976 resultados para Group Maintenance Scheduling,


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we present a Constraint Logic Programming (CLP) based model, and hybrid solving method for the Scheduling of Maintenance Activities in the Power Transmission Network. The model distinguishes from others not only because of its completeness but also by the way it models and solves the Electric Constraints. Specifically we present a efficient filtering algorithm for the Electrical Constraints. Furthermore, the solving method improves the pure CLP methods efficiency by integrating a type of Local Search technique with CLP. To test the approach we compare the method results with another method using a 24 bus network, which considerers 42 tasks and 24 maintenance periods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Wireless sensor networks are promising solutions for many applications. However, wireless sensor nodes suffer from many constraints such as low computation capability, small memory, limited energy resources, and so on. Grouping is an important technique to localize computation and reduce communication overhead in wireless sensor networks. In this paper, we use grouping to refer to the process of combining a set of sensor nodes with similar properties. We propose two centralized group rekeying (CGK) schemes for secure group communication in sensor networks. The lifetime of a group is divided into three phases, i.e., group formation, group maintenance, and group dissolution. We demonstrate how to set up the group and establish the group key in each phase. Our analysis shows that the proposed two schemes are computationally efficient and secure.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Teollisuuden pyörivien sähkökäyttöjen ennakoivaan kunnossapitoon investoidaan jatkuvasti enemmän ja enemmän, jotta käytönaikaisia sähkökäyttöjen rikkoontumisia saataisiin ehkäistyksi. Lisäksi huoltojen ajoittamista halutaan optimoida siten, että suunniteltujen tuotantoseisokkien aikana saataisiin tehdyksi oleelliset ja tarpeelliset huoltotoimenpiteet. Pyörivien sähkökäyttöjen kunnonvalvontamenetelmiä ja -tapoja on erilaisia ja yhtenä vaihtoehtona voisi olla reaaliaikainen värähtelymittaus. Tässä diplomityössä tarkastellaan kunnossapidon käsitteitä, värähtelymittaukseen liittyviä suureita ja menetelmiä, sekä reaaliaikaisen värähtelymittauksen hyödyntämistä teollisuudessa.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Venous wounds cause physical, psychological and financial problems that impact the quality of life of patients. Treatment alternatives are investigated in order to reduce healthcare costs and improve quality of life of people affected by this problem. Physical resources, such as therapeutic ultrasound (US), are being considered in the treatment of ulcers as a potential healing agent. This study aimed to investigate the application of US as a treatment for venous ulcers. Subjects were divided into two groups: US group, where treatment consisted of 5 sessions of pulsed US (3 MHz, 1W/cm²) associated with compression and kinesiotherapy; and sham group, where individuals went through the same procedures, but with sham US therapy. Subjects were evaluated for wound size by planimetry and digital photography, visual analogue scale for pain, quality of life by the questionnaires SF- 36 and VEINES-QoL/Sym and enzymatic activity of metalloproteinases 2 and 9 by zymography. It was observed mean reduction in wound area of 41.58±53.8% for the US group and 63.47±37.2% for the placebo group, maintenance of quality of life scores in the US group and significant improvement (p<0.05) in the placebo group by VEINES questionnaire. It was observed decreased perception of pain in the placebo group. Sample feasibility for analysis of the protein activity of metalloproteinases 2 and 9 by zymography collected by swab method was also confirmed. Our data did not give us evidence to support the theory that the US accelerates healing of venous ulcers in a short-term analysis. However, we observed that standard care associated with compression therapy and kinesiotherapy were able to significantly shorten the progression of chronic venous ulcers

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study analyzes an accident in which two maintenance workers suffered severe burns while replacing a circuit breaker panel in a steel mill, following model of analysis and prevention of accidents (MAPA) developed with the objective of enlarging the perimeter of interventions and contributing to deconstruction of blame attribution practices. The study was based on materials produced by a health service team in an in-depth analysis of the accident. The analysis shows that decisions related to system modernization were taken without considering their implications in maintenance scheduling and creating conflicts of priorities and of interests between production and safety; and also reveals that the lack of a systemic perspective in safety management was its principal failure. To explain the accident as merely non-fulfillment of idealized formal safety rules feeds practices of blame attribution supported by alibi norms and inhibits possible prevention. In contrast, accident analyses undertaken in worker health surveillance services show potential to reveal origins of these events incubated in the history of the system ignored in practices guided by the traditional paradigm.