951 resultados para Electric Transformers
Resumo:
"DOE/EV-0095."
Resumo:
The performance of the three-phase core type transformers, under AC/DC double excitation is discussed in this work. It is presented a mathematical model that considers the mutual coupling between phases and the magnetic nonlinearity. The validity of the proposed model is verified by means of the experimental and simulated results.
Resumo:
In this work it is discussed the performance of the reactive power demand in three-leg transformer core and three-phase transformer bank, under different conditions of AC/DC double excitation. In order to analyse the influence of double excitation in reactive power theoretically a mathematical model was developed considering the mutual coupling between phases and the magnetic nonlinearity. The validity of the proposed model is verified by means of the experimental and simulated results.
Resumo:
"...Final report ... sponsored by Signal Corps Engineering Laboratories, Fort Monmouth, N.J., and the Electronic Components Laboratory of the Wright Air Development Center, Wright-Patterson Air Force Base, Ohio."
Resumo:
"A publication of the Technology Press, Massachusetts Institute of Technology."
Resumo:
En aquest projecte d’electrificació del polígon industrial de Palafrugell s'ha realitzat un disseny complet de tots els aspectes determinants des de l’arribada de la línia d’alta tensió, les ramificacions de baixa tensió, càlcul d’enllumenat, postes a terra, centres de transformació amb els seus respectius transformadors, i per últim un estudi i orientació sobre tarificacions a indústries. De cada apartat s'ha realitzat tota la sèrie de càlculs necessaris per determinar els components i aparellatge dimensionat per les necessitats
Resumo:
This work presents a new high power factor three-phase rectifier based on a Y-connected differential autotransformer with reduced kVA and 18-pulse input current followed by three DC-DC boost converters. The topology provides a regulated output voltage and natural three-phase input power factor correction. The lowest input current harmonic components are the 17th and the 19th. Three boost converters, with constant input currents and regulated parallel connected output voltages are used to process 4kW each one. Analytical results from Fourier analyses of winding currents and the vector diagram of winding voltages are presented. Simulation results to verify the proposed concept and experimental results are shown in the paper.
Resumo:
A combined methodology consisting of successive linear programming (SLP) and a simple genetic algorithm (SGA) solves the reactive planning problem. The problem is divided into operating and planning subproblems; the operating subproblem, which is a nonlinear, ill-conditioned and nonconvex problem, consists of determining the voltage control and the adjustment of reactive sources. The planning subproblem consists of obtaining the optimal reactive source expansion considering operational, economical and physical characteristics of the system. SLP solves the optimal reactive dispatch problem related to real variables, while SGA is used to determine the necessary adjustments of both the binary and discrete variables existing in the modelling problem. Once the set of candidate busbars has been defined, the program implemented gives the location and size of the reactive sources needed, if any, to maintain the operating and security constraints.
Resumo:
A novel hybrid high power rectifier capable to achieve unity power factor is proposed in this paper. Single-phase SEPIC rectifiers are associated in parallel with each leg of three-phase 6-pulse diode rectifier resulting in a programmable input current waveform structure. In this paper it is described the principles of operation of the proposed converter with detailed simulation and experimental results. For a total harmonic distortion of the input line current (THDI) less than 2% the rated power of the SEPIC rectifiers is 33%. Therefore, power rating of the SEPIC parallel converters is a fraction of the output power, on the range of 20% to 33% of the nominal output power, making the proposed solution economically viable for high power installations, with fast pay back of the investment. Moreover, retrofits to existing installations are also possible with this proposed topology, since the parallel path can be easily controlled by integration with the already existing de-link. Experimental results are presented for a 3 kW implemented prototype, in order to verify the developed analysis.
Resumo:
In this paper a method for solving the Short Term Transmission Network Expansion Planning (STTNEP) problem is presented. The STTNEP is a very complex mixed integer nonlinear programming problem that presents a combinatorial explosion in the search space. In this work we present a constructive heuristic algorithm to find a solution of the STTNEP of excellent quality. In each step of the algorithm a sensitivity index is used to add a circuit (transmission line or transformer) to the system. This sensitivity index is obtained solving the STTNEP problem considering as a continuous variable the number of circuits to be added (relaxed problem). The relaxed problem is a large and complex nonlinear programming and was solved through an interior points method that uses a combination of the multiple predictor corrector and multiple centrality corrections methods, both belonging to the family of higher order interior points method (HOIPM). Tests were carried out using a modified Carver system and the results presented show the good performance of both the constructive heuristic algorithm to solve the STTNEP problem and the HOIPM used in each step.
Resumo:
The Predispatch model (PD) calculates a short-term generation policy for power systems. In this work a PD model is proposed that improves two modeling aspects generally neglected in the literature: voltage/reactive power constraints and ramp rate constraints for generating units. Reactive power constraints turn the PD into a non-linear problem and the ramp rate constraints couple the problem dynamically in time domain. The solution of the PD is turned into a harder task when such constraints are introduced. The dual decomposition/ lagrangian relaxation technique is used in the solution approach for handing dynamic constraints. As a result the PD is decomposed into a series of independent Optimal Power Flow (FPO) sub problems, in which the reactive power is represented in detail. The solution of the independent FPO is coordinated by means of Lagrange multipliers, so that dynamic constraints are iteratively satisfied. Comparisons between dispatch policies calculated with and without the representation of ramp rate constraints are performed, using the IEEE 30 bus test system. The results point-out the importance of representing such constraints in the generation dispatch policy. © 2004 IEEE.
Resumo:
In this work, the planning of secondary distribution circuits is approached as a mixed integer nonlinear programming problem (MINLP). In order to solve this problem, a dedicated evolutionary algorithm (EA) is proposed. This algorithm uses a codification scheme, genetic operators, and control parameters, projected and managed to consider the specific characteristics of the secondary network planning. The codification scheme maps the possible solutions that satisfy the requirements in order to obtain an effective and low-cost projected system-the conductors' adequate dimensioning, load balancing among phases, and the transformer placed at the center of the secondary system loads. An effective algorithm for three-phase power flow is used as an auxiliary methodology of the EA for the calculation of the fitness function proposed for solutions of each topology. Results for two secondary distribution circuits are presented, whereas one presents radial topology and the other a weakly meshed topology. © 2005 IEEE.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The intended purpose of this paper is to present the main commissioning tests for power transformers and the most used techniques in industrial segment, it is also discussed your results and consequences in the equipment’s normal operation. Also in this text, it is given specific information concerning a maintenance plan compatible to power transformers, with elements of preventive and predictive maintenance, exposing essential components, tests and the regulations current, showing how analyze and interpreted the results from this maintenance resources. Also in this paper is submitted the economic impact of damage to transformers and how the correct maintenance method can minimize them. The objective of this text is demonstrate the importance of the equipment and the benefits of proper maintenance, much of in financial terms as in electric system reliability