783 resultados para Historical cost-based
Resumo:
There is an intense debate on the convenience of moving from historical cost (HC) toward the fair value (FV) principle. The debate and academic research is usually concerned with financial instruments, but the IAS 41 requirement of fair valuation for biological assets brings it into the agricultural domain. This paper performs an empirical study with a sample of Spanish farms valuing biological assets at HC and a sample applying FV, finding no significant differences between both valuation methods to assess future cash flows. However, most tests reveal more predictive power of future earnings under fair valuation of biological assets, which is not explained by differences in volatility of earnings and profitability. The study also evidences the existence of flawed HC accounting practices for biological assets in agriculture, which suggests scarce information content of this valuation method in the predominant small business units existing in the agricultural sector in advanced Western countries
Resumo:
In this paper we highlight the importance of the operational costs in explaining economic growth and analyze how the industrial structure affects the growth rate of the economy. If there is monopolistic competition only in an intermediate goods sector, then production growth coincides with consumption growth. Moreover, the pattern of growth depends on the particular form of the operational cost. If the monopolistically competitive sector is the final goods sector, then per capita production is constant but per capita effective consumption or welfare grows. Finally, we modify again the industrial structure of the economy and show an economy with two different growth speeds, one for production and another for effective consumption. Thus, both the operational cost and the particular structure of the sector that produces the final goods determines ultimately the pattern of growth.
Resumo:
In this paper we highlight the importance of the operational costs in explaining economic growth and analyze how the industrial structure affects the growth rate of the economy. If there is monopolistic competition only in an intermediate goods sector, then production growth coincides with consumption growth. Moreover, the pattern of growth depends on the particular form of the operational cost. If the monopolistically competitive sector is the final goods sector, then per capita production is constant but per capita effective consumption or welfare grows. Finally, we modify again the industrial structure of the economy and show an economy with two different growth speeds, one for production and another for effective consumption. Thus, both the operational cost and the particular structure of the sector that produces the final goods determines ultimately the pattern of growth.
Resumo:
Este estudio realiza un investigación empírica comparando las dificultades que se derivan de la utilización del valor razonable (VR) y del coste histórico (CH) en el sector agrícola. Se analiza también la fiabilidad de ambos métodos de valoración para la interpretación de la información y la toma de decisiones por parte de los agentes que actúan en el sector. Mediante un experimento realizado con estudiantes, agricultores y contables que operan en el sector agrícola, se halla que estos tienen más dificultades, cometen mayores errores e interpretan peor la información contable realizada a CH que la realizada a VR. Entrevistas en profundidad con agricultores y contables agrícolas desvelan prácticas contables defectuosas derivadas de la necesidad de aplicar el CH en el sector en España. Dadas las complejidades del cálculo del coste de los activos biológicos y el predominio de pequeñas explotaciones en el sector en los países occidentales avanzados, el estudio concluye que la contabilidad a VR constituye una mejoría de utilización y desarrollo de la contabilidad en el sector que la confeccionada a CH. Asimismo, el CH transmite una peor representación de la situación real de las explotaciones agrícolas.
Resumo:
This paper presents empirical research comparing the accounting difficulties that arise from the use of two valuation methods for biological assets, fair value (FV) and historical cost (HC) accounting, in the agricultural sector. It also compares how reliable each valuation method is in the decision-making process of agents within the sector. By conducting an experiment with students, farmers, and accountants operating in the agricultural sector, we find that they have more difficulties, make larger miscalculations and make poorer judgements with HC accounting than with FV accounting. In-depth interviews uncover flawed accounting practices in the agricultural sector in Spain in order to meet HC accounting requirements. Given the complexities of cost calculation for biological assets and the predominance of small family business units in advanced Western countries, the study concludes that accounting can be more easily applied in the agricultural sector under FV than HC accounting, and that HC conveys a less accurate grasp of the real situation of a farm.
Resumo:
This paper analyzes the potential of one-step transfer prices based on either variable or full costs for coordinating decentralized production and quality-improving investment decisions. Transfer prices based on variable costs fail to induce investments on the upstream stage. In contrast, transfer prices based on full costs provide strong investment incentives for the upstream divisions. However, they fail to coordinate the investment decisions. We show that negotiations prevent such coordination failure. In particular, we find that the firm benefits from a higher degree of decentralization so that total profit increases in the number of parameters being subject to negotiations.
