970 resultados para Cycle time
Resumo:
The purpose of the present study was to examine the reproducibility of laboratory-based 40-km cycle time-trial performance on a stationary wind-trainer. Each week, for three consecutive weeks, and on different days, forty-three highly trained male cyclists ((x) over bar +/- SD; age = 25 +/- 6 y; mass = 75 +/- 7 kg; peak oxygen uptake [(V) over dot O-2 peak] = 64.8 +/- 5.2 ml x kg(-1) x min(-1)) performed: 1) a (V) over dot O-2 peak test, and 2) a 40-km time-trial on their own racing bicycle mounted to a stationary wind-trainer (Cateye - Cyclosimulator). Data from all tests were compared using a one-way analysis of variance. Performance on the second and third 40-km time-trials were highly related (r = 0.96; p < 0.001), not significantly different (57:21 +/- 2:57 vs. 57:12 +/- 3:14 min:s), and displayed a low coefficient of variation (CV) = 0.9 +/- 0.7%. Although the first 40-km time-trial (58:43 +/- 3:17min:s) was not significantly different from the second and third tests (p = 0.06), inclusion of the first test in the assessment of reliability increased within-subject CV to 3.0 +/- 2.9%. 40-km time-trial speed (km x h(-1)) was significantly (p < 0.001) related to peak power output (W; r = 0.75), (V) over dot O-2 peak (1 x min(-1); r = 0.53), and the second ventilatory turnpoint (1 x min(-1); r = 0.68) measured during the progressive exercise tests. These data demonstrate that the assessment of 40-km cycle time-trial performance in well-trained endurance cyclists on a stationary wind-trainer is reproducible, provided the athletes perform a familiarization trial.
Resumo:
A recent trend in distributed computer-controlled systems (DCCS) is to interconnect the distributed computing elements by means of multi-point broadcast networks. Since the network medium is shared between a number of network nodes, access contention exists and must be solved by a medium access control (MAC) protocol. Usually, DCCS impose real-time constraints. In essence, by real-time constraints we mean that traffic must be sent and received within a bounded interval, otherwise a timing fault is said to occur. This motivates the use of communication networks with a MAC protocol that guarantees bounded access and response times to message requests. PROFIBUS is a communication network in which the MAC protocol is based on a simplified version of the timed-token protocol. In this paper we address the cycle time properties of the PROFIBUS MAC protocol, since the knowledge of these properties is of paramount importance for guaranteeing the real-time behaviour of a distributed computer-controlled system which is supported by this type of network.
Resumo:
This study aimed to evaluate the influence of airflow (0.25, 0.50 and 0.75 L.L-1.min-1) and cycle time (10.45 h, 14.25 h and 17.35 h) on a sequencing batch reactor (SBR) performance in promoting nitrification and denitrification of poultry slaughterhouse wastewater. The operational stages included feeding, aerobic and anoxic reactions, sedimentation and discharge. SBR was operated in a laboratory scale with a working volume of 4 L, keeping 25% of biomass retained inside the reactor as inoculum for the next batch. In the anoxic stage, C: N ratio was maintained between 5 and 6 by adding cassava starch wastewater. A factorial design (22) with five repetitions was designed at the central point to evaluate the influence of cycle time and airflow on total inorganic nitrogen removal (N-NH4++N-NO2-+N-NO3-) and in the whole process (nitrification and denitrification). The highest total inorganic nitrogen removal (93.3%) was observed for airflow of 0.25 L.L-1.min‑1 and a cycle time of 14.25 h. At the end of the experiment, the sludge inside the reactor was characterized by fluorescent in situ hybridization (FISH), indicating the presence of ammonia and nitrite oxidizing bacteria.
Resumo:
Supply Chain Simulation (SCS) is applied to acquire information to support outsourcing decisions but obtaining enough detail in key parameters can often be a barrier to making well informed decisions.
One aspect of SCS that has been relatively unexplored is the impact of inaccurate data around delays within the SC. The impact of the magnitude and variability of process cycle time on typical performance indicators in a SC context is studied.
System cycle time, WIP levels and throughput are more sensitive to the magnitude of deterministic deviations in process cycle time than variable deviations. Manufacturing costs are not very sensitive to these deviations.
