909 resultados para Equipment allocation
Resumo:
Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.
Resumo:
Earthworks tasks aim at levelling the ground surface at a target construction area and precede any kind of structural construction (e.g., road and railway construction). It is comprised of sequential tasks, such as excavation, transportation, spreading and compaction, and it is strongly based on heavy mechanical equipment and repetitive processes. Under this context, it is essential to optimize the usage of all available resources under two key criteria: the costs and duration of earthwork projects. In this paper, we present an integrated system that uses two artificial intelligence based techniques: data mining and evolutionary multi-objective optimization. The former is used to build data-driven models capable of providing realistic estimates of resource productivity, while the latter is used to optimize resource allocation considering the two main earthwork objectives (duration and cost). Experiments held using real-world data, from a construction site, have shown that the proposed system is competitive when compared with current manual earthwork design.
Resumo:
Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs and duration of earthworks in infrastructure construction, the optimal usage of every resource in these tasks is paramount. Considering the characteristics of an earthwork construction, it can be looked at as a production line based on resources (mechanical equipment) and dependency relations between sequential tasks, hence being susceptible to optimization. Up to the present, the steady development of Information Technology areas, such as databases, artificial intelligence and operations research, has resulted in the emergence of several technologies with potential application bearing that purpose in mind. Among these, modern optimization methods (also known as metaheuristics), such as evolutionary computation, have the potential to find high quality optimal solutions with a reasonable use of computational resources. In this context, this work describes an optimization algorithm for earthworks equipment allocation based on a modern optimization approach, which takes advantage of the concept that an earthwork construction can be regarded as a production line.
Resumo:
Tese de Doutoramento em Engenharia Civil.
Resumo:
Aims To date, there is no convincing evidence that non-insulin treated patients who undertake self-blood glucose monitoring (SBGM) have better glycaemic control than those who test their urine. This has led to a recommendation that non-insulin dependent patients undertake urine testing, which is the cheaper option. This recommendation does not take account of patients' experiences and views. This study explores the respective merits of urine testing and SBGM from the perspectives of newly diagnosed patients with Type 2 diabetes. Methods Qualitative study using repeat in-depth interviews with 40 patients. Patients were interviewed three times at 6-monthly intervals over 1 year. Patients were recruited from hospital clinics and general practices in Lothian, Scotland. The study was informed by grounded theory, which involves concurrent data collection and analysis. Results Patients reported strongly negative views of urine testing, particularly when they compared it with SBGM. Patients perceived urine testing as less convenient, less hygienic and less accurate than SBGM. Most patients assumed that blood glucose meters were given to those with a more advanced or serious form of diabetes. This could have implications for how they thought about their own disease. Patients often interpreted negative urine results as indicating that they could not have diabetes. Conclusions Professionals should be aware of the meanings and understandings patients attach to the receipt and use of different types of self-monitoring equipment. Guidelines that promote the use of consistent criteria for equipment allocation are required. The manner in which negative urine results are conveyed needs to be reconsidered.
Resumo:
Magnetic resonance imaging (MRI) is a method of image diagnose proven to be of undeniable importance when it comes to neuro and cardio related diseases. In fact, these diseases (such as: ischemic heart disease, stroke and acute myocardial infection) have high incidence in Portugal. For these reasons, the allocation of this medical technology should not be considered with light thoughts. In fact, making decision of resource allocation in health care can be a very complex and contested matter. The impacts of new technology allocation, such MRI, can be assessed in a variety of ways. However, a fundamental component should always be present: the use of evidence-based decision-making methods. One of these methods is Technology Assessment (TA). This paper aims to characterize the equity on access of the Portuguese population in general, to a specific medical device such as MRI, under the TA point of view. It is hoped to promote a bridge of scientific knowledge between the gap on research and policy-making through TA that can emerge as a tool to aid decision-makers in the organization of health systems. There are gaps in providing healthcare, due to geographical imbalances, with some areas unable to provide certain specialized services, as hospitals in the countryside do not provide all medical specialties. Portugal has also a large independent private sector that provides diagnostic and therapeutic services to NHS users under contracts called conventions. These medical contracts cover ambulatory health facilities for laboratory tests and examinations such as diagnostic tests and Radiology. However, there is no convention from the NHS when concerning the MRI exam. Therefore, this reality can be considered a limitation in the access of the general population to this kind of clinical exam. TA can play an useful and important role in helping the decision-makers to explore potential gains that might be achieved by introducing a more rational decision making into health care management, namely into the Radiology area, regarding the allocation of MRI equipment.
Resumo:
The optimized allocation of protective devices in strategic points of the circuit improves the quality of the energy supply and the system reliability index. This paper presents a nonlinear integer programming (NLIP) model with binary variables, to deal with the problem of protective device allocation in the main feeder and all branches of an overhead distribution circuit, to improve the reliability index and to provide customers with service of high quality and reliability. The constraints considered in the problem take into account technical and economical limitations, such as coordination problems of serial protective devices, available equipment, the importance of the feeder and the circuit topology. The use of genetic algorithms (GAs) is proposed to solve this problem, using a binary representation that does (1) or does not (0) show allocation of protective devices (reclosers, sectionalizers and fuses) in predefined points of the circuit. Results are presented for a real circuit (134 busses), with the possibility of protective device allocation in 29 points. Also the ability of the algorithm in finding good solutions while improving significantly the indicators of reliability is shown. (C) 2003 Elsevier B.V. All rights reserved.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Reliability of power supply is related, among other factors, to the control and protection devices allocation in feeders of distribution systems. In this way, optimized allocation of sectionalizing switches and protection devices in strategic points of distribution circuits, improves the quality of power supply and the system reliability indices. In this work, it is presented a mixed integer non-linear programming (MINLP) model, with real and binary variables, for the sectionalizing switches and protection devices allocation problem, in strategic sectors, aimed at improving reliability indices, increasing the utilities billing and fulfilling exigencies of regulatory agencies for the power supply. Optimized allocation of protection devices and switches for restoration, allows that those faulted sectors of the system can be isolated and repaired, re-managing loads of the analyzed feeder into the set of neighbor feeders. Proposed solution technique is a Genetic Algorithm (GA) developed exploiting the physical characteristics of the problem. Results obtained through simulations for a real-life circuit, are presented. © 2004 IEEE.