Resumo:
The application of Markov processes is very useful to health-care problems. The objective of this study is to provide a structured methodology of forecasting cost based upon combining a stochastic model of utilization (Markov Chain) and deterministic cost function. The perspective of the cost in this study is the reimbursement for the services rendered. The data to be used is the OneCare database of claim records of their enrollees over a two-year period of January 1, 1996–December 31, 1997. The model combines a Markov Chain that describes the utilization pattern and its variability where the use of resources by risk groups (age, gender, and diagnosis) will be considered in the process and a cost function determined from a fixed schedule based on real costs or charges for those in the OneCare claims database. The cost function is a secondary application to the model. Goodness-of-fit will be used checked for the model against the traditional method of cost forecasting. ^
Resumo:
ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. RESUMEN: La estimación rápida de costes en fases iniciales del proyecto por métodos paramétricos y referencias estadísticas es un tema bien estudiado, divulgado y aplicado en el sector de la construcción. Sin embargo, existe poca literatura técnica sobre sistemas de predimensionado de tiempos, que permitan realizar rápidamente una planificación con un grado de aproximación razonable. Este texto reúne dos aspectos ya conocidos, pero hasta ahora independientes, y una aportación propia: -La estimación del plazo final por referencias estadísticas (BCIS, 2000) - La estimación del reparto del coste total a lo largo de la ejecución mediante curvas "S" (diversos autores) La estimación de la duración de la ejecución de las actividades en función de su coste. El conjunto de estas tres técnicas, aplicadas a un proyecto, permite obtener una planificación con el suficiente grado de detalle y fiabilidad para tomar decisiones en fases iniciales del proyecto.
Resumo:
Since 1988, quasi-markets have been introduced into many areas of social policy in the UK, the NHS internal market is one example. Markets operate by price signals. The NHS Internal Market, if it is to operate efficiently, requires purchasers and providers to respond to price signals. The research hypothesis is - cost accounting methods can be developed to enable healthcare contracts to be priced on a cost-basis in a manner which will facilitate the achievement of economic efficiency in the NHS internal market. Surveys of hospitals in 1991 and 1994 established the cost methods adopted in deriving the prices for healthcare contracts in the first year of the market and three years on. An in-depth view of the costing for pricing process was gained through case studies. Hospitals had inadequate cost information on which to price healthcare contracts at the inception of the internal market: prices did not reflect the relative performance of healthcare providers sufficiently closely to enable the market's espoused efficiency aims to be achieved. Price variations were often due to differing costing approaches rather than efficiency. Furthermore, price comparisons were often meaningless because of inadequate definition of the services (products). In April 1993, the NHS Executive issued guidance on costing for contracting to all NHS providers in an attempt to improve the validity of price comparisons between alternative providers. The case studies and the 1994 survey show that although price comparison has improved, considerable problems remain. Consistency is not assured, and the problem of adequate product definition is still to be solved. Moreover, the case studies clearly highlight the mismatch of rigid, full-cost pricing rules with both the financial management considerations at local level and the emerging internal market(s). Incentives exist to cost-shift, and healthcare prices can easily be manipulated. In the search for a new health policy paradigm to replace traditional bureaucratic provision, cost-based pricing cannot be used to ensure a more efficient allocation of healthcare resources.
Resumo:
In this paper, a congestion control mechanism is presented for multiservice wireless OFDMA networks. The revenue rate and the user SNR's are used to partition the bandwidth in accordance with a complete partitioning structure. Moreover, through the use of our scheme the QoS of any ongoing connections can be satisfied. Results show that the revenue rate plays an important role in prioritizing the different services. © 2013 Springer Science+Business Media New York.
Resumo:
Ground delay programs typically involve the delaying of aircraft that are departing from origin airports within some set distance of a capacity constrained destination airport. Long haul flights are not delayed in this way. A trade-off exists when fixing the distance parameter: increasing the ‘scope’ distributes delay among more aircraft and may reduce airborne holding delay but could also result in unnecessary delay in the (frequently observed) case of early program cancellation. In order to overcome part of this drawback, a fuel based cruise speed reduction strategy aimed at realizing airborne delay, was suggested by the authors in previous publications. By flying slower, at a specific speed, aircraft that are airborne can recover part of their initially assigned delay without incurring extra fuel consumption if the ground delay program is canceled before planned. In this paper, the effect of the scope of the program is assessed when applying this strategy. A case study is presented by analyzing all the ground delay programs that took place at San Francisco, Newark Liberty and Chicago O’Hare International airports during one year. Results show that by the introduction of this technique it is possible to define larger scopes, partially reducing the amount of unrecovered delay.
Resumo:
En route speed reduction can be used for air traffic flow management (ATFM), e.g., delaying aircraft while airborne or realizing metering at an arrival fix. In previous publications, the authors identified the flight conditions that maximize the airborne delay without incurring extra fuel consumption with respect to the nominal (not delayed) flight. In this paper, the effect of wind on this strategy is studied, and the sensitivity to wind forecast errors is also assessed. A case study done in Chicago O’Hare airport (ORD) is presented, showing that wind has a significant effect on the airborne delay that can be realized and that, in some cases, even tailwinds might lead to an increase in the maximum amount of airborne delay. The values of airborne delay are representative enough to suggest that this speed reduction technique might be useful in a real operational scenario. Moreover, the speed reduction strategy is more robust than nominal operations against fuel consumption in the presence of wind forecast uncertainties.