863 resultados para Construction process improvement
Resumo:
The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.
Resumo:
This paper is a detailed case narrative on how a Faculty of a leading Australian University conducted a rigorous process improvement project, applying fundamental Business Process Management (BPM) concepts. The key goal was to increase the efficiency of the faculty’s service desk. The decrease of available funds due to reducing student numbers and the ever increasing costs associated with service desk prompted this project. The outcomes of the project presented a set of recommendations which leads to organizational innovation having information technology as an enabler for change. The target audience includes general BPM practitioners or academics who are interested in BPM related case studies, and specific organisations who might be interested in conducting BPM within their service desk processes.
Resumo:
Research and innovation in the built environment is increasingly taking on an inter-disciplinary nature. The built environment industry and professional practice have long adopted multi and inter-disciplinary practices. The application of IT in Construction is moving beyond the automation and replication of discrete mono and multi-disciplinary tasks to replicate and model the improved inter-disciplinary processes of modern design and construction practice. A major long-term research project underway at the University of Salford seeks to develop IT modelling capability to support the design of buildings and facilities that are buildable, maintainable, operable, sustainable, accessible, and have properties of acoustic, thermal and business support performance that are of a high standard. Such an IT modelling tool has been the dream of the research community for a long time. Recent advances in technology are beginning to make such a modelling tool feasible.----- Some of the key problems with its further research and development, and with its ultimate implementation, will be the challenges of multiple research and built environment stakeholders sharing a common vision, language and sense of trust. This paper explores these challenges as a set of research issues that underpin the development of appropriate technology to support realisable advances in construction process improvements.
Resumo:
Numerous tools and techniques have been developed to eliminate or reduce waste and carry out Lean concepts in the manufacturing environment. However, in practice, manufacturers encounter difficulties to clearly identify the weaknesses of the existing processes in order to address them by implementing Lean tools. Moreover, selection and implementation of appropriate Lean strategies to address the problems identified is a challenging task. According best of authors‟ knowledge, there is no method available to quantitatively evaluate the cost and benefits of implementing a Lean strategy to address the weaknesses in the manufacturing process. Therefore, benefits of Lean approaches cannot be clearly established. The authors developed a methodology to quantitatively measure the performances of a manufacturing system in detecting the causes of inefficiencies and to select appropriate Lean strategies to address the problems identified. The proposed methodology demonstrates that the Lean strategies should be implemented based on the contexts of the organization and identified problem in order to achieve maximum cost benefits. Finally, a case study has been presented to demonstrate how the procedure developed works in practical situation.
Resumo:
The demand for Business Process Management (BPM) is rapidly rising and with that, the need for capable BPM professionals is also rising. Yet, only a very few structured BPM training/ education programs are available, across universities and professional trainers globally. The ‘lack of appropriate teaching resources’ has been identified as a critical issue for BPM educators in prior studies. Case-based teaching can be an effective means of educating future BPM professionals. A main reason is that cases create an authentic learning environment where the complexities and challenges of the ‘real world’ can be presented in a narrative enabling the students to develop crucial skills such as problem solving, analysis and creativity-within-constraints, and to apply the tools and techniques within a richer and real (or proxy to real) context. However, so far well documented BPM teaching cases are scarce. This article aims to contribute to address this gap by providing a comprehensive teaching case and teaching notes that facilitates the education of selected process improvement phases, namely identification, modelling, analysis, and improvement. The article is divided into three main parts: (i) Introductory teaching notes, (ii) The case narrative, and (iii) Student activities from the case and teaching notes.
Resumo:
Process improvement has become a number one business priority, and more and more project requests are raised in organizations, seeking approval and resources for process-related projects. Realistically, the total of the requested funds exceeds the allocated budget, the number of projects is higher than the available bandwidth, and only some of these (very often only few) can be supported and most never see any light. Relevant resources are scarce, and correct decisions must be made to make sure that those projects that are of best value are implemented. How can decision makers make the right decision on the following: Which project(s) are to be approved and when to commence work on them? Which projects are most aligned with corporate strategy? How can the project’s value to the business be calculated and explained? How can these decisions be made in a fair, justifiable manner that brings the best results to the company and its stakeholders? This chapter describes a business value scoring (BVS) model that was built, tested, and implemented by a leading financial institution in Australia to address these very questions. The chapter discusses the background and motivations for such an initiative and describes the tool in detail. All components and underlying concepts are explained, together with details on its application. This tool has been successfully implemented in the case organization. The chapter provides practical guidelines for organizations that wish to adopt this approach.
Resumo:
Construction is one of the most hazardous industries due to its dynamic, temporary, and decentralized nature. The Hong Kong Commissioner for Labor identifies worker behavior as the root cause of construction accidents. Behavior-based safety (BBS) is one effective approach in managing employee safety issues. However, there is little research on the application of BBS in the construction industry. This research proposes an extension of the BBS approach, proactive behavior-based safety (PBBS), to improve construction safety. PBBS integrates the theory of BBS with the technology of Proactive Construction Management System (PCMS). The innovations of PBBS are: (1) automatically monitoring location-based behaviors; (2)quantitatively measuring safety performance; (3) investigating potential causes of unsafe behaviors; and (4) improving the efficiency of safety management. A pilot study of a Hong Kong construction site practicing PBBS was conducted. The experiment results showed that PBBS performed well on construction accident prevention and the Safety Index (SI) of the two project teams, with increased improvements by 36.07% and 44.70% respectively. It is concluded that PBBS is effective and adaptable to construction industry.
Resumo:
Organisations are constantly seeking new ways to improve operational efficiencies. This study investigates a novel way to identify potential efficiency gains in business operations by observing how they were carried out in the past and then exploring better ways of executing them by taking into account trade-offs between time, cost and resource utilisation. This paper demonstrates how these trade-offs can be incorporated in the assessment of alternative process execution scenarios by making use of a cost environment. A number of optimisation techniques are proposed to explore and assess alternative execution scenarios. The objective function is represented by a cost structure that captures different process dimensions. An experimental evaluation is conducted to analyse the performance and scalability of the optimisation techniques: integer linear programming (ILP), hill climbing, tabu search, and our earlier proposed hybrid genetic algorithm approach. The findings demonstrate that the hybrid genetic algorithm is scalable and performs better compared to other techniques. Moreover, we argue that the use of ILP is unrealistic in this setup and cannot handle complex cost functions such as the ones we propose. Finally, we show how cost-related insights can be gained from improved execution scenarios and how these can be utilised to put forward recommendations for reducing process-related cost and overhead within organisations.
Resumo:
A model of the information and material activities that comprise the overall construction process is presented, using the SADT activity modelling methodology. The basic model is further refined into a number of generic information handling activities such as creation of new information, information search and retrieval, information distribution and person-to-person communication. The viewpoint could be described as information logistics. This model is then combined with a more traditional building process model, consisting of phases such as design and construction. The resulting two-dimensional matrix can be used for positioning different types of generic IT-tools or construction specific applications. The model can thus provide a starting point for a discussion of the application of information and communication technology in construction and for measurements of the impacts of IT on the overall process and its related costs.