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study analyzes an accident in which two maintenance workers suffered severe burns while replacing a circuit breaker panel in a steel mill, following model of analysis and prevention of accidents (MAPA) developed with the objective of enlarging the perimeter of interventions and contributing to deconstruction of blame attribution practices. The study was based on materials produced by a health service team in an in-depth analysis of the accident. The analysis shows that decisions related to system modernization were taken without considering their implications in maintenance scheduling and creating conflicts of priorities and of interests between production and safety; and also reveals that the lack of a systemic perspective in safety management was its principal failure. To explain the accident as merely non-fulfillment of idealized formal safety rules feeds practices of blame attribution supported by alibi norms and inhibits possible prevention. In contrast, accident analyses undertaken in worker health surveillance services show potential to reveal origins of these events incubated in the history of the system ignored in practices guided by the traditional paradigm.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Abstract?Background: There is no globally accepted open source software development process to define how open source software is developed in practice. A process description is important for coordinating all the software development activities involving both people and technology. Aim: The research question that this study sets out to answer is: What activities do open source software process models contain? The activity groups on which it focuses are Concept Exploration, Software Requirements, Design, Maintenance and Evaluation. Method: We conduct a systematic mapping study (SMS). A SMS is a form of systematic literature review that aims to identify and classify available research papers concerning a particular issue. Results: We located a total of 29 primary studies, which we categorized by the open source software project that they examine and by activity types (Concept Exploration, Software Requirements, Design, Maintenance and Evaluation). The activities present in most of the open source software development processes were Execute Tests and Conduct Reviews, which belong to the Evaluation activities group. Maintenance is the only group that has primary studies addressing all the activities that it contains. Conclusions: The primary studies located by the SMS are the starting point for analyzing the open source software development process and proposing a process model for this community. The papers in our paper pool that describe a specific open source software project provide more regarding our research question than the papers that talk about open source software development without referring to a specific open source software project.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

“Availability” is the terminology used in asset intensive industries such as petrochemical and hydrocarbons processing to describe the readiness of equipment, systems or plants to perform their designed functions. It is a measure to suggest a facility’s capability of meeting targeted production in a safe working environment. Availability is also vital as it encompasses reliability and maintainability, allowing engineers to manage and operate facilities by focusing on one performance indicator. These benefits make availability a very demanding and highly desired area of interest and research for both industry and academia. In this dissertation, new models, approaches and algorithms have been explored to estimate and manage the availability of complex hydrocarbon processing systems. The risk of equipment failure and its effect on availability is vital in the hydrocarbon industry, and is also explored in this research. The importance of availability encouraged companies to invest in this domain by putting efforts and resources to develop novel techniques for system availability enhancement. Most of the work in this area is focused on individual equipment compared to facility or system level availability assessment and management. This research is focused on developing an new systematic methods to estimate system availability. The main focus areas in this research are to address availability estimation and management through physical asset management, risk-based availability estimation strategies, availability and safety using a failure assessment framework, and availability enhancement using early equipment fault detection and maintenance scheduling optimization.