Photosynthetic state transitions were investigated in the cyanobacterium Synechococcus sp. PCC 6301 by studying fluorescence emission, heat loss, and PS I activity in intact cells brought to state 1 and state 2. 77K fluorescence emission spectra were modelled with a sum of 6 components corresponding to PBS, PS II, and PS I emissions. The modelled data showed a large decrease in PS II fluorescence accompanied with a small increase in the PS I fluorescence upon transition to state 2 for excitation wavelengths absorbed by both PBS and ChI ll.. The fluorescence changes seen with ChI .a. excitations do not support the predictions of the mobile PBS model of state transition in PBS-containing organisms. Measurements of heat loss from intact cells in the two states were similar for both ChI it. and PBS excitations over three orders of magnitude of laser flash intensity. This suggests that the PBS does not become decoupled from PS II in state 2 as proposed by the PBS detachment model of state transition in PBS-containing organisms. PS I activity measurements done on intact cells showed no difference in the two states, in contrast with the predictions of all of the existing models of state transitions. Based on these results a model for state transition In PBScontaining organisms is proposed, with a PS II photoprotectory function.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, the network vulnerability to natural hazards has been noticed. Moreover, operating on the limits of the network transmission capabilities have resulted in major outages during the past decade. One of the reasons for operating on these limits is that the network has become outdated. Therefore, new technical solutions are studied that could provide more reliable and more energy efficient power distributionand also a better profitability for the network owner. It is the development and price of power electronics that have made the DC distribution an attractive alternative again. In this doctoral thesis, one type of a low-voltage DC distribution system is investigated. Morespecifically, it is studied which current technological solutions, used at the customer-end, could provide better power quality for the customer when compared with the current system. To study the effect of a DC network on the customer-end power quality, a bipolar DC network model is derived. The model can also be used to identify the supply parameters when the V/kW ratio is approximately known. Although the model provides knowledge of the average behavior, it is shown that the instantaneous DC voltage ripple should be limited. The guidelines to choose an appropriate capacitance value for the capacitor located at the input DC terminals of the customer-end are given. Also the structure of the customer-end is considered. A comparison between the most common solutions is made based on their cost, energy efficiency, and reliability. In the comparison, special attention is paid to the passive filtering solutions since the filter is considered a crucial element when the lifetime expenses are determined. It is found out that the filter topology most commonly used today, namely the LC filter, does not provide economical advantage over the hybrid filter structure. Finally, some of the typical control system solutions are introduced and their shortcomings are presented. As a solution to the customer-end voltage regulation problem, an observer-based control scheme is proposed. It is shown how different control system structures affect the performance. The performance meeting the requirements is achieved by using only one output measurement, when operating in a rigid network. Similar performance can be achieved in a weak grid by DC voltage measurement. An additional improvement can be achieved when an adaptive gain scheduling-based control is introduced. As a conclusion, the final power quality is determined by a sum of various factors, and the thesis provides the guidelines for designing the system that improves the power quality experienced by the customer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Intelligent electrical grids can be considered as the next generation of electrical energy transportation. The enormous potential leads to worldwide focus of research on the technology of smart grids. This paper aims to present a review of the Brazilian electricity sector in context with the integration of communication technologies for smart grids. The work gives an overview of the generation, transmission and distribution of electrical energy in the Brazil and a brief summary of the current electricity market. Smart grid technologies are introduced and the requirements for the Brazilian power system are pointed out. Various technologies for communication within an intelligent network are presented and their characteristics, advantages and disadvantages are compared to the Brazilian conditions. In addition, a summary is given of current pilot projects for Smart Grid technologies within Brazil, as well as a presentation of individual selected projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study proposes the development of thermal and energy consumption maps to generate useful planning information. A residential neighbourhood in a medium-sized city was selected as the study area. In this area, 40 points were taken as urban reference points where air temperatures at the pedestrian level were collected. At the same time, rural temperatures made available by the city meteorological station were registered. Data of electrical energy consumption of the building units (houses and apartments) were collected through a household survey that was also designed to identify the users' income levels. Then, maps were developed so that the configuration of urban heat islands and electrical energy consumption could be visualised, compared and analysed. The results showed that the income level was the most important variable influencing electrical energy consumption. However, a