980 resultados para Electric power - Conservation
Resumo:
Hearings held in various cities, Apr. 8-Aug. 25, 1978.
Resumo:
Voltage and current waveforms of a distribution or transmission power system are not pure sinusoids. There are distortions in these waveforms that can be represented as a combination of the fundamental frequency, harmonics and high frequency transients. This paper presents a novel approach to identifying harmonics in power system distorted waveforms. The proposed method is based on Genetic Algorithms, which is an optimization technique inspired by genetics and natural evolution. GOOAL, a specially designed intelligent algorithm for optimization problems, was successfully implemented and tested. Two kinds of representations concerning chromosomes are utilized: binary and real. The results show that the proposed method is more precise than the traditional Fourier Transform, especially considering the real representation of the chromosomes.
Resumo:
In this paper, a comparative analysis of the long-term electric power forecasting methodologies used in some South American countries, is presented. The purpose of this study is to compare and observe if such methodologies have some similarities, and also examine the behavior of the results when they are applied to the Brazilian electric market. The abovementioned power forecasts were performed regarding the main four consumption classes (residential, industrial, commercial and rural) which are responsible for approximately 90% of the national consumption. The tool used in this analysis was the SAS (c) program. The outcome of this study allowed identifying various methodological similarities, mainly those related to the econometric variables used by these methods. This fact strongly conditioned the comparative results obtained.
Resumo:
This paper shows a new hybrid method for risk assessment regarding interruptions in sensitive processes due to faults in electric power distribution systems. This method determines indices related to long duration interruptions and short duration voltage variations (SDVV), such as voltage sags and swells in each customer supplied by the distribution network. Frequency of such occurrences and their impact on customer processes are determined for each bus and classified according to their corresponding magnitude and duration. The method is based on information regarding network configuration, system parameters and protective devices. It randomly generates a number of fault scenarios in order to assess risk areas regarding long duration interruptions and voltage sags and swells in an especially inventive way, including frequency of events according to their magnitude and duration. Based on sensitivity curves, the method determines frequency indices regarding disruption in customer processes that represent equipment malfunction and possible process interruptions due to voltage sags and swells. Such approach allows for the assessment of the annual costs associated with each one of the evaluated power quality indices.
Resumo:
In this paper we present a Constraint Logic Programming (CLP) based model, and hybrid solving method for the Scheduling of Maintenance Activities in the Power Transmission Network. The model distinguishes from others not only because of its completeness but also by the way it models and solves the Electric Constraints. Specifically we present a efficient filtering algorithm for the Electrical Constraints. Furthermore, the solving method improves the pure CLP methods efficiency by integrating a type of Local Search technique with CLP. To test the approach we compare the method results with another method using a 24 bus network, which considerers 42 tasks and 24 maintenance periods.
Resumo:
This study compares different electric propulsion systems. Results of the analysis of all the advantages and disadvantages of the different propulsion systems are given. This thesis estimates possibilities to apply different diesel-electric propulsion concepts for different vessel types. Small and medium size vessel’s power ranges are studied. The optimal delivery system is chosen. This choice is made on the base of detailed study of the concepts, electrical equipment market and comparison of mass, volume and efficiency parameters. In this thesis three marine generators are designed. They are: salient pole synchronous generator and two permanent magnet synchronous generators. Their electrical, dimensional, cost and efficiency parameters are compared. To understand all the benefits diagrams with these parameters are prepared. Possible benefits and money savings are estimated. As the result the advantages, disadvantages and boundary conditions for the permanent magnet synchronous generator application in marine electric-power systems are found out.
Resumo:
The application of VSC-HVDC technology throughout the world has turned out to be an efficient solution regarding a large share of wind power in different power systems. This technology enhances the overall reliability of the grid by utilization of the active and reactive power control schemes which allows to maintain frequency and voltage on busbars of the end-consumers at the required level stated by the network operator. This master’s thesis is focused on the existing and planned wind farms as well as electric power system of the Åland Islands. The goal is to analyze the wind conditions of the islands and appropriately predict a possible production of the existing and planned wind farms with a help of WAsP software program. Further, to investigate the influence of increased wind power it is necessary to develop a simulation model of the electric grid and VSC-HVDC system in PSCAD and examine grid response to different wind power production cases with respect to the grid code requirements and ensure the stability of the power system.
