997 resultados para Engineering contracts
Resumo:
Mode of access: Internet.
Resumo:
This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.
Resumo:
The South Carolina Department of Transportation routinely retains Professional Consulting Engineering firms to provide engineering design and related professional services for the preparation of construction plans or design-build Request for Proposal bid packages for a wide variety of Federal-aid Highway Program roadway and bridge construction projects throughout South Carolina.The purpose of this project is to examine the current process of determining a "Fair and Reasonable" fixed fee for professional service contracts and to evaluate possible alternative methods including practices in other states that may improve the process, particularly in light of the considerable variation in audited overhead rates among consulting firms. In reviewing such alternative methods particular attention will be given to evaluating the potential impact of the method as an incentive to consulting firms to effectively manage their overhead costs.
Resumo:
Mode of access: Internet.
Resumo:
Other editions have been published by the American school of correspondence, Chicago.
Resumo:
The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.
Resumo:
Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.
Resumo:
The paper presents a method for transmission loss charge allocation in deregulated power systems based on Relative Electrical Distance (RED) concept. Based on RED between the generator and load nodes and the predefined bilateral power contracts, charge evaluation is carried out. Generally through some power exchange mechanism a set of bilateral contracts are determined that facilitate bilateral agreements between the generation and distribution entities. In this paper the possible charges incurred in meeting loads like generation charge, transmission charge and charge due to losses are evaluated. Case studies have been carried out on a few practical equivalent systems. Due to space limitation results for a sample 5 bus system are presented considering ideal load/generation power contracts and deviated load/generation power contracts. Extensive numerical testing indicates that the proposed allocation scheme produces loss allocations that are appropriate and that behave in a physically reasonable manner.
Resumo:
Failed private water concessions have been terminated and replaced with public sector operations in many countries. The paper reviews the negotiating processes involved in these terminations.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.
Resumo:
Expressing contractual agreements electronically potentially allows agents to automatically perform functions surrounding contract use: establishment, fulfilment, renegotiation etc. For such automation to be used for real business concerns, there needs to be a high level of trust in the agent-based system. While there has been much research on simulating trust between agents, there are areas where such trust is harder to establish. In particular, contract proposals may come from parties that an agent has had no prior interaction with and, in competitive business-to-business environments, little reputation information may be available. In human practice, trust in a proposed contract is determined in part from the content of the proposal itself, and the similarity of the content to that of prior contracts, executed to varying degrees of success. In this paper, we argue that such analysis is also appropriate in automated systems, and to provide it we need systems to record salient details of prior contract use and algorithms for assessing proposals on their content. We use provenance technology to provide the former and detail algorithms for measuring contract success and similarity for the latter, applying them to an aerospace case study.