994 resultados para Dulles International Airport (Va.)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Based on the fall 1994 "Working Conference on School-linked Comprehensive Services for Children and Families: What We Know and What We Need to Know" held near Dulles Airport, outside of Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"March, 1991."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hearings held before the House Subcommittee on Transportation and Aeronautics July 18-19, 1961 and May 2-4, 1962.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

- Atlanta Facts - Airport Overview - Market Overview - Sucess Factors - Aviation Forecasts - Ten-Year Vision

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Looking Beyond 2010 - Western Precinct will most likely reach saturation before 2015 - This implies some Midfield developments to commence even before 2010 - Update Updated traffic forecast (2010 as well as beyond) Saturation of West Precinct Trigger points of midfield developments Cargo

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dubai International Airport... a historical voyage - Opened on September 30, 1960 - 1,800 meters of compacted runway - Capacity to handle aircraft the size up to DC-3 - Handled 10,000 passengers and 772 scheduled flights

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bird-aircraft strikes at the Atlantic City International Airport (ACY) increased from 18 in 1989 to 37 in 1990. The number of bird-aircraft strikes involving gulls (Larus spp.) during this time rose from 6 to 27, a 350% increase. The predominant species involved in bird strikes was the laughing gull (L. atricilla). Pursuant to an interagency agreement between the U.S. Department of Transportation (USDOT), Federal Aviation Administration (FAA) and the U.S. Department of Agriculture (USDA)l Animal and Plant Health Inspection Service (APHIS)/Animal Damage Control (ADC), ADC established a Emergency/Experimental Bird Hazard Reduction Force (BHFF) at ACY in 1991. An Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the 1991 Emergency/Experimental BHRF was executed and signed by the FAA on 19 May 1991. The BHRF was adopted at this time by the FAA Technical Center as an annual program to reduce bird strikes at ACY. The BHRF goals are to minimize or eliminate the incidence of bird-aircraft strikes and runway closures due to increased bird activities. A BHRF team consisting of ADC personnel patrolled ACY for 95 days from 26 May until 28 August 1992, for a total of 2,949 person-hours. The BHRF used a combination of pyrotechnics, amplified gull distress tapes and live ammunition to harass gulls away from the airport from dawn to dusk. Gullaircraft strikes were reduced during BHRF operations in 1992 by 86% compared to gull strikes during summer months of 1990 when there was not a BHRF team. Runway closures due to bird activity decreased 100% compared to 1990 and 1991 closures. The BHRF should continue at ACY as long as birds are a threat to human safety and aircraft operations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Vancouver International Airport (YVR) is the second busiest airport in Canada. YVR is located on Sea Island in the Fraser River Estuary - a world-class wintering and staging area for hundreds of thousands of migratory birds. The Fraser Delta supports Canada’s largest wintering populations of waterfowl, shorebirds, and raptors. The large number of aircraft movements and the presence of many birds near YVR pose a wide range of considerable aviation safety hazards. Until the late 1980s when a full-time Wildlife Control Program (WCP) was initiated, YVR had the highest number of bird strikes of any Canadian commercial airport. Although the risks of bird strikes associated with the operation of YVR are generally well known by airport managers, and a number of risk assessments have been conducted associated with the Sea Island Conservation Area, no quantitative assessment of risks of bird strikes has been conducted for airport operations at YVR. Because the goal of all airports is to operate safely, an airport wildlife management program strives to reduce the risk of bird strikes. A risk assessment establishes the current risk of strikes, which can be used as a benchmark to focus wildlife control activities and to assess the effectiveness of the program in reducing bird strike risks. A quantitative risk assessment also documents the process and information used in assessing risk and allows the assessment to be repeated in the future in order to measure the change in risk over time in an objective and comparative manner. This study was undertaken to comply with new Canadian legislation expected to take effect in 2006 requiring airports in Canada to conduct a risk assessment and develop a wildlife management plan. Although YVR has had a management plan for many years, it took this opportunity to update the plan and conduct a risk assessment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Ground Delay Programs (GDP) are sometimes cancelled before their initial planned duration and for this reason aircraft are delayed when it is no longer needed. Recovering this delay usually leads to extra fuel consumption, since the aircraft will typically depart after having absorbed on ground their assigned delay and, therefore, they will need to cruise at more fuel consuming speeds. Past research has proposed speed reduction strategy aiming at splitting the GDP-assigned delay between ground and airborne delay, while using the same fuel as in nominal conditions. Being airborne earlier, an aircraft can speed up to nominal cruise speed and recover part of the GDP delay without incurring extra fuel consumption if the GDP is cancelled earlier than planned. In this paper, all GDP initiatives that occurred in San Francisco International Airport during 2006 are studied and characterised by a K-means algorithm into three different clusters. The centroids for these three clusters have been used to simulate three different GDPs at the airport by using a realistic set of inbound traffic and the Future Air Traffic Management Concepts Evaluation Tool (FACET). The amount of delay that can be recovered using this cruise speed reduction technique, as a function of the GDP cancellation time, has been computed and compared with the delay recovered with the current concept of operations. Simulations have been conducted in calm wind situation and without considering a radius of exemption. Results indicate that when aircraft depart early and fly at the slower speed they can recover additional delays, compared to current operations where all delays are absorbed prior to take-off, in the event the GDP cancels early. There is a variability of extra delay recovered, being more significant, in relative terms, for those GDPs with a relatively low amount of demand exceeding the airport capacity.