Resumo:
Russia approved ambitious reform plan for the electricity sector in 2001 including privatisation of the country’s huge thermal generation assets. So far the sector had suffered from power shortages, aging infrastructure, substantial electricity losses, and weak productivity and profitability numbers. There was obvious need for foreign investments and technologies. The reform was rather successful; the generation assets were privatised in auctions in 2007-2008 and three European energy companies, E.On, Enel and Fortum, invested in and obtained together over 10% of the Russian production assets. The novelty of these foreign investments serves unique object for the study. The political risk is involved in the FDI due to the industry’s social and economic importance. The research’s objective was to identify and analyse the political risk that foreign investors face in the Russian electricity sector. The research had qualitative study method and the empirical data was collected by interviewing. The research’s theoretical framework was based on the existing political risk theories and it focused to understand the Russian government in relation to the country’s stability and define both macro-level and micro-level sources of political risk for the foreign direct investments in the sector. The research concludes that the centralised and obscure political decision-making, economic constriction, high level of governmental control in economy and corruption form the country’s internal macro-level risk sources for the foreign investors in the sector. Additionally the retribution due to the companies’ home country actions, possible violent confrontations at the Russian borders and the currency instability are externally originated risk sources. In the electricity industry there is risk of tightened governmental control and increased regulation and taxation. Similarly the company-level risk sources link to the unreformed heating sector, bargaining with the authorities, diplomatic stress between host and home countries and to companies and government’s divergent perspective for the profit-making. The research stresses the foreign companies’ ability to cope with the characteristics of Russian political environment. In addition to frequent political and market risk assessment, the companies need to focus on currency protection against rouble’s rate fluctuation and actively build good company-citizenship in the country. Good relationship is needed with the Russian political authorities. The political risk identification and the research’s conclusive framework also enable political risk study assessments for other industries in Russia
Resumo:
The Public Ownership League of America Conference, September 10th to 13th, 1923, at Toronto, Ontario.
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2008/1010/thumbnail.jpg
Resumo:
The distribution of natural gas is carried out by means of long ducts and intermediate compression stations to compensate the pressure drops due to friction. The natural gas compressors are usually driven by an electric motor or a gas turbine system, offering possibilities for energy management, one of these consisting in generating energy for use in-plant or to commercialize as independent power producer. It can be done by matching the natural gas demand, at the minimum pressure allowed in the reception point, and the storage capacity of the feed duct with the maximum compressor capacity, for storing the natural gas at the maximum permitted pressure. This allows the gas turbine to drive an electric generator during the time in which the decreasing pressure in duct is above the minimum acceptable by the sink unit. In this paper, a line-pack management analysis is done for an existing compression station considering its actual demand curve for determining the economic feasibility of maintaining the gas turbine system driver generating electricity in a peak and off-peak tariff structure. The potential of cost reduction from the point of view of energy resources (natural gas and electric costs) is also analyzed. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
This work presents a methodology to analyze electric power systems transient stability for first swing using a neural network based on adaptive resonance theory (ART) architecture, called Euclidean ARTMAP neural network. The ART architectures present plasticity and stability characteristics, which are very important for the training and to execute the analysis in a fast way. The Euclidean ARTMAP version provides more accurate and faster solutions, when compared to the fuzzy ARTMAP configuration. Three steps are necessary for the network working, training, analysis and continuous training. The training step requires much effort (processing) while the analysis is effectuated almost without computational effort. The proposed network allows approaching several topologies of the electric system at the same time; therefore it is an alternative for real time transient stability of electric power systems. To illustrate the proposed neural network an application is presented for a multi-machine electric power systems composed of 10 synchronous machines, 45 buses and 73 transmission lines. (C) 2010 Elsevier B.V. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
This paper proposes a methodology to achieve integrated planning and projects for secondary distribution circuits. The planning model is formulated as a mixed integer nonlinear programming problem (MINLP). In order to resolve this problem, a tabu search (TS) algorithm is used, with a neighborhood structure developed to explore the physical characteristics of specific geographies included in the planning and expansion of secondary networks, thus obtaining effective solutions as well as low operating costs and investments. The project stage of secondary circuits consists of calculating the mechanical efforts to determine the support structures of the primary and secondary distribution systems and determining the types of structures that should be used in the system according to topological and electrical parameters of the network and, therefore, accurately assessing the costs involved in the construction and/or reform of secondary systems. A constructive heuristic based on information of the electrical and topological conditions between the medium voltage and low voltage systems is used to connect the primary systems and secondary circuits. The results obtained from planning and design simulations of a real secondary system of electric energy distribution are presented.