3 resultados para FMOLP


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Solving fuzzy linear programming (FLP) requires the employment of a consistent ranking of fuzzy numbers. Ineffective fuzzy number ranking would lead to a flawed and erroneous solving approach. This paper presents a comprehensive and extensive review on fuzzy number ranking methods. Ranking techniques are categorised into six classes based on their characteristics. They include centroid methods, distance methods, area methods, lexicographical methods, methods based on decision maker's viewpoint, and methods based on left and right spreads. A survey on solving approaches to FLP is also reported. We then point out errors in several existing methods that are relevant to the ranking of fuzzy numbers and thence suggest an effective method to solve FLP. Consequently, FLP problems are converted into non-fuzzy single (or multiple) objective linear programming based on a consistent centroid-based ranking of fuzzy numbers. Solutions of FLP are then obtained by solving corresponding crisp single (or multiple) objective programming problems by conventional methods.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since asset returns have been recognized as not normally distributed, the avenue of research regarding portfolio higher moments soon emerged. To account for uncertainty and vagueness of portfolio returns as well as of higher moment risks, we proposed a new portfolio selection model employing fuzzy sets in this paper. A fuzzy multi-objective linear programming (MOLP) for portfolio optimization is formulated using marginal impacts of assets on portfolio higher moments, which are modelled by trapezoidal fuzzy numbers. Through a consistent centroid-based ranking of fuzzy numbers, the fuzzy MOLP is transformed into an MOLP that is then solved by the maximin method. By taking portfolio higher moments into account, the approach enables investors to optimize not only the normal risk (variance) but also the asymmetric risk (skewness) and the risk of fat-tails (kurtosis). An illustrative example demonstrates the efficiency of the proposed methodology comparing to previous portfolio optimization models.