913 resultados para Construction work monitoring
Resumo:
Construction at the Glenridge Campus.
Resumo:
Construction work on Davis Community Center and Apartments. The complex opened September,1974 at 625 North Grand Street, Orange, California, named in honor of Chapman College's fourth president, Dr. John L. Davis. The five three-story apartment buildings were designed by Harold Gimeno & Associates of Santa Ana and built by the J. Ray Construction Company, Inc. of Costa Mesa.
Resumo:
Construction work on Davis Community Center and Apartments, 1974. The complex opened September, 1974 at 625 North Grand Street, Orange, California, named in honor of Chapman College's fourth president, Dr. John L. Davis. The five three-story apartment buildings were designed by Harold Gimeno & Associates of Santa Ana and built by the J. Ray Construction Company, Inc. of Costa Mesa.
Resumo:
Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.
Resumo:
BACKGROUND: Mortality and morbidity are particularly high in the building industry. The annual rate of non-fatal occupational accidents in Switzerland is 1,133 per 100,000 inhabitants. METHODS: Retrospective analysis of the electronic database of a university emergency centre. Between 2001 and 2011, 782 occupational accidents to construction workers were recorded and analysed using specific demographic and medical keywords. RESULTS: Most patients were aged 30-39 (30.4%). 66.4% of the injured workers were foreigners. This is almost twice as high as the overall proportion of foreigners in Switzerland or in the Swiss labour market. 16% of the Swiss construction workers and 8% of the foreign construction workers suffered a severe injury with ISS >15. There was a trend for workers aged 60 and above to suffer an accident with a high ISS (p = 0.089). CONCLUSIONS: As in other European countries, most patients were in their thirties. Older construction workers suffered fewer injuries, although these tended to be more severe. The injuries were evenly distributed through the working days of the week. A special effort should be made that current health and safety measures are understood and applied by foreign and older construction workers.
Resumo:
The requirements for edge protection systems on most sloped work surfaces (class C, according to EN 13374-2013 code) in construction works are studied in this paper. Maximum deceleration suffered by a falling body and maximum deflection of the protection system were analyzed through finite-element models and confirmed through full-scale experiments. The aim of this work is to determine which value for deflection system entails a safe deceleration for the human body. This value is compared with the requirements given by the current version of EN 13374-2013. An additional series of experiments were done to determine the acceleration linked to minimum deflection required by code (200 mm) during the retention process. According to the obtained results, a modification of this value is recommended. Additionally, a simple design formula for this falling protection system is proposed as a quick tool for the initial steps of design.
Resumo:
"Reprinted from Journal of the New England Water Works Association, vol. XXV, no. 3."
Resumo:
"Prepared under the supervision of William A. Radford, editor-in-chief ... Alfred Sidney Johnson ... editor in charge."
Resumo:
The safety of workers in nighttime roadway work zones has become a major concern for state transportation agencies due to the increase in the number of work zone fatalities. During the last decade, several studies have focused on the improvement of safety in nighttime roadway work zones; but the element that is still missing is a set of tools for translating the research results into practice. This paper discusses: 1) the importance of translating the research results related to the safety of workers and safety planning of nighttime work zones into practice, and 2) examples of tools that can be used for translating the results of such studies into practice. A tool that can propose safety recommendations in nighttime work zones and a web-based safety training tool for workers are presented in this paper. The tools were created as a component of a five-year research study on the assessment of the safety of nighttime roadway construction. The objectives of both tools are explained as well as their functionalities (i.e., what the tools can do for the users); their components (e.g., knowledge base, database, and interfaces); and their structures (i.e., how the components of the tools are organized to meet the objectives). Evaluations by the proposed users of each tool are also presented.
Resumo:
O presente relatório diz respeito ao estágio profissional realizado no âmbito do Trabalho Final de Mestrado do Curso de Engenharia Civil, do Instituto Superior de Engenharia de Lisboa (ISEL), e tem como principais objectivos descrever e analisar as actividades realizadas durante o acompanhamento da construção de duas creches e ateliers de tempos livres. Dentro das opções fornecidas pelo ISEL para Trabalhos Finais de Mestrado, o Estagiário foi em busca do estágio profissional, a fim de contactar directamente com a realidade profissional da Engenharia Civil, podendo assim, através do acompanhamento activo de obras, pôr em prática os conhecimentos teóricos e científicos adquiridos ao longo do curso e preparar-se para futuros desafios profissionais. O período de estágio teve uma duração de cerca de cinco meses, sendo o Estagiário acompanhado e auxiliado pelo seu Orientador da empresa (Director de Obra) em tarefas relacionadas com a Direcção da Obra, tais como: estudo do projecto de execução, planeamento da obra e reuniões com a Fiscalização e Subempreiteiros. O estágio dividiu-se em duas fases distintas: a primeira fase relativa a construção do Atelier de Tempos Livres da Kairós, em que a obra já estava numa fase inicial de acabamentos e que coincidiu com o princípio do estágio. Quanto à segunda fase, referente à obra de construção da Creche e Atelier de Tempos Livres dos Arrifes, em que o estagiário teve a oportunidade de acompanhá-la desde a consignação até a fase de execução da estrutura, coincidente com o término do estágio.
Resumo:
Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construction work zone can be. An integrated approach was taken to research work-zone safety issues and mobility, including input from many personnel, ranging from roadway designers to construction laborers and equipment operators. The research team analyzed crash data from Iowa work-zone incident reports and Occupational Safety and Health Administration data for the industry in conjunction with the results of personal interviews, a targeted work-zone ingress and egress survey, and a work-zone pilot project.