
The aim of this study was to measure changes in buccal alveolar crestal bone levels after immediate placement and loading of dental implants with Morse taper prosthetic abutments after tooth extraction. This study followed the STROBE guidelines regarding prospective cohort studies. The sample comprised 12 patients with a mean age of 45 years, in whom a central or upper lateral incisor was indicated for extraction. Prior to extraction, computed tomography (CT) analysis was carried out to assess the presence of the buccal bone crest. CT scans were performed at 24 h and at 6 months after immediate implant placement and immediate loading. The distance from the most apical point of the implant platform to the buccal bone crest was assessed at the two time points. The buccal bone crest height was evaluated at three points in the mesio-distal direction: (1) the centre point of the alveolus, (2) 1 mm mesial to the centre point, and (3) 1 mm distal to the centre point. The values obtained were subjected to statistical analysis, comparing the distances from the bone crest to the implant platform for the two time points. After 6 months there was a statistically significant, non-uniform reduction in height at the level of the crest of the buccal bone in the cervical direction. It is concluded that the buccal bone crest of the immediate implants that replaced the maxillary incisors underwent apical resorption when subjected to immediate loading.
Resumo:
ObjectiveTo compare the sequential healing at immediately loaded implants installed in a healed alveolar bony ridge or immediately after tooth extraction.Material and methodsIn the mandible of 12 dogs, the second premolars were extracted. After 3months, the mesial roots of the third premolars were endodontically treated and the distal roots extracted. Implants were placed immediately into the extraction sockets (test) and in the second premolar region (control). Crowns were applied at the second and third maxillary premolars, and healing abutments of appropriate length were applied at both implants placed in the mandible and adapted to allow occlusal contacts with the crowns in the maxilla. The time of surgery and time of sacrifices were planned in such a way to obtain biopsies representing the healing after 1 and 2weeks and 1 and 3months. Ground sections were prepared for histological analyses.ResultsAt the control sites, a resorption of the buccal bone of 1mm was found after 1week and remained stable thereafter. At the test sites, the resorption was 0.4mm at 1-week period and further loss was observed after 1month. The height of the peri-implant soft tissue was 3.8mm both at test and control sites. Higher values of mineralized bone-to-implant contact and bone density were seen at the controls compared with the test sites. The differences, however, were not statistically significant.ConclusionsDifferent patterns of sequential early healing were found at implants installed in healed alveolar bone or in alveolar sockets immediately after tooth extractions. However, three months after implant installation, no statistically significant differences were found for the hard- and soft-tissue dimensions.