987 resultados para Construction phase


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The major objective of this project is to evaluate image analysis for characterizing air voids in Portland cement contract (PCC) and asphalt concrete (AC) and aggregate gradation in asphalt concrete. Phase 1 of this project has concentrated on evaluation and refinement of sample preparation techniques, evaluation of methods and instruments for conducting image analysis, and finally, analysis and comparison of a select portion of samples. Preliminary results suggest a strong correlation between the results obtained from the linear traverse method and image analysis methods for determining percent air voids in concrete. Preliminary work with asphalt samples has shown that damage caused by a high vacuum of the conventional scanning electron microscope (SEM) may too disruptive. Alternative solutions have been explored, including confocal microscopy and low vacuum electron microscopy. Additionally, a conventional high vacuum SEM operating at a marginal operating vacuum may suffice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes a new strategy to reduce the combinatorial search space of a mixed integer linear programming (MILP) problem. The construction phase of greedy randomized adaptive search procedure (GRASP-CP) is employed to reduce the domain of the integer variables of the transportation model of the transmission expansion planning (TM-TEP) problem. This problem is a MILP and very difficult to solve specially for large scale systems. The branch and bound (BB) algorithm is used to solve the problem in both full and the reduced search space. The proposed method might be useful to reduce the search space of those kinds of MILP problems that a fast heuristic algorithm is available for finding local optimal solutions. The obtained results using some real test systems show the efficiency of the proposed method. © 2012 Springer-Verlag.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This report describes test results from a full-scale embankment pilot study conducted in Iowa. The intent of the pilot project was to field test and refine the proposed soil classification system and construction specifications developed in Phase II of this research and to evaluate the feasibility of implementing a contractor quality control (QC) and Iowa DOT quality assurance (QA) program for earthwork grading in the future. One of the primary questions for Phase III is “Was embankment quality improved?” The project involved a “quality conscious” contractor, well-qualified and experienced Iowa Department of Transportation field personnel, a good QC consultant technician, and some of our best soils in the state. If the answer to the above question is “yes” for this project, it would unquestionably be “yes” for other projects as well. The answer is yes, the quality was improved, even for this project, as evidenced by dynamic cone penetrometer test data and the amount of disking required to reduce the moisture content to within acceptable control limits (approximately 29% of soils by volume required disking). Perhaps as important is that we know what quality we have. Increased QC/QA field testing, however, increases construction costs, as expected. The quality management-earthwork program resulted in an additional $0.03 per cubic meter, or 1.6%, of the total construction costs. Disking added about $0.04 per cubic meter, or 1.7%, to the total project costs. In our opinion this is a nominal cost increase to improve quality. It is envisioned that future contractor innovations have the potential for negating this increase. The Phase III results show that the new soil classification system and the proposed field test methods worked well during the Iowa Department of Transportation soils design phase and during the construction phase. Recommendations are provided for future implementation of the results of this study by city, county, and state agencies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As digital technologies become widely used in designing buildings and infrastructure, questions arise about their impacts on construction safety. This review explores relationships between construction safety and digital design practices with the aim of fostering and directing further research. It surveys state-of-the-art research on databases, virtual reality, geographic information systems, 4D CAD, building information modeling and sensing technologies, finding various digital tools for addressing safety issues in the construction phase, but few tools to support design for construction safety. It also considers a literature on safety critical, digital and design practices that raises a general concern about ‘mindlessness’ in the use of technologies, and has implications for the emerging research agenda around construction safety and digital design. Bringing these strands of literature together suggests new kinds of interventions, such as the development of tools and processes for using digital models to promote mindfulness through multi-party collaboration on safety