Resumo:
An analysis of the performances of three important methods for generators and loads loss allocation is presented. The discussed methods are: based on pro-rata technique; based on the incremental technique; and based on matrices of circuit. The algorithms are tested considering different generation conditions, using a known electric power system: IEEE 14 bus. Presented and discussed results verify: the location and the magnitude of generators and loads; the possibility to have agents well or poorly located in each network configuration; the discriminatory behavior considering variations in the power flow in the transmission lines. © 2004 IEEE.
Resumo:
Low flexibility and reliability in the operation of radial distribution networks make those systems be constructed with extra equipment as sectionalising switches in order to reconfigure the network, so the operation quality of the network can be improved. Thus, sectionalising switches are used for fault isolation and for configuration management (reconfiguration). Moreover, distribution systems are being impacted by the increasing insertion of distributed generators. Hence, distributed generation became one of the relevant parameters in the evaluation of systems reconfiguration. Distributed generation may affect distribution networks operation in various ways, causing noticeable impacts depending on its location. Thus, the loss allocation problem becomes more important considering the possibility of open access to the distribution networks. In this work, a graphic simulator for distribution networks with reconfiguration and loss allocation functions, is presented. Reconfiguration problem is solved through a heuristic methodology, using a robust power flow algorithm based on the current summation backward-forward technique, considering distributed generation. Four different loss allocation methods (Zbus, Direct Loss Coefficient, Substitution and Marginal Loss Coefficient) are implemented and compared. Results for a 32-bus medium voltage distribution network, are presented and discussed.
Resumo:
This paper presents an approach for the active transmission losses allocation between the agents of the system. The approach uses the primal and dual variable information of the Optimal Power Flow in the losses allocation strategy. The allocation coefficients are determined via Lagrange multipliers. The paper emphasizes the necessity to consider the operational constraints and parameters of the systems in the problem solution. An example, for a 3-bus system is presented in details, as well as a comparative test with the main allocation methods. Case studies on the IEEE 14-bus systems are carried out to verify the influence of the constraints and parameters of the system in the losses allocation.
Resumo:
This paper presents a new approach to the transmission loss allocation problem in a deregulated system. This approach belongs to the set of incremental methods. It treats all the constraints of the network, i.e. control, state and functional constraints. The approach is based on the perturbation of optimum theorem. From a given optimal operating point obtained by the optimal power flow the loads are perturbed and a new optimal operating point that satisfies the constraints is determined by the sensibility analysis. This solution is used to obtain the allocation coefficients of the losses for the generators and loads of the network. Numerical results show the proposed approach in comparison to other methods obtained with well-known transmission networks, IEEE 14-bus. Other test emphasizes the importance of considering the operational constraints of the network. And finally the approach is applied to an actual Brazilian equivalent network composed of 787 buses, and it is compared with the technique used nowadays by the Brazilian Control Center. (c) 2007 Elsevier Ltd. All rights reserved.
Resumo:
This article presents a tool for the allocation analysis of complex systems of water resources, called AcquaNetXL, developed in the form of spreadsheet in which a model of linear optimization and another nonlinear were incorporated. The AcquaNetXL keeps the concepts and attributes of a decision support system. In other words, it straightens out the communication between the user and the computer, facilitates the understanding and the formulation of the problem, the interpretation of the results and it also gives a support in the process of decision making, turning it into a clear and organized process. The performance of the algorithms used for solving the problems of water allocation was satisfactory especially for the linear model.
Resumo:
As many countries are moving toward water sector reforms, practical issues of how water management institutions can better effect allocation, regulation, and enforcement of water rights have emerged. The problem of nonavailability of water to tailenders on an irrigation system in developing countries, due to unlicensed upstream diversions is well documented. The reliability of access or equivalently the uncertainty associated with water availability at their diversion point becomes a parameter that is likely to influence the application by users for water licenses, as well as their willingness to pay for licensed use. The ability of a water agency to reduce this uncertainty through effective water rights enforcement is related to the fiscal ability of the agency to monitor and enforce licensed use. In this paper, this interplay across the users and the agency is explored, considering the hydraulic structure or sequence of water use and parameters that define the users and the agency`s economics. The potential for free rider behavior by the users, as well as their proposals for licensed use are derived conditional on this setting. The analyses presented are developed in the framework of the theory of ""Law and Economics,`` with user interactions modeled as a game theoretic enterprise. The state of Ceara, Brazil, is used loosely as an example setting, with parameter values for the experiments indexed to be approximately those relevant for current decisions. The potential for using the ideas in participatory decision making is discussed. This paper is an initial attempt to develop a conceptual framework for analyzing such situations but with a focus on the reservoir-canal system water rights enforcement.