998 resultados para Decision Table


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Data quality has become a major concern for organisations. The rapid growth in the size and technology of a databases and data warehouses has brought significant advantages in accessing, storing, and retrieving information. At the same time, great challenges arise with rapid data throughput and heterogeneous accesses in terms of maintaining high data quality. Yet, despite the importance of data quality, literature has usually condensed data quality into detecting and correcting poor data such as outliers, incomplete or inaccurate values. As a result, organisations are unable to efficiently and effectively assess data quality. Having an accurate and proper data quality assessment method will enable users to benchmark their systems and monitor their improvement. This paper introduces a granules mining for measuring the random degree of error data which will enable decision makers to conduct accurate quality assessment and allocate the most severe data, thereby providing an accurate estimation of human and financial resources for conducting quality improvement tasks.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Abstract-To detect errors in decision tables one needs to decide whether a given set of constraints is feasible or not. This paper describes an algorithm to do so when the constraints are linear in variables that take only integer values. Decision tables with such constraints occur frequently in business data processing and in nonnumeric applications. The aim of the algorithm is to exploit. the abundance of very simple constraints that occur in typical decision table contexts. Essentially, the algorithm is a backtrack procedure where the the solution space is pruned by using the set of simple constrains. After some simplications, the simple constraints are captured in an acyclic directed graph with weighted edges. Further, only those partial vectors are considered from extension which can be extended to assignments that will at least satisfy the simple constraints. This is how pruning of the solution space is achieved. For every partial assignment considered, the graph representation of the simple constraints provides a lower bound for each variable which is not yet assigned a value. These lower bounds play a vital role in the algorithm and they are obtained in an efficient manner by updating older lower bounds. Our present algorithm also incorporates an idea by which it can be checked whether or not an (m - 2)-ary vector can be extended to a solution vector of m components, thereby backtracking is reduced by one component.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In recent years, rough set approach computing issues concerning reducts of decision tables have attracted the attention of many researchers. In this paper, we present the time complexity of an algorithm computing reducts of decision tables by relational database approach. Let DS = (U, C ∪ {d}) be a consistent decision table, we say that A ⊆ C is a relative reduct of DS if A contains a reduct of DS. Let s = be a relation schema on the attribute set C ∪ {d}, we say that A ⊆ C is a relative minimal set of the attribute d if A contains a minimal set of d. Let Qd be the family of all relative reducts of DS, and Pd be the family of all relative minimal sets of the attribute d on s. We prove that the problem whether Qd ⊆ Pd is co-NP-complete. However, the problem whether Pd ⊆ Qd is in P .

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Decision table and decision rules play an important role in rough set based data analysis, which compress databases into granules and describe the associations between granules. Granule mining was also proposed to interpret decision rules in terms of association rules and multi-tier structure. In this paper, we further extend granule mining to describe the relationships between granules not only by traditional support and confidence, but by diversity and condition diversity as well. Diversity measures how diverse of a granule associated with the other ganules, it provides a kind of novel knowledge in databases. Some experiments are conducted to test the proposed new concepts for describing the characteristics of a real network traffic data collection. The results show that the proposed concepts are promising.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Spatial relations, reflecting the complex association between geographical phenomena and environments, are very important in the solution of geographical issues. Different spatial relations can be expressed by indicators which are useful for the analysis of geographical issues. Urbanization, an important geographical issue, is considered in this paper. The spatial relationship indicators concerning urbanization are expressed with a decision table. Thereafter, the spatial relationship indicator rules are extracted based on the application of rough set theory. The extraction process of spatial relationship indicator rules is illustrated with data from the urban and rural areas of Shenzhen and Hong Kong, located in the Pearl River Delta. Land use vector data of 1995 and 2000 are used. The extracted spatial relationship indicator rules of 1995 are used to identify the urban and rural areas in Zhongshan, Zhuhai and Macao. The identification accuracy is approximately 96.3%. Similar procedures are used to extract the spatial relationship indicator rules of 2000 for the urban and rural areas in Zhongshan, Zhuhai and Macao. An identification accuracy of about 83.6% is obtained.