Future opportunities include investigating the impact of process failure or product defects, including logistics and transportation between SC members and using alternative costing methodologies.
Resumo:
PURPOSE: Slight physiological differences between acute exposure in normobaric hypoxia (NH) and hypobaric hypoxia (HH) have been reported. Taken together, these differences suggest different physiological responses to hypoxic exposure to a simulated altitude (NH) versus a terrestrial altitude (HH). For this purpose, in the present study, we aimed to directly compare the time-trial performance after acute hypoxia exposure (26 h, 3450 min) by the same subjects under three different conditions: NH, HH, and normobaric normoxia (NN). Based on all of the preceding studies examining the differences among these hypoxic conditions, we hypothesized greater performance impairment in HH than in NH. METHODS: The experimental design consisted of three sessions: NN (Sion: FiO2, 20.93), NH (Sion, hypoxic room: FiO2, 13.6%; barometric pressure, 716 mm Hg), and HH (Jungfraujoch: FiO2, 20.93; barometric pressure, 481 mm Hg). The performance was evaluated at the end of each session with a cycle time trial of 250 kJ. RESULTS: The mean time trial duration in NN was significantly shorter than under the two hypoxic conditions (P < 0.001). In addition, the mean duration in NH was significantly shorter than that in HH (P < 0.01). The mean pulse oxygen saturation during the time trial was significantly lower for HH than for NH (P < 0.05), and it was significantly higher in NN than for the two other sessions (P < 0.001). CONCLUSION: As previously suggested, HH seems to be a more stressful stimulus, and NH and HH should not be used interchangeability when endurance performance is the main objective. The principal factor in this performance difference between hypoxic conditions seemed to be the lower peripheral oxygen saturation in HH at rest, as well as during exercise.
Resumo:
Interest towards working capital management increased among practitioners and researchers because the financial crisis of 2008 caused the deterioration of the general financial situation. The importance of managing working capital effectively increased dramatically during the financial crisis. On one hand, companies highlighted the importance of working capital management as part of short-term financial management to overcome funding difficulties. On the other hand, in academia, it has been highlighted the need to analyze working capital management from a wider perspective namely from the value chain perspective. Previously, academic articles mostly discussed working capital management from a company-centered perspective. The objective of this thesis was to put working capital management in a wider and more academic perspective and present case studies of the value chains of industries as instrumental in theoretical contributions and practical contributions as complementary to theoretical contributions and conclusions. The principal assumption of this thesis is that selffinancing of value chains can be established through effective working capital management. Thus, the thesis introduces the financial value chain analysis method which is employed in the empirical studies. The effectiveness of working capital management of the value chains is studied through the cycle time of working capital. The financial value chain analysis method employed in this study is designed for considering value chain level phenomena. This method provides a holistic picture of the value chain through financial figures. It extends the value chain analysis to the industry level. Working capital management is studied by the cash conversion cycle that measures the length (days) of time a company has funds tied up in working capital, starting from the payment of purchases to the supplier and ending when remittance of sales is received from the customers. The working capital management practices employed in the automotive, pulp and paper and information and communication technology industries have been studied in this research project. Additionally, the Finnish pharmaceutical industry is studied to obtain a deeper understanding of the working capital management of the value chain. The results indicate that the cycle time of working capital is constant in the value chain context over time. The cash conversion cycle of automotive, pulp and paper, and ICT industries are on average 70, 60 and 40 days, respectively. The difference is mainly a consequence of the different cycle time of inventories. The financial crisis of 2008 affected the working capital management of the industries similarly. Both the cycle time of accounts receivable and accounts payable increased between 2008 and 2009. The results suggest that the companies of the automotive, pulp and paper and ICT value chains were not able to self-finance. Results do not indicate the improvement of value chains position in regard to working capital management either. The findings suggest that companies operating in the Finnish pharmaceutical industry are interested in developing their own working capital management, but collaboration with the value chain partners is not considered interesting. Competition no longer occurs between individual companies, but between value chains. Therefore the financial value chain analysis method introduced in this thesis has the potential to support value chains in improving their competitiveness.