strong relationship of the consumption with the thermal environment was also observed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents results derived from a study related to impact on non-controllable costs in the determination of energy taxes. This is done analyzing tax review practiced by concessionaries responsible for the distribution of electrical energy located in the Northeastern Region of Brazil, between 2003 and 2004. This Region was chosen as a study area due to the researcher s expectation in congregating companies that deliver services to markets that have similar social-economical profiles. A brief explanation related to the restructuring of the electrical sector in Brazil is presented, pointing out that there was privatization of the great majority of these companies. The study also points out the definition of regulating rules in service delivery process. The components of taxes that are practiced by these companies aimed at final consumers, as well as the market as a whole and the revision process that is executed by Agência Nacional de Energia Elétrica ANEEL for the definition of these taxes are demonstrated in the research. A brief historical of the concessionaires that were focus of the research is presented, totaling five companies. Some data used by ANEEL in the tax review process was analyzed as well as data on components of approved taxes. It is concluded that as a media 47, 49% of the components of taxes in the researched companies correspond to the non-controllable costs. These is done considering previous classification by ANEEL in the tax review process. Although, if it is considered that these companies since 2006, by the means of participation in energy auctions are able to negotiate energy prices for their own needs, it is concluded that these concession contracts guarantee the delivery of the service to the costumer in the total tribute. The percentage of non-controllable costs is 16, 27% average of the tax. This means, amongst other information, that the government has a great deal of responsibility in the formation of price practiced by these companies and its target markets

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El proyecto tiene como objeto analizar desde el punto de vista técnico-económico las posibilidades para mejorar el factor de potencia en los consumos auxiliares de la Central térmica Litoral, perteneciente a Endesa Generación. Debido a un cambio normativo, las tarifas de acceso a las redes de transporte y distribución de energía eléctrica aplicarán ahora también a los consumos propios de las empresas productoras de electricidad dentro del ámbito de aplicación de las tarifas de acceso. Como la energía reactiva se facturará en función del factor de potencia se propone para su compensación la instalación de bancos de condensadores para mejorar el mismo y disminuir la penalización. Para el dimensionamiento de los bancos se han utilizado los consumos horarios de los años 2012 y 2013 de tres fronteras: grupos 1 y 2 de 400 kV y los transformadores auxiliares de arranque (OTAAs) de 6 kV , teniendo en cuenta las peculiaridades de una Central de Generación, ya que sólo serán objeto de estudio (a efecto de penalizaciones) las horas en las que el grupo está parado o arrancando. El resultado final muestra la diferencia en cuanto a los periodos de amortización de una instalación con generación y sin generación, siendo esta última más rentable económicamente. ABSTRACT The goal of this project is to analyse the possibilities to better the power factor in the auxiliary consumption of the Thermal Plant Litoral from an economic and technical viewpoint. Due to a normative changes, the access price rates for the transportation and distribution of electrical energy, will also apply now to the electricity productive companies own consumption within the scope of the access rate. Since reactive power is invoiced based on the potency factor, we propose the installation of capacitor banks to improve the aforementioned power factor as compensation so as to reduce sanctions. We have used the time profiles from 2012 and 2013 to dimension the banks, using 3 borders: Group 1 and 2 (400 kV) and the auxiliary starter transformers (OTAA's) of 6kV, taking into account the special characteristics of a Generation Plant , since we will only study the hours that the group was shut down or powering up (since these are what the penalties cover). The final result shows the difference in regards to repayment periods for both generating and nongenerating installation, being the aforesaid the most economically worthwile of the two

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An algorithm inspired on ant behavior is developed in order to find out the topology of an electric energy distribution network with minimum power loss. The algorithm performance is investigated in hypothetical and actual circuits. When applied in an actual distribution system of a region of the State of Sao Paulo (Brazil), the solution found by the algorithm presents loss lower than the topology built by the concessionary company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As low carbon technologies become more pervasive, distribution network operators are looking to support the expected changes in the demands on the low voltage networks through the smarter control of storage devices. Accurate forecasts of demand at the single household-level, or of small aggregations of households, can improve the peak demand reduction brought about through such devices by helping to plan the appropriate charging and discharging cycles. However, before such methods can be developed, validation measures are required which can assess the accuracy and usefulness of forecasts of volatile and noisy household-level demand. In this paper we introduce a new forecast verification error measure that reduces the so called “double penalty” effect, incurred by forecasts whose features are displaced in space or