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper introduces a recursive rule base adjustment to enhance the performance of fuzzy logic controllers. Here the fuzzy controller is constructed on the basis of a decision table (DT), relying on membership functions and fuzzy rules that incorporate heuristic knowledge and operator experience. If the controller performance is not satisfactory, it has previously been suggested that the rule base be altered by combined tuning of membership functions and controller scaling factors. The alternative approach proposed here entails alteration of the fuzzy rule base. The recursive rule base adjustment algorithm proposed in this paper has the benefit that it is computationally more efficient for the generation of a DT, and advantage for online realization. Simulation results are presented to support this thesis. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Selecting a set of features which is optimal for a given task is the problem which plays an important role in a wide variety of contexts including pattern recognition, images understanding and machine learning. The concept of reduction of the decision table based on the rough set is very useful for feature selection. In this paper, a genetic algorithm based approach is presented to search the relative reduct decision table of the rough set. This approach has the ability to accommodate multiple criteria such as accuracy and cost of classification into the feature selection process and finds the effective feature subset for texture classification . On the basis of the effective feature subset selected, this paper presents a method to extract the objects which are higher than their surroundings, such as trees or forest, in the color aerial images. The experiments results show that the feature subset selected and the method of the object extraction presented in this paper are practical and effective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The rough set is a new mathematical approach to imprecision, vagueness and uncertainty. The concept of reduction of the decision table based on the rough sets is very useful for feature selection. The paper describes an application of rough sets method to feature selection and reduction in texture images recognition. The methods applied include continuous data discretization based on Fuzzy c-means and, and rough set method for feature selection and reduction. The trees extractions in the aerial images were applied. The experiments show that the methods presented in this paper are practical and effective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

When project managers determine schedules for resource-constrained projects, they commonly use commercial project management software packages. Which resource-allocation methods are implemented in these packages is proprietary information. The resource-allocation problem is in general computationally difficult to solve to optimality. Hence, the question arises if and how various project management software packages differ in quality with respect to their resource-allocation capabilities. None of the few existing papers on this subject uses a sizeable data set and recent versions of common software packages. We experimentally analyze the resource-allocation capabilities of Acos Plus.1, AdeptTracker Professional, CS Project Professional, Microsoft Office Project 2007, Primavera P6, Sciforma PS8, and Turbo Project Professional. Our analysis is based on 1560 instances of the precedence- and resource-constrained project scheduling problem RCPSP. The experiment shows that using the resource-allocation feature of these packages may lead to a project duration increase of almost 115% above the best known feasible schedule. The increase gets larger with increasing resource scarcity and with increasing number of activities. We investigate the impact of different complexity scenarios and priority rules on the project duration obtained by the software packages. We provide a decision table to support managers in selecting a software package and a priority rule.