137 resultados para EDF


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper considers a firm real-time M/M/1 system, where jobs have stochastic deadlines till the end of service. A method for approximately specifying the loss ratio of the earliest-deadline-first scheduling policy along with exit control through the early discarding technique is presented. This approximation uses the arrival rate and the mean relative deadline, normalized with respect to the mean service time, for exponential and uniform distributions of relative deadlines. Simulations show that the maximum approximation error is less than 4% and 2% for the two distributions, respectively, for a wide range of arrival rates and mean relative deadlines. (C) 2013 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Submitted by zhangdi (zhangdi@red.semi.ac.cn) on 2009-04-13T11:45:31Z

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report examines the financial position of EDF and Areva and analyses what the impact of their nuclear ambitions will be on this.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Embedded real-time systems often have to support the embedding system in very different and changing application scenarios. An aircraft taxiing, taking off and in cruise flight is one example. The different application scenarios are reflected in the software structure with a changing task set and thus different operational modes. At the same time there is a strong push for integrating previously isolated functionalities in single-chip multicore processors. On such multicores the behavior of the system during a mode change, when the systems transitions from one mode to another, is complex but crucial to get right. In the past we have investigated mode change in multiprocessor systems where a mode change requires a complete change of task set. Now, we present the first analysis which considers mode changes in multicore systems, which use global EDF to schedule a set of mode independent (MI) and mode specific (MS) tasks. In such systems, only the set of MS tasks has to be replaced during mode changes, without jeopardizing the schedulability of the MI tasks. Of prime concern is that the mode change is safe and efficient: i.e. the mode change needs to be performed in a predefined time window and no deadlines may be missed as a function of the mode change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consider the problem of scheduling sporadically-arriving tasks with implicit deadlines using Earliest-Deadline-First (EDF) on a single processor. The system may undergo changes in its operational modes and therefore the characteristics of the task set may change at run-time. We consider a well-established previously published mode-change protocol and we show that if every mode utilizes at most 50% of the processing capacity then all deadlines are met. We also show that there exists a task set that misses a deadline although the utilization exceeds 50% by just an arbitrarily small amount. Finally, we present, for a relevant special case, an exact schedulability test for EDF with mode change.