986 resultados para Current transformers (Instrument transformer)
Resumo:
This work presents the design and evaluation of the REAM (Remote Electricity Actuation and Monitoring) node based around the modular Tyndall Mote platform. The REAM node enables the user to remotely actuate power to a mains power extension board while sampling the current, voltage, power and power factor of the attached load. The node contains a current transformer interfaced to an Energy Metering IC which continuously samples current and voltage. These values are periodically read from the part by a PIC24 microcontroller, which calculates the RMS current and voltage, power factor and overall power. The resultant values can then be queried wirelessly employing the Tyndall 802.15.4 compliant wireless module.
Resumo:
In a general way, in an electric power utility the current transformers (CT) are used to measurement and protection of transmission lines (TL) 1 The Power Line Carriers systems (PLC) are used for communication between electrical substations and transmission line protection. However, with the increasing use of optical fiber to communication (due mainly to its high data transmission rate and low signal-noise relation) this application loses potentiality. Therefore, other functions must be defined to equipments that are still in using, one of them is detecting faults (short-circuits) and transmission lines insulator strings damages 2. The purpose of this paper is to verify the possibility of using the path to the ground offered by the CTs instead of capacitive couplings / capacitive potential transformers to detect damaged insulators, since the current transformers are always present in all transmission lines (TL's) bays. To this a comparison between this new proposal and the PLC previous proposed system 2 is shown, evaluating the economical and technical points of view. ©2010 IEEE.
Resumo:
In this work, we report on the evaluation of a superconducting fault current limiter (SFCL). It is consisted of a modular superconducting device combined with a short-circuited transformer with a primary copper winding connected in series to the power line and the secondary side short-circuited by the superconducting device. The basic idea is adding a magnetic component to contribute to the current limitation by the impedance reflected to the line after transition of the superconducting device. The evaluation tests were performed with a prospective current up to 2 kA, with the short-circuited transformer of 2.5 kVA, 220 V/660 V connected to a test facility of 100 kVA power capacity. The resistive SFCL using a modular superconducting device was tested without degradation for a prospective fault current of 1.8 kA, achieving the limiting factor 2.78; the voltage achieved 282 V corresponding to an electric field of 11 V/m. The test performed with the combined SFCL (xsuperconducting device + transformer) using series and toroidal transformers showed current limiting factor of 3.1 and 2 times, respectively. The test results of the combined SFCL with short-circuited transformer showed undesirable influence of the transformer impedance, resulting in reduction of the fault current level. © 2002-2011 IEEE.
Resumo:
A superconducting fault current limiter (SCFL) consisted of a transformer with low reactance connected to the power line and with the secondary winding short-circuited by a modular superconducting limiter device with 16 elements connected in series was constructed and tested. The designed coupling transformer has low dispersion reactance in order to limit the voltage drop in the power line within the range of 5 % to 10 %. The experimental results showed that an insertion of a 0.125 Omega resistance limited the peak current to a factor of 2.5 times of the unlimited current. The power dissipation reached 39 kW during 100 ms, with an energy density of 380 J/cm(3). Based on these results, the SCFL will be further tested in a 3 MVA (15 kV/380 V) generator for currents up to 10 kA.
Resumo:
IEC 61850 Process Bus technology has the potential to improve cost, performance and reliability of substation design. Substantial costs associated with copper wiring (designing, documentation, construction, commissioning and troubleshooting) can be reduced with the application of digital Process Bus technology, especially those based upon international standards. An IEC 61850-9-2 based sampled value Process Bus is an enabling technology for the application of Non-Conventional Instrument Transformers (NCIT). Retaining the output of the NCIT in its native digital form, rather than conversion to an analogue output, allows for improved transient performance, dynamic range, safety, reliability and reduced cost. In this paper we report on a pilot installation using NCITs communicating across a switched Ethernet network using the UCAIug Implementation Guideline for IEC 61850-9-2 (9-2 Light Edition or 9-2LE). This system was commissioned in a 275 kV Line Reactor bay at Powerlink Queensland’s Braemar substation in 2009, with sampled value protection IEDs 'shadowing' the existing protection system. The results of commissioning tests and twelve months of service experience using a Fibre Optic Current Transformer (FOCT) from Smart Digital Optics (SDO) are presented, including the response of the system to fault conditions. A number of remaining issues to be resolved to enable wide-scale deployment of NCITs and IEC 61850-9-2 Process Bus technology are also discussed.