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Las normativas que regulan la seguridad de las presas en España han recogido la necesidad de conocer los desplazamientos y deformaciones de sus estructuras y cimientos. A día de hoy, son muchas las presas en explotación que no cuentan con un sistema de auscultación adecuado para controlar este tipo de variables, ya que la instalación de métodos clásicos de precisión en las mismas podría no ser viable técnicamente y, de serlo, supondría un coste económico importante y una dudosa garantía del proceso de ejecución de la obra civil correspondiente. Con el desarrollo de las nuevas tecnologías, la informática y las telecomunicaciones, han surgido nuevos sistemas de auscultación de desplazamientos. Los sistemas GPS actuales, diseñados para el control de estructuras, guiado de maquinaria, navegación y topografía, estabilidad de taludes, subsidencias, etc. permiten alcanzar precisiones centimétricas. El sistema de control de movimientos basado en la tecnología DGPS (GPS diferencial) combinada con un filtro estadístico con el que se alcanzan sensibilidades de hasta ±1 mm en el sistema, suficientes para una auscultación normal de presas según los requerimientos de la normativa actual. Esta exactitud se adapta a los desplazamientos radiales de las presas, donde son muy comunes valores de amplitudes en coronación de hasta 15 mm en las de gravedad y de hasta 45 mm en el caso de las presas bóveda o arco. La presente investigación tiene por objetivo analizar la viabilidad del sistema DGPS en el control de movimientos de presas de hormigón comparando los diferentes sistemas de auscultación y su correlación con las variables físicas y las vinculadas al propio sistema GPS diferencial. Ante la necesidad de dar respuesta a estas preguntas y de validar e incorporar a la mencionada tecnología en la ingeniería civil en España, se ha llevado a cabo un estudio de caso en La Aceña (Ávila). Esta es una de las pocas presas españolas que se está controlando con dicha tecnología y de forma simultánea con los sistemas clásicos de auscultación y algunos otros de reciente aplicación La presente investigación se ha organizado con idea de dar respuesta a varias preguntas que el explotador de presas se plantea y que no se analizan en el estado del arte de la técnica: cómo hacer la configuración espacial del sistema y cuáles son los puntos necesarios que se deben controlar, qué sistemas de comunicaciones son los más fiables, cuáles son los costes asociados, calibración del software, vida útil y mantenimientos requeridos, así como la posibilidad de telecontrolar los datos. Entre las ventajas del sistema DGPS, podemos señalar su bajo coste de implantación y posibilidad de controlarlo de forma remota, así como la exactitud y carácter absoluto de los datos. Además, está especialmente indicado para presas aisladas o mal comunicadas y para aquellas otras en las que el explotador no tiene referencia alguna de la magnitud de los desplazamientos o deformaciones propias de la presa en toda su historia. Entre los inconvenientes de cualquier sistema apoyado en las nuevas tecnologías, destaca la importancia de las telecomunicaciones ya sea en el nivel local en la propia presao desde su ubicación hasta el centro de control de la explotación. Con la experiencia alcanzada en la gestión de la seguridad de presas y sobre la base de la reciente implantación de los nuevos métodos de auscultación descritos, se ha podido analizar cada una de sus ventajas e inconvenientes. En el capítulo 5, se presenta una tabla de decisión para el explotador que servirá como punto de partida para futuras inversiones. El impacto de esta investigación se ha visto reflejado en la publicación de varios artículos en revistas indexadas y en el debate suscitado entre gestores y profesionales del sector en los congresos nacionales e internacionales en los que se han presentado resultados preliminares. All regulations on the safety of dams in Spain have collected the need to know the displacements and deformations of the structure and its foundation. Today there are many dams holding not have an adequate system of auscultation to control variables such as the installation of classical methods of precision in the same might not be technically feasible, and if so, would cost important economic and guarantee the implementation process of the dubious civil works. With the development of new technologies, computing and telecommunications, new displacements auscultation systems have emerged. Current GPS systems designed to control structures, machine guidance, navigation and topography, slope stability, subsidence, etc, allow to reach centimeter-level accuracies. The motion control system based on DGPS technology applies a statistical filter that sensitivities are achieved in the system to ± 1 mm, sufficient for normal auscultation of dams as required by current regulations. This accuracy is adapted to the radial displacement of dams, which are common values in coronation amplitudes up to 15 mm in gravity dams and up to 45 mm in arch or arc dams. This research aims to analyze the feasibility of DGPS system in controlling movements of concrete dams, comparing the different systems auscultation and its correlation with physical variables and linked to differential GPS system itself. Given the need to answer this question and to validate and incorporate this technology to civil engineering in Spain, has conducted a case study in real time at the dam La Aceña (Ávila). This dam is one of the few Spanish companies, which are