952 resultados para Environmental impact statement
Resumo:
1
Resumo:
2
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
This guide is written for Booz Allen Hamilton (BAH) employees assigned to the Public Lands team who may have some National Environmental Policy Act (NEPA) knowledge, possibly have experience with writing Environmental Impact Statements (EIS), and with little or no experience writing programmatic EIS documents. The guide contains information encompassing the preparation of a complete Resource Management Plan/Environmental Impact Statement (RMP/EIS) for the Bureau of Land Management. The RMP/EIS is a programmatic NEPA document which has many differences and nuances distinct from a typical project type EIS. This guide provides the information necessary for a BAH Public Lands team member to understand the project process and the RMP/EIS document to successfully maneuver through the entire project from beginning to end.
Resumo:
F also available in microfiche.
Resumo:
Mode of access: Internet.
Resumo:
F available only in microfiche
Resumo:
F only available in microfiche.
Resumo:
Mode of access: Internet.
Resumo:
D also available in microfiche.
Resumo:
FRA co-lead agency