954 resultados para Electric cranes
Resumo:
Mode of access: Internet.
Resumo:
"Credit is largely due to Frank D. Graham ... for the authorship of the Guides, and for the original sketches illustrating electrical principles and construction."--Pref. to no. 1.
Resumo:
Preliminary considerations.--Single, web, box and beam girders.--Braced girders.--End carriages, wheels, axles and bearings.--Appendix: Approximate formulas for beams and crane girders, by C. R. Whittier.
Resumo:
Birds are vulnerable to collisions with human-made fixed structures. Despite ongoing development and increases in infrastructure, we have few estimates of the magnitude of collision mortality. We reviewed the existing literature on avian mortality associated with transmission lines and derived an initial estimate for Canada. Estimating mortality from collisions with power lines is challenging due to the lack of studies, especially from sites within Canada, and due to uncertainty about the magnitude of detection biases. Detection of bird collisions with transmission lines varies due to habitat type, species size, and scavenging rates. In addition, birds can be crippled by the impact and subsequently die, although crippling rates are poorly known and rarely incorporated into estimates. We used existing data to derive a range of estimates of avian mortality associated with collisions with transmission lines in Canada by incorporating detection, scavenging, and crippling biases. There are 231,966 km of transmission lines across Canada, mostly in the boreal forest. Mortality estimates ranged from 1 million to 229.5 million birds per year, depending on the bias corrections applied. We consider our most realistic estimate, taking into account variation in risk across Canada, to range from 2.5 million to 25.6 million birds killed per year. Data from multiple studies across Canada and the northern U.S. indicate that the most vulnerable bird groups are (1) waterfowl, (2) grebes, (3) shorebirds, and (4) cranes, which is consistent with other studies. Populations of several groups that are vulnerable to collisions are increasing across Canada (e.g., waterfowl, raptors), which suggests that collision mortality, at current levels, is not limiting population growth. However, there may be impacts on other declining species, such as shorebirds and some species at risk, including Alberta’s Trumpeter Swans (Cygnus buccinator) and western Canada’s endangered Whooping Cranes (Grus americana). Collisions may be more common during migration, which underscores the need to understand impacts across the annual cycle. We emphasize that these estimates are preliminary, especially considering the absence of Canadian studies.
Resumo:
Hypercapitalism, with its "knowledge economy", is the form of capitalism under which thought itself is produced, commodified, and exchanged within the globally integrated system of communication technologies. As such, hypercapitalism may be seen as not so much a revolution, but rather an evolution: the progressively thorough, inexorable totalisation of social relations by Capital. The study on which this paper is based synthesises the sociological perspectives of Marx (1970, 1844/1975, 1846/1972, 1976, 1978, 1981) and Adorno (1951/1974, 1991; Horkheimer & Adorno, 1944/1998), and the Critical Discourse perspectives of Fairclough (1989, 1992) and Lemke (1995) to argue that alienated thought and language are the fundamental, irreducible commodity-forms of Cybersociety’s knowledge economy.
Resumo:
This paper describes the use of the Chimera Architecture as the basis for a generative rhythmic improvisation system that is intended for use in ensemble contexts. This interactive soft- ware system learns in real time based on an audio input from live performers. The paper describes the components of the Chimera Architecture including a novel analysis engine that uses prediction to robustly assess the rhythmic salience of the input stream. Analytical results are stored in a hierarchical structure that includes multiple scenarios which allow ab- stracted and alternate interpretations of the current metrical context. The system draws upon this Chimera Architecture when generating a musical response. The generated rhythms are intended to have a particular ambiguity in relation to the music performance by other members of the ensemble. Ambi- guity is controlled through alternate interpretations of the Chimera. We describe an implementation of the Chimera Ar- chitecture that focuses on rhythmic material, and present and discuss initial experimental results of the software system playing along with recordings of a live performance.
Resumo:
Current-voltage (I-V) curves of Poly(3-hexyl-thiophene) (P3HT) diodes have been collected to investigate the polymer hole-dominated charge transport. At room temperature and at low electric fields the I-V characteristic is purely Ohmic whereas at medium-high electric fields, experimental data shows that the hole transport is Trap Dominated - Space Charge Limited Current (TD-SCLC). In this regime, it is possible to extract the I-V characteristic of the P3HT/Al junction showing the ideal Schottky diode behaviour over five orders of magnitude. At high-applied electric fields, holes’ transport is found to be in the trap free SCLC regime. We have measured and modelled in this regime the holes’ mobility to evaluate its dependence from the electric field applied and the temperature of the device.
Resumo:
The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia.
Resumo:
The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia
Resumo:
This paper demonstrates the application of the reliability-centred maintenance (RCM) process to analyse and develop preventive maintenance tasks for electric multiple units (EMU) in the East Rail of the Kowloon-Canton Railway Corporation (KCRC). Two systems, the 25 kV electrical power supply and the air-conditioning system of the EMU, have been chosen for the study. RCM approach on the two systems is delineated step by step in the paper. This study confirms the feasibility and effectiveness of RCM applications on the maintenance of electric trains.
Resumo:
In larger developments there is potential for construction cranes to encroach into the airspace of neighbouring properties. To resolve issues of this nature, a statutory right of user may be sought under s 180 of the Property Law Act 1974 (Qld). Section 180 allows the court to impose a statutory right of user on servient land where it is reasonably necessary in the interests of effective use in any reasonable manner of the dominant land. Such an order will not be made unless the court is satisfied that it is consistent with public interest, the owner of the servient land can be adequately recompensed for any loss or disadvantage which may be suffered from the imposition and the owner of the servient land has refused unreasonably to agree to accept the imposition of that obligation. In applying the statutory provision, a key practical concern for legal advisers will be the basis for assessment of compensation. A recent decision of the Queensland Supreme Court (Douglas J) provides guidance concerning matters relevant to this assessment. The decision is Lang Parade Pty Ltd v Peluso [2005] QSC 112.