controlling with this technology and simultaneously with the classic auscultation systems and some other recent application. This research has been organized with a view to responding to questions that the dam operator arises and in the state of the art technique not discussed: how to make spatial configuration of the system and what are the necessary control points what communication systems are the most reliable, what are the associated costs, calibration software, service life and maintenance requirements, possibility of monitoring, etc. Among the advantages we can point to its low cost of implementation, the possibility of remote, high accuracy and absolute nature of the data. It could also be suitable for those isolated or poorly communicated dams and those in which the operator has no reference to the magnitude of displacements or deformations own prey in its history. The disadvantages of any system based on the new technologies we highlight the importance of telecommunications, either locally or from this dam control center of the farm. With the experience gained in the management of dam safety and based on the recent introduction of new methods of auscultation described, it has been possible to analyze each of their advantages and disadvantages. A decision table for the operator, which will serve as a starting point for future investments is presented. The impact of research, has been reflected in the publication of several articles in refereed journals and discussion among managers and professionals in national and international conferences in which they participated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gottigere lake with a water spread area of about 14.98 ha is located in the Bellandur Lake catchment of the South Pennar River basin. In recent years, this lake catchment has been subjected to environmental stress mainly due to the rampant unplanned developmental activities in the catchment. The functional ability of the ecosystem is impaired due to structural changes in the ecosystem. This is evident from poor water quality, breeding of disease vectors, contamination of groundwater in the catchment, frequent flooding in the catchment due to topography alteration, decline in groundwater table, erosion in lake bed, etc. The development plans of the region (current as well as the proposed) ignore the integrated planning approaches considering all components of the ecosystem. Serious threats to the sustainability of the region due to lack of holistic approaches in aquatic resources management are land use changes (removal of vegetation cover, etc.), point and non-point sources of pollution impairing water quality, dumping of solid waste (building waste, etc.). Conservation of lake ecosystem is possible only when the physical and chemical integrity of its catchment is maintained. Alteration in the catchment either due to land use changes (leading to paved surface area from vegetation cover), alteration in topography, construction of roads in the immediate vicinity are detrimental to water yield in the catchment and hence, the sustenance of the lake. Open spaces in the form of lakes and parks aid as kidney and lung in an urban ecosystem, which maintain the health of the people residing in the locality. Identification of core buffer zones and conservation of buffer zones (500 to 1000 m from shore) is to be taken up on priority for conservation and sustainable management of Bangalore lakes. Bangalore is located over a ridge delineating four watersheds, viz. Hebbal, Koramangala, Challaghatta and Vrishabhavathi. Lakes and tanks are an integral part of natural drainage and help in retaining water during rainfall, which otherwise get drained off as flash floods. Each lake harvests rainwater from its catchment and surplus flows downstream spilling into the next lake in the chain. The topography of Bangalore has uniquely supported the creation of a large number of lakes. These lakes form chains, being a series of impoundments across streams. This emphasises the interconnectivity among Bangalore lakes, which has to be retained to prevent Bangalore from flooding or from water scarcity. The main source of replenishment of groundwater is the rainfall. The slope of the terrain allows most of the rainwater to flow as run-off. With the steep gradients available in the major valleys of Bangalore, the rainwater will flow out of the city within four to five hours. Only a small fraction of the rainwater infiltrates into the soil. The infiltration of water into the subsoil has declined with more and more buildings and paved road being constructed in the city. Thus the natural drainage of Bangalore is governed by flows from the central ridge to all lower contours and is connected with various tanks and ponds. There are no major rivers flowing in Bangalore and there is an urgent need to sustain these vital ecosystems through proper conservation and management measures. The proposed peripheral ring road connecting Hosur Road (NH 7) and Mysore Road (SH 17) at Gottigere lake falls within the buffer zone of the lake. This