992 resultados para Fire Fighting


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fire and rescue staff routinely endure significant psychological and environmental stress exposure on the job. While much has been done to improve understanding of the physiological effects of exposure to these conditions, little has been done to quantify the inflammatory stress response that firefighters are exposed to during wildfire suppression. Therefore the aim of the present study was to explore whether firefighters experienced a change in inflammatory markers following one day, and across two days of wildfire suppression tasks. Twelve male fire-fighters participated in two consecutive days of live-fire prescribed burn operations in Ngarkat National Park, South Australia. Typical work tasks included lighting burns, patrolling containment lines, supressing spot fires, and operating vehicles. A number of the inflammatory markers changed significantly across the course of a shift and several presented with an attenuated response across the second day. This finding implies that there was a compounding effect of repeated exposure to these stressors which could have considerable implications for managing fire-fighters health and wellbeing over a multi-day campaign. Further research is required to see which fire ground stressor, or combination of stressors is causing these changes in the inflammatory markers across consecutive work shifts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The EU’s October summit was dominated by one issue; the migration and refugee crisis, with EU leaders intent on putting on a public display of unity after weeks of bitter arguments, and concentrating on fire-fighting and immediate measures to tackle the most pressing reasons for, and impacts of, the crisis. Longer-term measures to address some of the root causes of increased migratory flows, support for the integration of newly arrived refugees or the introduction of new channels of legal migration, were not discussed. The Summit also spent little time on two issues that had originally been expected to be a key part of the agenda: the forthcoming British referendum on EU membership, where irritation with the slow pace of talks and British vagueness about its demands were in evidence; and the governance of Economic and Monetary Union (EMU), where EU leaders missed another opportunity for a thorough debate about future perspectives on the basis of the ‘Five Presidents’ Report’.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Issued October 1946."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This manual supersedes Bureau of Ships fire fighting manual (Rev. 1944)."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

East-West trade has grown rapidly since the sixties, stimulating a parallel expansion in the literature on the subject. An extensive review of this literature shows how: (i) most of the issues involved have at their source the distinctions between East and West in political ideology and/or economic management, and (ii) there has been a tendency to keep theoretical and practical perspectives on the subject too separate. This thesis demonstrates the importance of understanding the fundamental principles implied in the first point, and represents an attempt to bridge the gap identified in the second. A detailed study of the market for fire fighting equipment in Eastern Europe is undertaken in collaboration with a medium-sized company, Angus Fire Armour Limited. Desk research methods are combined with visits to the market to assess the potential for the company's products, and recommendations for future strategy are made. The case demonstrates the scope and limitations of various research methods for the East European market, and a model for market research relevant to all companies is developed. Tne case study highlights three areas largely neglected in the literature: (i) the problems of internal company adaptation to East European conditions; (ii) the division of responsibility between foreign trade organisations; and (iii) bribery and corruption in East-West trade. Further research into the second topic - through a survey of 36 UK exporters - and the third - through analysis of publicised corruption cases - confirms the representativeness of the Angus experience, and reflects on the complexity of the Bast European import process, which does not always function as is commonly supposed. The very complexity of the problems confronting companies reaffirms the need to appreciate the principles underlying the subject, while the detailed analysis into questions of, originally, a marketing nature, reveals wider implications for East-West trade and East-West relations.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Between 2003 and 2007 an urban network or road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as "Calle 30 Project" counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure includieng, in some parts of the tunnel, fixed fire fighting system based on water mist. Whithin this framework a large-scale programme of fire tests was planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinguishing system. In addition, these large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San pedro of Anes" which includes a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test's programme carried out and some previous results obtained.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Between 2003 and 2007 an urban network of road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as “Calle30 Project” counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure including,in some parts of the tunnel, fixed fire fighting system based on water mist. Within this framework a large-scale campaign of fire tests were planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinction system. In addition, this large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San Pedro of Anes" which counts with a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test’s campaign carried out and some previous results obtained.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The author's approach to the problems associated with building in bushfire prone landscapes comes from 12 years of study of the biophysical and cultural landscapes in the Great Southern Region of Western Australia - research which resulted in the design and construction of the H-house at Bremer Bay. The house was developed using a 'ground up' approach whereby Dr Weir conducted topographical surveys and worked with a local botanist and a bushfire risk consultant to ascertain the level of threat that fire presented to this particular site. The intention from the outset however, was not to design a bushfire resistant house per se, but to develop a design which would place the owners in close proximity to the highly biodiverse heath vegetation of their site. The research aim was to find ways - through architectural design-to link the patterns of usage of the house with other site specific conditions related to the prevailing winds, solar orientation and seasonal change. The H-house has a number of features which increase the level of bushfire safety. These include: Fire rated roller shutters (tested by the CSIRO for ember attack and radiant heat), Fire resistant double glazing (on windows not protected by the shutters), Fibre-cement sheet cladding of the underside of the elevated timber floor structure, Manually operated high pressure sprinkler system on exposed timber decks, A fire refuge (an enlarged laundry, shower area) within the house with a dedicated cabinet for fire fighting equipment) and A low pressure solar powered domestic water supply system.