Resumo:
Transformers are very important elements of any power system. Unfortunately, they are subjected to through-faults and abnormal operating conditions which can affect not only the transformer itself but also other equipment connected to the transformer. Thus, it is essential to provide sufficient protection for transformers as well as the best possible selectivity and sensitivity of the protection. Nowadays microprocessor-based relays are widely used to protect power equipment. Current differential and voltage protection strategies are used in transformer protection applications and provide fast and sensitive multi-level protection and monitoring. The elements responsible for detecting turn-to-turn and turn-to-ground faults are the negative-sequence percentage differential element and restricted earth-fault (REF) element, respectively. During severe internal faults current transformers can saturate and slow down the speed of relay operation which affects the degree of equipment damage. The scope of this work is to develop a modeling methodology to perform simulations and laboratory tests for internal faults such as turn-to-turn and turn-to-ground for two step-down power transformers with capacity ratings of 11.2 MVA and 290 MVA. The simulated current waveforms are injected to a microprocessor relay to check its sensitivity for these internal faults. Saturation of current transformers is also studied in this work. All simulations are performed with the Alternative Transients Program (ATP) utilizing the internal fault model for three-phase two-winding transformers. The tested microprocessor relay is the SEL-487E current differential and voltage protection relay. The results showed that the ATP internal fault model can be used for testing microprocessor relays for any percentage of turns involved in an internal fault. An interesting observation from the experiments was that the SEL-487E relay is more sensitive to turn-to-turn faults than advertized for the transformers studied. The sensitivity of the restricted earth-fault element was confirmed. CT saturation cases showed that low accuracy CTs can be saturated with a high percentage of turn-to-turn faults, where the CT burden will affect the extent of saturation. Recommendations for future work include more accurate simulation of internal faults, transformer energization inrush, and other scenarios involving core saturation, using the newest version of the internal fault model. The SEL-487E relay or other microprocessor relays should again be tested for performance. Also, application of a grounding bank to the delta-connected side of a transformer will increase the zone of protection and relay performance can be tested for internal ground faults on both sides of a transformer.
Resumo:
A modified winding layout for three-phase transformers with PCB windings is proposed in this paper. This modified layout can be used in high current transformers with many PCB layers to simplify the fabrication process. One of the key factors that might increase the cost and complexity in the construction of planar transformers is the number of layers of each PCB winding. This issue becomes even more important in medium-high power three-phase transformers, where the number of PCB layers is higher. In addition to that, the proposed method allows the use of commercial core shapes that are commonly used to design single-phase transformers. This fact makes possible the reduction of cost and flexibility of the design solutions. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.
Resumo:
Desde seu lançamento, em 2002, a Norma IEC 61850 vem evoluindo para se tornar o padrão adotado nos Sistemas de Automação de Subestações. Dentre seus vários aspectos, destacam- se os serviços de tempo real, que permitem a implementação de funções de automação e de proteção dentro da subestação através da troca de mensagens específicas entre Dispositivos Eletrônicos Inteligentes através de um barramento digital de rede de dados. O objetivo central deste trabalho é explorar algumas das questões que envolvem a implementação de uma classe de serviços de tempo real: a transmissão de valores amostrados através de Serviços SMV, definidos pela Norma IEC 61850-9. Primeiramente, apresenta-se um breve resumo das principais características da Norma IEC 61850 que possibilitam o atendimento dos três requisitos por ela estabelecidos como base: a interoperabilidade entre dispositivos de diferentes fabricantes, a versatilidade na configuração e reconfiguração do Sistema de Automação da Subestação, e a possibilidade de implementação de novas tecnologias. Em seguida, explora-se com maior profundidade todos os aspectos relevantes à implementação dos Serviços SMV. Devido à complexidade deste assunto, o autor propõe abordá-lo sob a ótica de cinco tópicos interdependentes: variações da Norma IEC 61850-9, confiabilidade do barramento de processo, sincronismo de tempo, análise da qualidade da medição e segurança cibernética. Com base nos resultados apresentados neste estudo, propõem-se duas plataformas, um protótipo de Transformador de Potencial Óptico e um protótipo de Relé de Proteção Diferencial para transformadores de potência, com o objetivo de explorar alguns dos aspectos pertinentes à implementação de um barramento de processo de acordo com a Norma IEC 61850-9. Também foram realizados testes de geração e transmissão de mensagens contendo valores de amostras de tensão/corrente do sistema elétrico (denominadas de SV Messages) com a finalidade de implementá-las de fato e avaliar as ferramentas de mercado disponíveis. Por fim foi proposto um modelo para a simulação do sistema de potência em conjunto com a rede de comunicação utilizando o programa Matlab/Simulink. O autor espera que este trabalho contribua para esclarecer os vários conceitos envolvidos na implementação do barramento de processo definido pela Norma IEC 61850-9, auxiliando na pesquisa e no desenvolvimento de novas ferramentas e dispositivos, e no aprimoramento da Norma IEC 61850.
