888 resultados para Contract administration
Resumo:
Mode of access: Internet.
Resumo:
"This manual supersedes DoD 4105.63-M, December 1977, and Changes 1 thru 7."
Resumo:
Mode of access: Internet.
The Impact of the Recent Economic Recession on the operation of the NEC Contract in Northern Ireland
Resumo:
In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.
Resumo:
FOREWORD Welcome to this West Africa Built Environment Research (WABER) conference taking place here in Ghana. Thank you for coming and welcome to Accra. The main aims of the WABER conference are: to help young researchers and early-career scholars in West Africa to develop their research work and skills through constructive face-to-face interaction with experienced academics; to provide a platform for networking and collaborative work among senior built environment academics in West Africa; and to serve as a vehicle for developing the field of construction management and economics in Africa. Waber 2009 The WABER event in 2009 was held at the British Council in Accra, Ghana on 2-3 June. The event was a resounding success. It attracted participation from 32 researchers, from 12 different institutions, who presented their work to an audience of approximately 100 people. Each presenter received immediate and constructive feedback from an international panel. The event was opened by Professor K.K. Adarkwa, Vice Chancellor of KNUST, Kumasi, Ghana, with several senior academics and researchers from universities, polytechnics, and other institutions in Ghana and Nigeria in attendance. There was also a significant level of attendance by senior construction practitioners in Ghana. Thank you to the School of Construction Management and Engineering, University of Reading, UK for funding the inaugural event in 2009. We are also grateful to all of you who helped to make the event a success and to those of you who have joined us here today to build upon the success and legacy of WABER 2009. Waber 2010 This year, we have 60+ peer-reviewed papers and presentations on topics relating to Building services and maintenance, Construction costs, Construction design and technology, Construction education, Construction finance, Construction procurement, Contract administration, Contract management, Contractor development, Decision support systems, Dispute resolution, Economic development, Energy efficiency, Environment and sustainability, Health and safety, Human resources, Information technology, Marketing, Materials science, Organisation strategy and business performance, Productivity, Project management, Quantity surveying, Real estate and planning, Solar energy systems, Supply chain management and Urban development. We hope that these papers will generate interest among delagates and stimulate discussion here and beyond the conference into the wider community of academia and industry. The delegates at this conference come from 10 different countries. This provides a rich international and multicultural blend and a perfect platform for networking and developing collaborations. This year we are blessed to have three high profile keynote speakers in the persons of Professor George Ofori (National University of Singapore), Dr Roine Leiringer (University of Reading, UK) and Professor Will Hughes (University of Reading, UK). We are also thankful to Dr Chris Harty (University of Reading, UK) who is facilitating the Research Skills Workshop on ‘Writing a scientific article’. Thank you to Dr Sena Agyepong of our conference organising team for her capable management of local organising arrangements. And above all, thank you to all of you for coming to this conference. Enjoy and have a safe journey back home. Dr Samuel Laryea School of Construction Management and Engineering University of Reading, July 2010
Resumo:
Seminars held in Washington, D.C.
Resumo:
Cover title.
Resumo:
Mode of access: Internet.
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
Mirroring the paper versions exchanged between businesses today, electronic contracts offer the possibility of dynamic, automatic creation and enforcement of restrictions and compulsions on agent behaviour that are designed to ensure business objectives are met. However, where there are many contracts within a particular application, it can be difficult to determine whether the system can reliably fulfil them all; computer-parsable electronic contracts may allow such verification to be automated. In this paper, we describe a conceptual framework and architecture specification in which normative business contracts can be electronically represented, verified, established, renewed, etc. In particular, we aim to allow systems containing multiple contracts to be checked for conflicts and violations of business objectives. We illustrate the framework and architecture with an aerospace example.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
v.1.Summary and recommendations.--v.2.Automatic ship control and communications systems.--v.3.Appendices to 262 R 0012.--v.3.Appendices to 262 R 0012.--v.4.automatic control of engineering functions.--v.5.Appendices to 262 R 0014.--v.6.Powerplants and auxiliaries for automated ships.--v.7.Economic aspects of automation.--v.8.Legal implications of automation.
Resumo:
Mode of access: Internet.
Resumo:
This demonstration project consisted of three adjacent highway resurfacing projects using asphalt cement concrete removed from an Interstate highway which had become severely rutted.