time, compared to traditional point-wise metrics, such as Mean Absolute Error and p-norms in general. The measure that we propose is based on finding a restricted permutation of the original forecast that minimises the point wise error, according to a given metric. We illustrate the advantages of our error measure using half-hourly domestic household electrical energy usage data recorded by smart meters and discuss the effect of the permutation restriction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to present the application of a three-phase harmonic propagation analysis time-domain tool, using the Norton model to approach the modeling of non-linear loads, making the harmonics currents flow more appropriate to the operation analysis and to the influence of mitigation elements analysis. This software makes it possible to obtain results closer to the real distribution network, considering voltages unbalances, currents imbalances and the application of mitigation elements for harmonic distortions. In this scenario, a real case study with network data and equipments connected to the network will be presented, as well as the modeling of non-linear loads based on real data obtained from some PCCs (Points of Common Coupling) of interests for a distribution company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Two of the indicators of the UN Millennium Development Goals ensuring environmental sustainability are energy use and per capita carbon dioxide emissions. The increasing urbanization and increasing world population may require increased energy use in order to transport enough safe drinking water to communities. In addition, the increase in water use would result in increased energy consumption, thereby resulting in increased green-house gas emissions that promote global climate change. The study of multiple Municipal Drinking Water Distribution Systems (MDWDSs) that relates various MDWDS aspects--system components and properties--to energy use is strongly desirable. The understanding of the relationship between system aspects and energy use aids in energy-efficient design. In this study, components of a MDWDS, and/or the characteristics associated with the component are termed as MDWDS aspects (hereafter--system aspects). There are many aspects of MDWDSs that affect the energy usage. Three system aspects (1) system-wide water demand, (2) storage tank parameters, and (3) pumping stations were analyzed in this study. The study involved seven MDWDSs to understand the relationship between the above-mentioned system aspects in relation with energy use. A MDWDSs model, EPANET 2.0, was utilized to analyze the seven systems. Six of the systems were real and one was a hypothetical system. The study presented here is unique in its statistical approach using seven municipal water distribution systems. The first system aspect studied was system-wide water demand. The analysis involved analyzing seven systems for the variation of water demand and its impact on energy use. To quantify the effects of water use reduction on energy use in a municipal water distribution system, the seven systems were modeled and the energy usage quantified for various amounts of water conservation. It was found that the effect of water conservation on energy use was linear for all seven systems and that all the average values of all the systems' energy use plotted on the same line with a high R 2 value. From this relationship, it can be ascertained that a 20% reduction in water demand results in approximately a 13% savings in energy use for all seven systems analyzed. This figure might hold true for many similar systems that are dominated by pumping and not gravity driven. The second system aspect analyzed was storage tank(s) parameters. Various tank parameters: (1) tank maximum water levels, (2) tank elevation, and (3) tank diameter were considered in this part of the study. MDWDSs use a significant amount of electrical energy for the pumping of water from low elevations (usually a source) to higher ones (usually storage tanks). The use of electrical energy has an effect on pollution emissions and, therefore, potential global climate change as well. Various values of these tank parameters were modeled on seven MDWDSs of various sizes using a network solver and the energy usage recorded. It was found that when averaged over all seven analyzed systems (1) the reduction of maximum tank water level by 50% results in a 2% energy reduction, (2) energy use for a change in tank elevation is system specific, and (2) a reduction of tank diameter of 50% results in approximately a 7% energy savings. The third system aspect analyzed in this study was pumping station parameters. A pumping station consists of one or more pumps. The seven systems were analyzed to understand the effect of the variation of pump horsepower and the number of booster stations on energy use. It was found that adding booster stations could save energy depending upon the system characteristics. For systems with flat topography, a single main pumping station was found to use less energy. In systems with a higher-elevation neighborhood, however, one or more booster pumps with a reduced main pumping station capacity used less energy. The energy savings for the seven systems was dependent on the number of boosters and ranged from 5% to 66% for the analyzed five systems with higher elevation neighborhoods (S3, S4, S5, S6, and S7). No energy savings was realized for the remaining two flat topography systems, S1, and S2. The present study analyzed and established the relationship between various system aspects and energy use in seven MDWDSs. This aids in estimating the amount of energy savings in MDWDSs. This energy savings would ultimately help reduce Greenhouse gases (GHGs) emissions including per capita CO 2 emissions thereby potentially lowering the global climate change effect. This will in turn contribute to meeting the MDG of ensuring environmental sustainability.