We present a metaheuristic approach which combines constructive heuristics and local searches based on sampling with path relinking. Its effectiveness is demonstrated by an application to the problem of allocating switches in electrical distribution networks to improve their reliability. Our approach also treats the service restoration problem, which has to be solved as a subproblem, to evaluate the reliability benefit of a given switch allocation proposal. Comparisons with other metaheuristics and with a branch-and-bound procedure evaluate its performance. © 2012 Published by Elsevier Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. © 2010 Elsevier Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to present the application of a three-phase harmonic propagation analysis time-domain tool, using the Norton model to approach the modeling of non-linear loads, making the harmonics currents flow more appropriate to the operation analysis and to the influence of mitigation elements analysis. This software makes it possible to obtain results closer to the real distribution network, considering voltages unbalances, currents imbalances and the application of mitigation elements for harmonic distortions. In this scenario, a real case study with network data and equipments connected to the network will be presented, as well as the modeling of non-linear loads based on real data obtained from some PCCs (Points of Common Coupling) of interests for a distribution company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper shows a new hybrid method for risk assessment regarding interruptions in sensitive processes due to faults in electric power distribution systems. This method determines indices related to long duration interruptions and short duration voltage variations (SDVV), such as voltage sags and swells in each customer supplied by the distribution network. Frequency of such occurrences and their impact on customer processes are determined for each bus and classified according to their corresponding magnitude and duration. The method is based on information regarding network configuration, system parameters and protective devices. It randomly generates a number of fault scenarios in order to assess risk areas regarding long duration interruptions and voltage sags and swells in an especially inventive way, including frequency of events according to their magnitude and duration. Based on sensitivity curves, the method determines frequency indices regarding disruption in customer processes that represent equipment malfunction and possible process interruptions due to voltage sags and swells. Such approach allows for the assessment of the annual costs associated with each one of the evaluated power quality indices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper a computational implementation of an evolutionary algorithm (EA) is shown in order to tackle the problem of reconfiguring radial distribution systems. The developed module considers power quality indices such as long duration interruptions and customer process disruptions due to voltage sags, by using the Monte Carlo simulation method. Power quality costs are modeled into the mathematical problem formulation, which are added to the cost of network losses. As for the EA codification proposed, a decimal representation is used. The EA operators, namely selection, recombination and mutation, which are considered for the reconfiguration algorithm, are herein analyzed. A number of selection procedures are analyzed, namely tournament, elitism and a mixed technique using both elitism and tournament. The recombination operator was developed by considering a chromosome structure representation that maps the network branches and system radiality, and another structure that takes into account the network topology and feasibility of network operation to exchange genetic material. The topologies regarding the initial population are randomly produced so as radial configurations are produced through the Prim and Kruskal algorithms that rapidly build minimum spanning trees. (C) 2009 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An algorithm inspired on ant behavior is developed in order to find out the topology of an electric energy distribution network with minimum power loss. The algorithm performance is investigated in hypothetical and actual circuits. When applied in an actual distribution system of a region of the State of Sao Paulo (Brazil), the solution found by the algorithm presents loss lower than the topology built by the concessionary company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The distribution of clock signals throughout the nodes of a network is essential for several applications. in control and communication with the phase-locked loop (PLL) being the component for electronic synchronization process. In systems with master-slave (MS) strategies, the PLLs are the slave nodes responsible for providing reliable clocks in all nodes of the network. As PLLs have nonlinear phase detection, double-frequency terms appear and filtering becomes necessary. Imperfections in filtering process cause oscillations around the synchronous state worsening the performance of the clock distribution process. The behavior of one-way master-slave (OWMS) clock distribution networks is studied and performances of first- and second-order filter processes are compared, concerning lock-in ranges and responses to perturbations of the synchronous state. (c) 2007 Elsevier GmbH. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the problem of energy resource scheduling. An aggregator will manage all distributed resources connected to its distribution network, including distributed generation based on renewable energy resources, demand response, storage systems, and electrical gridable vehicles. The use of gridable vehicles will have a significant impact on power systems management, especially in distribution networks. Therefore, the inclusion of vehicles in the optimal scheduling problem will be very important in future network management. The proposed particle swarm optimization approach is compared with a reference methodology based on mixed integer non-linear programming, implemented in GAMS, to evaluate the effectiveness of the proposed methodology. The paper includes a case study that consider a 32 bus distribution network with 66 distributed generators, 32 loads and 50 electric vehicles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Recent Storms in Nordic countries were a reason of long power outages in huge territories. After these disasters distribution networks' operators faced with a problem how to provide adequate quality of supply in such situation. The decision of utilization cable lines rather than overhead lines were made, which brings new features to distribution networks. The main idea of this work is a complex analysis of medium voltage distribution networks with long cable lines. High value of cable’s specific capacitance and length of lines determine such problems as: high values of earth fault currents, excessive amount of reactive power flow from distribution to transmission network, possibility of a high voltage level at the receiving end of cable feeders. However the core tasks was to estimate functional ability of the earth fault