Resumo:
Information available in frequency response data is equivalently available in the time domain as a response due to an impulse excitation. The idea to pursue this equivalence to estimate series capacitance is linked to the well-known fact that under impulse excitation, the line/neutral current in a transformer has three distinct components, of which, the initial capacitive component is the first to manifest, followed by the oscillatory and inductive components. Of these, the capacitive component is temporally well separated from the rest-a crucial feature permitting its direct access and analysis. Further, the winding initially behaves as a pure capacitive network, so the initial component must obviously originate from only the (series and shunt) capacitances. With this logic, it should therefore be possible to estimate series capacitance, just by measuring the initial capacitive component of line current and the total shunt capacitance. The principle of the method and details of its implementation on two actual isolated transformerwindings (uniformly wound) are presented. For implementation, a low-voltage recurrent surge generator, a current probe, and a digital oscilloscope are all that is needed. The method is simple and requires no programming and needs least user intervention, thus paving the way for its widespread use.
Resumo:
Pós-graduação em Engenharia Elétrica - FEB
Resumo:
Este trabalho apresenta o desenvolvimento e a aplicação em campo de um sistema para verificação metrológica de transformadores de corrente em alta tensão. O sistema foi desenvolvido utilizando como premissas básicas a portabilidade e a confiabilidade metrológica, de tal forma que pudesse ser facilmente transportado e instalado, sem interrupção do fornecimento de energia elétrica nem o uso de infraestrutura complexa de transporte e montagem. O sistema utiliza como padrão de referência um transdutor ótico, cujo sensor mede a corrente elétrica do primário do transformador de corrente a ser verificado através do efeito magneto-ótico de Faraday. Ele também é composto por outros instrumentos padrão que medem a corrente elétrica do secundário do transformador de corrente sob verificação, e realizam a comparação entre esta e o sinal da saída do transdutor ótico padrão. Foram realizados ensaios em laboratório e em campo. Os ensaios em campo foram realizados em duas subestações em Belém/PA, visando avaliar a correta operação do sistema em condições de alta tensão e alta corrente. Os ensaios foram realizados em seis transformadores de corrente conectados em 230 kV, em condições médias de carga, e obtiveram resultados satisfatórios.
Resumo:
Circuit breaker restrikes are unwanted occurrence, which can ultimately lead to breaker. Before 2008, there was little evidence in the literature of monitoring techniques based on restrike measurement and interpretation produced during switching of capacitor banks and shunt reactor banks. In 2008 a non-intrusive radiometric restrike measurement method, as well a restrike hardware detection algorithm was developed. The limitations of the radiometric measurement method are a band limited frequency response as well as limitations in amplitude determination. Current detection methods and algorithms required the use of wide bandwidth current transformers and voltage dividers. A novel non-intrusive restrike diagnostic algorithm using ATP (Alternative Transient Program) and wavelet transforms is proposed. Wavelet transforms are the most common use in signal processing, which is divided into two tests, i.e. restrike detection and energy level based on deteriorated waveforms in different types of restrike. A ‘db5’ wavelet was selected in the tests as it gave a 97% correct diagnostic rate evaluated using a database of diagnostic signatures. This was also tested using restrike waveforms simulated under different network parameters which gave a 92% correct diagnostic responses. The diagnostic technique and methodology developed in this research can be applied to any power monitoring system with slight modification for restrike detection.