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – The construction industry is a very important part of the Malaysian economy. The government's aim is to make the industry more productive, efficient and safe. Small to medium-sized enterprises (SMEs) are at the core of the Malaysian construction industry and account for about 90 per cent of companies undertaking construction work. One of the main challenges faced by the Malaysian construction industry is the ability to absorb new knowledge and technology and to implement it in the construction phase. The purpose of this paper is to consider absorptive capacity in Malaysian construction SMEs in rural areas. Design/methodology/approach – The research was conducted in three stages: first, understanding the Malaysian construction industry; second, a literature review on the issues related to absorptive capacity and discussions with the Construction Industry Development Board (CIDB); and third, multiple case studies in five construction SMEs operating in a rural area to validate the factors influencing absorptive capacity. Findings – Nine key factors were identified influencing absorptive capacity in Malaysian construction SMEs operating in rural areas. These factors involved: cost and affordability; availability and supply; demand; infrastructure; policies and regulations; labour readiness; workforce attitude and motivation; communication and sources of new knowledge and; culture. Originality/value – The key factors influencing absorptive capacity presented in this paper are based on validation from the case studies in five construction SMEs in Malaysia. The research focuses on how they operate in rural areas; however, the research results have wider application than just Malaysia. The key factors identified as influencing absorptive capacity can serve as a basis for considering knowledge absorption in the wider context by SMEs in other developing countries.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The Time-Of-Flight (TOF) detector of ALICE is designed to identify charged particles produced in Pb--Pb collisions at the LHC to address the physics of strongly-interacting matter and the Quark-Gluon Plasma (QGP). The detector is based on the Multigap Resistive Plate Chamber (MRPC) technology which guarantees the excellent performance required for a large time-of-flight array. The construction and installation of the apparatus in the experimental site have been completed and the detector is presently fully operative. All the steps which led to the construction of the TOF detector were strictly followed by a set of quality assurance procedures to enable high and uniform performance and eventually the detector has been commissioned with cosmic rays. This work aims at giving a detailed overview of the ALICE TOF detector, also focusing on the tests performed during the construction phase. The first data-taking experience and the first results obtained with cosmic rays during the commissioning phase are presented as well and allow to confirm the readiness state of the TOF detector for LHC collisions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O presente trabalho teve como principal objectivo a aplicação dos conceitos adquiridos nas unidades curriculares da licenciatura e do mestrado. Nesse sentido tomou-se a opção da realização de um projecto de execução de uma obra de arte para o trabalho final de mestrado, realizado num conceituado gabinete de projecto de pontes e viadutos, com vista à obtenção do grau de mestre. O projecto refere-se a uma obra de arte que se insere num nó rodoviário de ligação entre duas auto-estradas que, dados os seus condicionamentos de perfil, quer longitudinal quer transversal, e implantação no local, pode ser considerada uma obra de arte especial. O processo de análise foi feito com recurso ao programa de cálculo automático SAP2000®, tendo em conta os regulamentos nacionais aplicáveis a estruturas de pontes e os Eurocódigos em fase de implementação em Portugal. O projecto de execução, objecto deste trabalho, foi realizado em função de uma metodologia de construção simples, que é o recurso à utilização, por fases, de cimbres apoiados no solo. A optimização das fases de construção é um factor condicionante na análise e concepção da obra de arte deste projecto, pelo que se procura obter uma relação optimizada entre o rendimento de construção e o funcionamento estrutural da obra de arte, de forma a garantir a segurança da estrutura e o conforto dos utilizadores a longo prazo.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Mestre em Engenharia Civil - Especialização em Estruturas

