4 resultados para ESKOM


Relevância:

10.00% 10.00%

Publicador:

Resumo:

South Africa has an electrical transmission grid of over 25 000 km of overhead power lines with voltages of 132 kV to 765 kV. The grid has been largely designed and built by the power utility, Eskom. This book embodies the planning philosophies, design principles and construction practices of Eskom. It is the culmination of decades of thought, study, research and the practical experience of many overhead power line engineers and researchers. The book covers the main aspects of overhead power line design and construction, from electrical first principles, system planning, insulation co-ordination (including live line working), mechanical design through to environmental impact management and power line communications. The content emphasises the need for close interaction between all technical disciplines involved and the importance of optimising designs for economy and performance. Additional challenges in South Africa are the relatively high altitude of the interior plateau (1 000 m to 1 700 m above sea level), severe lightning in some areas and long transmission distances. The book explains how these factors are accommodated in modern designs. Other advanced work covered includes the use and understanding of polymeric insulators, the judicious reduction of phase-to-phase spacings and the adoption of guyed structures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Botswana has a basic need to explore its energy concept, this being its energy sources, generation and percentage of the population with access to electricity. At present, Botswana generates electricity from coal, which supplies about 29% (on average) of the country’s demand. The other 71% is imported mainly from South Africa (Eskom). Consequently, the dependence of Botswana on imports posses threats to the security of its energy supply. As a result, there is the need to understand the bases for a possible generation expansion that would substantiate existing documentation. In view of this need, this study investigates the existing energy sources as well as energy consumption and production levels in Botswana. The study would be further developed by making projections of the energy demand up until the year 2020. The key techniques that were used include; literature review, questionnaire survey and an empirical study. The results presented indicated that, current dependable operation capacity (i.e. 100MW) should be increased to 2,595 MW or more assuming 85% plant efficiency. This would then be able to meet the growing demand for energy use. In addition, the installed capacity would be able to support commercial and mining activities for the growth of the economy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

G. W. Plechanow

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research investigates technology transfer (TT) to developing countries, with specific reference to South Africa. Particular attention is paid to physical asset management, which includes the maintenance of plant, equipment and facilities. The research is case based, comprising a main case study (the South African electricity utility, Eskom) and four mini-cases. A five level framework adapted from Salami and Reavill (1997) is used as the methodological basis for the formulation of the research questions. This deals with technology selection, and management issues including implementation and maintenance and evaluation and modifications. The findings suggest the Salami and Reavill (1997) framework is a useful guide for TT. The case organisations did not introduce technology for strategic advantage, but to achieve operational efficiencies through cost reduction, higher quality and the ability to meet customer demand. Acquirers favour standardised technologies with which they are familiar. Cost-benefit evaluations have limited use in technology acquisition decisions. Users rely on supplier expertise to compensate for poor education and technical training in South Africa. The impact of political and economic factors is more evident in Eskom than in the mini-cases. Physical asset management follows traditional preventive maintenance practices, with limited use of new maintenance management thinking. Few modifications of the technology or R&D innovations take place. Little use is made of explicit knowledge from computerised maintenance management systems. Low operating and maintenance skills are not conducive to the transfer of high-technology equipment. South African organisations acquire technology as items of plant, equipment and systems, but limited transfer of technology takes place. This suggests that operators and maintainers frequently do not understand the underlying technology, and like workers elsewhere, are not always inclined towards adopting technology in the workplace.