protection and the possibility to utilize simplified formulas for operating setting calculations in this network. In order to provide justify solution or evaluation of mentioned above problems corresponding calculations were made and in order to analyze behavior of relay protection principles PSCAD model of the examined network have been created. Evaluation of the voltage rise in the end of a cable line have educed absence of a dangerous increase in a voltage level, while excessive value of reactive power can be a reason of final penalty according to the Finish regulations. It was proved and calculated that for this networks compensation of earth fault currents should be implemented. In PSCAD models of the electrical grid with isolated neutral, central compensation and hybrid compensation were created. For the network with hybrid compensation methodology which allows to select number and rated power of distributed arc suppression coils have been offered. Based on the obtained results from experiments it was determined that in order to guarantee selective and reliable operation of the relay protection should be utilized hybrid compensation with connection of high-ohmic resistor. Directional and admittance based relay protection were tested under these conditions and advantageous of the novel protection were revealed. However, for electrical grids with extensive cabling necessity of a complex approach to the relay protection were explained and illustrated. Thus, in order to organize reliable earth fault protection is recommended to utilize both intermittent and conventional relay protection with operational settings calculated by the use of simplified formulas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increasingly growing share of distributed generation in the whole electrical power system’s generating system is currently a worldwide tendency, driven by several factors, encircling mainly difficulties in refinement of megalopolises’ distribution networks and its maintenance; widening environmental concerns adding to both energy efficiency approaches and installation of renewable sources based generation, inherently distributed; increased power quality and reliability needs; progress in IT field, making implementable harmonization of needs and interests of different-energy-type generators and consumers. At this stage, the volume, formed by system-interconnected distributed generation facilities, have reached the level of causing broad impact toward system operation under emergency and post-emergency conditions in several EU countries, thus previously implementable approach of their preliminary tripping in case of a fault, preventing generating equipment damage and disoperation of relay protection and automation, is not applicable any more. Adding to the preceding, withstand capability and transient electromechanical stability of generating technologies, interconnecting in proximity of load nodes, enhanced significantly since the moment Low Voltage Ride-Through regulations, followed by techniques, were introduced in Grid Codes. Both aspects leads to relay protection and auto-reclosing operation in presence of distributed generation generally connected after grid planning and construction phases. This paper proposes solutions to the emerging need to ensure correct operation of the equipment in question with least possible grid refinements, distinctively for every type of distributed generation technology achieved its technical maturity to date and network’s protection. New generating technologies are equivalented from the perspective of representation in calculation of initial steady-state short-circuit current used to dimension current-sensing relay protection, and widely adopted short-circuit calculation practices, as IEC 60909 and VDE 0102. The phenomenon of unintentional islanding, influencing auto-reclosing, is addressed, and protection schemes used to eliminate an sustained island are listed and characterized by reliability and implementation related factors, whereas also forming a crucial aspect of realization of the proposed protection operation relieving measures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis proposes a framework for identifying the root-cause of a voltage disturbance, as well as, its source location (upstream/downstream) from the monitoring place. The framework works with three-phase voltage and current waveforms collected in radial distribution networks without distributed generation. Real-world and synthetic waveforms are used to test it. The framework involves features that are conceived based on electrical principles, and assuming some hypothesis on the analyzed phenomena. Features considered are based on waveforms and timestamp information. Multivariate analysis of variance and rule induction algorithms are applied to assess the amount of meaningful information explained by each feature, according to the root-cause of the disturbance and its source location. The obtained classification rates show that the proposed framework could be used for automatic diagnosis of voltage disturbances collected in radial distribution networks. Furthermore, the diagnostic results can be subsequently used for supporting power network operation, maintenance and planning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of expert system techniques in power distribution system design is examined. The selection and siting of equipment on overhead line networks is chosen for investigation as the use of equipment such as auto-reclosers, etc., represents a substantial investment and has a significant effect on the reliability of the system. Through past experience with both equipment and network operations, most decisions in selection and siting of this equipment are made intuitively, following certain general guidelines or rules of thumb. This heuristic nature of the problem lends itself to solution using an expert system approach. A prototype has been developed and is currently under evaluation in the industry. Results so far have demonstrated both the feasibility and benefits of the expert system as a design aid.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a method for calculating the power flow in distribution networks considering uncertainties in the distribution system. Active and reactive power are used as uncertain variables and probabilistically modeled through probability distribution functions. Uncertainty about the connection of the users with the different feeders is also considered. A Monte Carlo simulation is used to generate the possible load scenarios of the users. The results of the power flow considering uncertainty are the mean values and standard deviations of the variables of interest (voltages in all nodes, active and reactive power flows, etc.), giving the user valuable information about how the network will behave under uncertainty rather than the traditional fixed values at one point in time. The method is tested using real data from a primary feeder system, and results are presented considering uncertainty in demand and also in the connection. To demonstrate the usefulness of the approach, the results are then used in a probabilistic risk analysis to identify potential problems of undervoltage in distribution systems. (C) 2012 Elsevier Ltd. All rights reserved.