Resumo:
The objective of the paper is to report research carried out over two years aiming at developing a framework to support the management of manufacturing organizations for whom reducing throughput time is strategically important, either because they compete based on short lead times or because they choose to pursue other objectives such as cost reduction by means of reducing their manufacturing cycle times. A step-by-step method is proposed based on the analyses of a number of Brazilian best practice cases (all manufacturing companies and all part of large multi-national corporations) and on the relevant literature.
Resumo:
Recently a new recipe for developing and deploying real-time systems has become increasingly adopted in the JET tokamak. Powered by the advent of x86 multi-core technology and the reliability of the JET’s well established Real-Time Data Network (RTDN) to handle all real-time I/O, an official Linux vanilla kernel has been demonstrated to be able to provide realtime performance to user-space applications that are required to meet stringent timing constraints. In particular, a careful rearrangement of the Interrupt ReQuests’ (IRQs) affinities together with the kernel’s CPU isolation mechanism allows to obtain either soft or hard real-time behavior depending on the synchronization mechanism adopted. Finally, the Multithreaded Application Real-Time executor (MARTe) framework is used for building applications particularly optimised for exploring multicore architectures. In the past year, four new systems based on this philosophy have been installed and are now part of the JET’s routine operation. The focus of the present work is on the configuration and interconnection of the ingredients that enable these new systems’ real-time capability and on the impact that JET’s distributed real-time architecture has on system engineering requirements, such as algorithm testing and plant commissioning. Details are given about the common real-time configuration and development path of these systems, followed by a brief description of each system together with results regarding their real-time performance. A cycle time jitter analysis of a user-space MARTe based application synchronising over a network is also presented. The goal is to compare its deterministic performance while running on a vanilla and on a Messaging Real time Grid (MRG) Linux kernel.
Resumo:
Background. To explore the efficacy of cycle training in the treatment of intermittent claudication, the present study compared performance and physiologic effects of cycle training with more conventional treadmill walking training in a group of patients with claudication. Method: Forty-two individuals with peripheral arterial disease and intermittent claudication (24 men, 18 women) were stratified by gender and the presence or absence of type 2 diabetes mellitus and then randomized to a treadmill (n = 13), cycle (n = 15), or control group (n = 14). Treadmill and cycle groups trained three times a week for 6 weeks, whereas the control group did not train during this period. Maximal and pain-free exercise times were measured on graded treadmill and cycle tests before and after training. Results. Treadmill training significantly improved maximal and pain-free treadmill walking times but did not improve cycle performance. Cycle training significantly improved maximal cycle time but did not improve treadmill performance. However, there was evidence of a stronger cross-transfer effect between the training modes for patients who reported a common limiting symptom during cycling and walking at baseline. There was also considerable variation in the training response to cycling, and a subgroup of responsive patients in the cycle group improved their walking performance by more than the average response observed in the treadmill group. Conclusion: These findings suggest that cycle exercise is not effective in improving walking performance in all claudication patients but might be an effective alternative to walking in those who exhibit similar limiting symptoms during both types of exercise.
Resumo:
The aim of this work was to track and verify the delivery of respiratory-gated irradiations, performed with three versions of TrueBeam linac, using a novel phantom arrangement that combined the OCTAVIUS® SRS 1000 array with a moving platform. The platform was programmed to generate sinusoidal motion of the array. This motion was tracked using the real-time position management (RPM) system and four amplitude gating options were employed to interrupt MV beam delivery when the platform was not located within set limits. Time-resolved spatial information extracted from analysis of x-ray fluences measured by the array was compared to the programmed motion of the platform and to the trace recorded by the RPM system during the delivery of the x-ray field. Temporal data recorded by the phantom and the RPM system were validated against trajectory log files, recorded by the linac during the irradiation, as well as oscilloscope waveforms recorded from the linac target signal. Gamma analysis was employed to compare time-integrated 2D x-ray dose fluences with theoretical fluences derived from the probability density function for each of the gating settings applied, where gamma criteria of 2%/2 mm, 1%/1 mm and 0.5%/0.5 mm were used to evaluate the limitations of the RPM system. Excellent agreement was observed in the analysis of spatial information extracted from the SRS 1000 array measurements. Comparisons of the average platform position with the expected position indicated absolute deviations of <0.5 mm for all four gating settings. Differences were observed when comparing time-resolved beam-on data stored in the RPM files and trajectory logs to the true target signal waveforms. Trajectory log files underestimated the cycle time between consecutive beam-on windows by 10.0 ± 0.8 ms. All measured fluences achieved 100% pass-rates using gamma criteria of 2%/2 mm and 50% of the fluences achieved pass-rates >90% when criteria of 0.5%/0.5 mm were used. Results using this novel phantom arrangement indicate that the RPM system is capable of accurately gating x-ray exposure during the delivery of a fixed-field treatment beam.