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este relatório apresenta o estágio curricular relativo ao curso de mestrado em engenharia civil na área de especialização de estruturas. O estágio decorreu no grupo O Feliz, S.A, uma metalomecânica sedeada em Braga. No âmbito do estágio, foi efetuada uma pesquisa e de seguida um projeto real aplicando a metodologia Building Information Modeling. Inicialmente, será feita uma apresentação da empresa e definidos os objetivos propostos para o estágio. Seguidamente, será apresentada toda a pesquisa realizada sobre o BIM para poder, seguidamente, realizar um projeto real utilizando esta metodologia, proposta pela empresa. Posteriormente é apresentado o projeto realizado com a metodologia BIM e todo o seu processo até chegar à sua construção. Por último, são apresentadas algumas das obras que estavam em curso durante a realização do presente trabalho e que houve a oportunidade de acompanhar, refletindo a experiência adquirida na área, durante o desenvolvimento do estágio.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Os sistemas de monitorização de estruturas fornecem diversas vantagens, não só no que diz respeito à durabilidade da obra, ao aumento da segurança e do conhecimento relativamente ao comportamento das estruturas ao longo do tempo, à otimização do aspeto estrutural, bem como aos aspetos económicos do processo de construção e manutenção. A monitorização deve realizar-se durante a fase de construção e/ou de exploração da obra para permitir o registo integral do seu comportamento no meio externo. Deve efetuar-se de forma contínua e automática, executando intervenções de rotina para que se possa detetar precocemente sinais de alterações, respetivamente à segurança, integridade e desempenho funcional. Assim se poderá manter a estrutura dentro de parâmetros aceitáveis de segurança. Assim, na presente dissertação será concebido um demonstrador experimental, para ser estudado em laboratório, no qual será implementado um sistema de monitorização contínuo e automático. Sobre este demonstrador será feita uma análise de diferentes grandezas em medição, tais como: deslocamentos, extensões, temperatura, rotações e acelerações. Com carácter inovador, pretende-se ainda incluir neste modelo em sintonia de medição de coordenadas GNSS com o qual se torna possível medir deslocamentos absolutos. Os resultados experimentais alcançados serão analisados e comparados com modelos numéricos. Conferem-se os resultados experimentais de natureza estática e dinâmica, com os resultados numéricos de dois modelos de elementos finitos: um de barras e outro de casca. Realizaram-se diferentes abordagens tendo em conta as características identificadas por via experimental e calculadas nos modelos numéricos para melhor ajuste e calibração dos modelos numéricos Por fim, recorre-se a algoritmos de processamento e tratamento do respetivo sinal com aplicação de filtros, que revelam melhorar com rigor o sinal, de forma a potenciar as técnicas de fusão multisensor. Pretende-se integrar o sinal GNSS com os demais sensores presentes no sistema de monitorização. As técnicas de fusão multisensor visam melhor o desempenho deste potencial sistema de medição, demonstrando as suas valências no domínio da monitorização estrutural.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O presente trabalho foi desenvolvido na obra do Aproveitamento Hidroelétrico de Foz Tua onde a autora teve oportunidade de realizar o estágio curricular junto da equipa da Fiscalização no período de 2 de Fevereiro de 2015 a 31 de Julho de 2015. A elaboração do presente trabalho pretende transmitir conhecimentos adquiridos relacionados com a constituição de um Aproveitamento Hidroelétrico, os tipos de barragens existentes, monitorização e controlo da segurança da estrutura da Barragem, controlo de qualidade de betão e o processo construtivo de uma Barragem. A construção da Barragem do Aproveitamento Hidroelétrico de Foz Tua tem sido realizada através do método tradicional, que consiste na aplicação de betão convencional compactado por vibração interna. Ao longo deste processo, foram aplicadas diversas técnicas construtivas, nomeadamente: escavação, betonagem, refrigeração artificial, injeção de juntas e tratamento de fundações. Neste trabalho foram ainda analisados os cuidados de segurança necessários neste tipo de estruturas, tendo como base o Regulamento de Segurança de Barragens. Este regulamento define as regras a seguir durante a execução da barragem e a monotorização que deve ser efetuada à mesma, permitindo assim o controlo da segurança da estrutura na sua construção e vida útil. É necessário ainda existir um controlo da qualidade, produção e aplicação do betão na estrutura de modo a aumentar a segurança, qualidade e durabilidade da mesma.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia Civil

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper we analyse the economic impact of a new museum (the Gaudí Centre) on the local economy of Reus, a city in the province of Tarragona (southern Catalonia). We use a Keynesian income multiplier model to evaluate the effects of this new cultural venue on local income. In our calculation of the economic impact we distinguish between two phases: the construction phase and the exploitation phase. Our results show the important income impact of this cultural investment on the local economy.