would alter the catchment integrity and hence water yield affecting flora, fauna and local people, and ultimately lead to the disappearance of Gottigere lake. Developmental activities in lake catchments, which has altered lake’s ecological integrity is in violation of the Indian Fisheries Act – 1857, the Indian Forest Act – 1927, Wildlife (Protection) Act – 1972, Water (Prevention and Control of Pollution) Act – 1974, Water (Prevention and Control of Pollution) Act – 1977, Forest (Conservation Act) – 1980, Environmental (Protection) Act – 1986, Wildlife (Protection) Amendment Act – 1991 and National Conservation Strategy and Policy Statement on Environment and Development – 1992. Considering 65% decline of waterbodies in Bangalore (during last three decades), decision makers should immediately take preventive measures to ensure that lake ecosystems are not affected. This report discusses the impacts due to the proposed infrastructure developmental activities in the vicinity of Gottigere tank.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We describe a reconfigurable binary-decision-diagram logic circuit based on Shannon's expansion of Boolean logic function and its graphical representation on a semiconductor nanowire network. The circuit is reconfigured by using programmable switches that electrically connect and disconnect a small number of branches. This circuit has a compact structure with a small number of devices compared with the conventional look-up table architecture. A variable Boolean logic circuit was fabricated on an etched GaAs nanowire network having hexagonal topology with Schottky wrap gates and SiN-based programmable switches, and its correct logic operation together with dynamic reconfiguration was demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Les collaborations interorganisationnelles apparaissent de plus en plus incontournables pour s’attaquer concrètement, et avec quelques chances de résultats, à nos problèmes et défis collectifs les plus importants, que ce soit dans les domaines de l’environnement, de la santé ou de la sécurité publique. Ces initiatives de gouvernance collaborative surpassent chacune des organisations individuelles pour décider et intervenir collectivement. Dans cette visée, cette recherche contribue à mieux comprendre le processus de concertation et les interactions entre les acteurs et les organisations qui participent à des initiatives de collaboration interorganisationnelle où de nombreuses parties prenantes sont interpellées. Plus précisément, cette étude porte sur la problématique des réseaux d’acteurs et de la gouvernance en sécurité routière au Québec. Nous nous sommes penchés sur l’expérience de la Table québécoise de la sécurité routière (TQSR) afin de comprendre les enjeux actuels de représentation et de concertation en matière d’action gouvernementale. Cette recherche examine le rôle de l’identité des acteurs et de leurs interactions dans les processus de construction de consensus et de prise de décision, de même que les divers enjeux de communication inhérents à ce genre d’exercice collectif. Nous démontrons également qu’un facteur de succès d’une collaboration interorganisationnelle repose sur la capacité des acteurs à construire une identité collective malgré leurs intérêts divergents et parfois opposés. Cette thèse améliore donc notre compréhension des mécanismes et des processus à la base des collaborations interorganisationnelles comme pratique de gouvernance collaborative, un mode de gestion de plus en plus utilisé dans l’administration de nos sociétés contemporaines. Cette thèse contribue également à montrer la manière dont les organisations se construisent et se maintiennent localement par l’entremise de la communication et de ses modalités.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ce mémoire propose de décrire et comprendre les pratiques communicationnelles menant à la prise de décision consensuelle d’une collaboration interorganisationnelle (CI) spécifique, la Table québécoise de la sécurité routière (TQSR). Nous adoptons la perspective de la communication constitutive des organisations (CCO) développée par « l’École de Montréal » pour appréhender les dimensions constitutives de ces pratiques de communication et de ce mode privilégié de décision en CI. Après un aperçu de la littérature disponible en matière de CI et concernant la notion de consensus, nous proposons de nous concentrer sur les pratiques communicationnelles du consensus en adoptant la perspective du consensus par absence d’opposition d’Urfalino (2014). L’analyse de conversation et les principes d’une approche rhétorique sont ensuite mobilisés pour rendre compte des pratiques de communication qui permettent l’accomplissement du consensus lors d’une séance plénière du troisième cycle de travail de la TQSR, spécifiquement consacrée à la rédaction de son rapport final. Nous verrons que 1) les pratiques communicationnelles mobilisées facilitent l’arrêt de la décision et que 2) celles-ci sont constitutives du consensus qui favorise l’unité du collectif de collaboration.