Resumo:
Patients with myofascial pain experience impaired mastication, which might also interfere with their sleep quality. The purpose of this study was to evaluate the jaw motion and sleep quality of patients with myofascial pain and the impact of a stabilization device therapy on both parameters. Fifty women diagnosed with myofascial pain by the Research Diagnostic Criteria were enrolled. Pain levels (visual analog scale), jaw movements (kinesiography), and sleep quality (Epworth Sleepiness Scale; Pittsburgh Sleep Quality Index) were evaluated before (control) and after stabilization device use. Range of motion (maximum opening, right and left excursions, and protrusion) and masticatory movements during Optosil mastication (opening, closing, and total cycle time; opening and closing angles; and maximum velocity) also were evaluated. Repeated-measures analysis of variance in a generalized linear mixed models procedure was used for statistical analysis (α=.05). At baseline, participants with myofascial pain showed a reduced range of jaw motion and poorer sleep quality. Treatment with a stabilization device reduced pain (P<.001) and increased both mouth opening (P<.001) and anteroposterior movement (P=.01). Also, after treatment, the maximum opening (P<.001) and closing (P=.04) velocities during mastication increased, and improvements in sleep scores for the Pittsburgh Sleep Quality Index (P<.001) and Epworth Sleepiness Scale (P=.04) were found. Myofascial pain impairs jaw motion and quality of sleep; the reduction of pain after the use of a stabilization device improves the range of motion and sleep parameters.
Resumo:
The main objective of this research was to evaluate the potential use of a bench-scale anaerobic sequencing batch biofilm reactor (ASBBR) containing mineral coal as inert support for removal Of Sulfide and organic matter effluents from an ASBBR (1.2 m(3)) utilized for treatment of sulfate-rich wastewater. The cycle time was 48 h, including the steps of feeding (2 h), reaction with continuous liquid recirculation (44 h) and discharge (2 h). COD removal efficiency was up to 90% and the effluents total sulfide concentrations (H(2)S, HS(-), S(2-)) remained in the range of 1.5 to 7.5 mg.l(-1) during the 50 days of operation (25 cycles). The un-ionized Sulfide and ionized sulfides were converted by biological process to elemental sulfur (S(0)) under oxygen limited conditions. The results obtained in the bench-scale reactor were used to design an ASBBR in pilot scale for use in post-treatment to achieve the emission standards (sulfide and COD) for sulfate reduction. The pilot-scale reactor, with a total volume of 0.43 m(3), the COD and total sulfide removal achieved 88% and 57%, respectively, for a cycle time of 48 h (70 days of operation or 35 cycles).
Resumo:
Mine simulation depends on data that is both coherent and representative of the mining operation. This paper describes a methodology for modeling operational data which has been developed for mine simulation. The methodology has been applied to a case study of an open-pit mine, where the cycle times of the truck fleet have been modeled for mine simulation purposes. The results obtained have shown that once the operational data has been treated using the proposed methodology, the system variables have proven to be adherent to theoretical distributions. The research indicated the need jar tracking the origin of data inconsistencies through the development of a process to manage inconsistent data from the mining operation.
Resumo:
The flowshop scheduling problem with blocking in-process is addressed in this paper. In this environment, there are no buffers between successive machines: therefore intermediate queues of jobs waiting in the system for their next operations are not allowed. Heuristic approaches are proposed to minimize the total tardiness criterion. A constructive heuristic that explores specific characteristics of the problem is presented. Moreover, a GRASP-based heuristic is proposed and Coupled with a path relinking strategy to search for better outcomes. Computational tests are presented and the comparisons made with an adaptation of the NEH algorithm and with a branch-and-bound algorithm indicate that the new approaches are promising. (c) 2007 Elsevier Ltd. All rights reserved.