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Axle bearing damage with possible catastrophic failures can cause severe disruptions or even dangerous derailments, potentially causing loss of human life and leading to significant costs for railway infrastructure managers and rolling stock operators. Consequently the axle bearing damage process has safety and economic implications on the exploitation of railways systems. Therefore it has been the object of intense attention by railway authorities as proved by the selection of this topic by the European Commission in calls for research proposals. The MAXBE Project (http://www.maxbeproject.eu/), an EU-funded project, appears in this context and its main goal is to develop and to demonstrate innovative and efficient technologies which can be used for the onboard and wayside condition monitoring of axle bearings. The MAXBE (interoperable monitoring, diagnosis and maintenance strategies for axle bearings) project focuses on detecting axle bearing failure modes at an early stage by combining new and existing monitoring techniques and on characterizing the axle bearing degradation process. The consortium for the MAXBE project comprises 18 partners from 8 member states, representing operators, railway administrations, axle bearing manufactures, key players in the railway community and experts in the field of monitoring, maintenance and rolling stock. The University of Porto is coordinating this research project that kicked-off in November 2012 and it is completed on October 2015. Both on-board and wayside systems are explored in the project since there is a need for defining the requirement for the onboard equipment and the range of working temperatures of the axle bearing for the wayside systems. The developed monitoring systems consider strain gauges, high frequency accelerometers, temperature sensors and acoustic emission. To get a robust technology to support the decision making of the responsible stakeholders synchronized measurements from onboard and wayside monitoring systems are integrated into a platform. Also extensive laboratory tests were performed to correlate the in situ measurements to the status of the axle bearing life. With the MAXBE project concept it will be possible: to contribute to detect at an early stage axle bearing failures; to create conditions for the operational and technical integration of axle bearing monitoring and maintenance in different European railway networks; to contribute to the standardization of the requirements for the axle bearing monitoring, diagnosis and maintenance. Demonstration of the developed condition monitoring systems was performed in Portugal in the Northern Railway Line with freight and passenger traffic with a maximum speed of 220 km/h, in Belgium in a tram line and in the UK. Still within the project, a tool for optimal maintenance scheduling and a smart diagnostic tool were developed. This paper presents a synthesis of the most relevant results attained in the project. The successful of the project and the developed solutions have positive impact on the reliability, availability, maintainability and safety of rolling stock and infrastructure with main focus on the axle bearing health.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose To describe event-free survival (EFS) and toxicities in children with low-risk acute lymphoblastic leukemia (ALL) assigned to receive either continuous 6-mercaptopurine (6-MP) and weekly methotrexate (MIX) or intermittent 6-MP with intermediate-dose MTX, as maintenance treatment. Patients and Methods Between October 1, 2000, and December 31, 2007, 635 patients with low-risk ALL were enrolled onto Brazilian Childhood Cooperative Group for ALL Treatment (GBTLI) ALL-99 protocol. Eligible children (n=544) were randomly allocated to receive either continuous 6-ME/MIX (group 1, n 272) or intermittent 6-MP (100 mg/m(2)/d for 10 days, with 11 days resting) and MIX (200 mg/m(2) every 3 weeks; group 2, n = 272). Results The 5-year overall survival (OS) and EFS were 92.5% +/- 1.5% SE and 83.6% +/- 2.1% SE, respectively. According to maintenance regimen, the OS was 91.4% +/- 2.2% SE (group 1) and 93.6% +/- 2.1% SE (group 2; P=.28) and EFS 80.9% +/- 3.2% SE (group 1) and 86.5% +/- 2.8% SE (group 2; P=.089). Remarkably, the intermittent regimen led to significantly higher EFS among boys (85.7% v 74.9% SE; P=027), while no difference was seen for girls (87.0% v 88.8% SE; P=.78). Toxic episodes were recorded in 226 and 237 children, respectively. Grade 3 to 4 toxic events for groups 1 and 2 were, respectively, 273 and 166 for hepatic dysfunction (P=.002), and 772 and 636 for hematologic episodes (P=.005). Deaths on maintenance were: seven (group 1) and one (group 2). Conclusion The intermittent use of 6-MP and MIX in maintenance is a less toxic regimen, with a trend toward better long-term EFS. Boys treated with the intermittent schedule had significantly better EFS.