63 resultados para Decommissioning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

NORTH SEA STUDY OCCASIONAL PAPER No. 122

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When decommissioning a nuclear facility it is important to be able to estimate activity levels of potentially radioactive samples and compare with clearance values defined by regulatory authorities. This paper presents a method of calibrating a clearance box monitor based on practical experimental measurements and Monte Carlo simulations. Adjusting the simulation for experimental data obtained using a simple point source permits the computation of absolute calibration factors for more complex geometries with an accuracy of a bit more than 20%. The uncertainty of the calibration factor can be improved to about 10% when the simulation is used relatively, in direct comparison with a measurement performed in the same geometry but with another nuclide. The simulation can also be used to validate the experimental calibration procedure when the sample is supposed to be homogeneous but the calibration factor is derived from a plate phantom. For more realistic geometries, like a small gravel dumpster, Monte Carlo simulation shows that the calibration factor obtained with a larger homogeneous phantom is correct within about 20%, if sample density is taken as the influencing parameter. Finally, simulation can be used to estimate the effect of a contamination hotspot. The research supporting this paper shows that activity could be largely underestimated in the event of a centrally-located hotspot and overestimated for a peripherally-located hotspot if the sample is assumed to be homogeneously contaminated. This demonstrates the usefulness of being able to complement experimental methods with Monte Carlo simulations in order to estimate calibration factors that cannot be directly measured because of a lack of available material or specific geometries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sodium phosphates are a class of chemicals that have been widely employed in commercial and consumer applications. However, declining use of these chemicals due to environmental concerns has lead to restructuring within the industry that has caused, and is likely to continue to cause, reduction of sodium phosphate production capacity. Closure of a sodium phosphate manufacturing plant necessitates decommissioning and decontamination activities that are subject to a variety of federal, state, and local regulations. A compliance plan was developed to provide a blueprint for ensuring that all federal regulatory requirements are met, however, site dependent state and local requirements were excluded. The compliance plan provides a framework that addresses project team formation and project planning, regulatory requirements, identification of affected processing equipment, plant pre-shutdown activities, waste stream identification and waste management facilities, safety, training, and emergency preparedness planning, and project decommissioning remedial actions. This regulatory compliance plan will enable sodium phosphate plant operators to complete decontamination and decommissioning work in a timely, efficient, compliant, and cost effective manner.