Resumo:
A breaker restrike is an abnormal arcing phenomenon, leading to a possible breaker failure. Eventually, this failure leads to interruption of the transmission and distribution of the electricity supply system until the breaker is replaced. Before 2008, there was little evidence in the literature of monitoring techniques based on restrike measurement and interpretation produced during switching of capacitor banks and shunt reactor banks in power systems. In 2008 a non-intrusive radiometric restrike measurement method and a restrike hardware detection algorithm were developed by M.S. Ramli and B. Kasztenny. However, the limitations of the radiometric measurement method are a band limited frequency response as well as limitations in amplitude determination. Current restrike detection methods and algorithms require the use of wide bandwidth current transformers and high voltage dividers. A restrike switch model using Alternative Transient Program (ATP) and Wavelet Transforms which support diagnostics are proposed. Restrike phenomena become a new diagnostic process using measurements, ATP and Wavelet Transforms for online interrupter monitoring. This research project investigates the restrike switch model Parameter „A. dielectric voltage gradient related to a normal and slowed case of the contact opening velocity and the escalation voltages, which can be used as a diagnostic tool for a vacuum circuit-breaker (CB) at service voltages between 11 kV and 63 kV. During current interruption of an inductive load at current quenching or chopping, a transient voltage is developed across the contact gap. The dielectric strength of the gap should rise to a point to withstand this transient voltage. If it does not, the gap will flash over, resulting in a restrike. A straight line is fitted through the voltage points at flashover of the contact gap. This is the point at which the gap voltage has reached a value that exceeds the dielectric strength of the gap. This research shows that a change in opening contact velocity of the vacuum CB produces a corresponding change in the slope of the gap escalation voltage envelope. To investigate the diagnostic process, an ATP restrike switch model was modified with contact opening velocity computation for restrike waveform signature analyses along with experimental investigations. This also enhanced a mathematical CB model with the empirical dielectric model for SF6 (sulphur hexa-fluoride) CBs at service voltages above 63 kV and a generalised dielectric curve model for 12 kV CBs. A CB restrike can be predicted if there is a similar type of restrike waveform signatures for measured and simulated waveforms. The restrike switch model applications are used for: computer simulations as virtual experiments, including predicting breaker restrikes; estimating the interrupter remaining life of SF6 puffer CBs; checking system stresses; assessing point-on-wave (POW) operations; and for a restrike detection algorithm development using Wavelet Transforms. A simulated high frequency nozzle current magnitude was applied to an Equation (derived from the literature) which can calculate the life extension of the interrupter of a SF6 high voltage CB. The restrike waveform signatures for a medium and high voltage CB identify its possible failure mechanism such as delayed opening, degraded dielectric strength and improper contact travel. The simulated and measured restrike waveform signatures are analysed using Matlab software for automatic detection. Experimental investigation of a 12 kV vacuum CB diagnostic was carried out for the parameter determination and a passive antenna calibration was also successfully developed with applications for field implementation. The degradation features were also evaluated with a predictive interpretation technique from the experiments, and the subsequent simulation indicates that the drop in voltage related to the slow opening velocity mechanism measurement to give a degree of contact degradation. A predictive interpretation technique is a computer modeling for assessing switching device performance, which allows one to vary a single parameter at a time; this is often difficult to do experimentally because of the variable contact opening velocity. The significance of this thesis outcome is that it is a non-intrusive method developed using measurements, ATP and Wavelet Transforms to predict and interpret a breaker restrike risk. The measurements on high voltage circuit-breakers can identify degradation that can interrupt the distribution and transmission of an electricity supply system. It is hoped that the techniques for the monitoring of restrike phenomena developed by this research will form part of a diagnostic process that will be valuable for detecting breaker stresses relating to the interrupter lifetime. Suggestions for future research, including a field implementation proposal to validate the restrike switch model for ATP system studies and the hot dielectric strength curve model for SF6 CBs, are given in Appendix A.
Resumo:
In this paper, a simple single-phase grid-connected photovoltaic (PV) inverter topology consisting of a boost section, a low-voltage single-phase inverter with an inductive filter, and a step-up transformer interfacing the grid is considered. Ideally, this topology will not inject any lower order harmonics into the grid due to high-frequency pulse width modulation operation. However, the nonideal factors in the system such as core saturation-induced distorted magnetizing current of the transformer and the dead time of the inverter, etc., contribute to a significant amount of lower order harmonics in the grid current. A novel design of inverter current control that mitigates lower order harmonics is presented in this paper. An adaptive harmonic compensation technique and its design are proposed for the lower order harmonic compensation. In addition, a proportional-resonant-integral (PRI) controller and its design are also proposed. This controller eliminates the dc component in the control system, which introduces even harmonics in the grid current in the topology considered. The dynamics of the system due to the interaction between the PRI controller and the adaptive compensation scheme is also analyzed. The complete design has been validated with experimental results and good agreement with theoretical analysis of the overall system is observed.
Resumo:
Academic and industrial literature concerning the energy consumption of commercial kitchens is scarce. Electricity consumption data were collected from distribution board current transformers in a sample of fourteen UK public house restaurants. This was set up to identify patterns of appliance use as well as to assess the total energy consumption of these establishments. The electricity consumption in the selected commercial kitchens was significantly higher than current literature estimates. On average, 63% of the premises electricity consumption was attributed to the catering activity. Key appliances that contributed to the samples average electricity consumption were identified as refrigeration (70 kwh, 41%), fryers (11 kwh, 13%), combi-ovens (35 kwh, 12%) bain maries (27 kwh, 9%) and grills (37kwh, 12%). Behavioral factors and poor maintenance were identified as major contributors to excessive electricity usage with potential savings of 70% and 45% respectively. Initiatives are required to influence operator behavior, such as the expansion of mandatory energy labeling, improved feedback information and the use of behavior change campaigns. Strict maintenance protocols and more appropriate sizing of refrigeration would be of great benefit to energy reduction.