775 resultados para Construction industry Management Data processing


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The outcome of this research is an Intelligent Retrieval System for Conditions of Contract Documents. The objective of the research is to improve the method of retrieving data from a computer version of a construction Conditions of Contract document. SmartDoc, a prototype computer system has been developed for this purpose. The system provides recommendations to aid the user in the process of retrieving clauses from the construction Conditions of Contract document. The prototype system integrates two computer technologies: hypermedia and expert systems. Hypermedia is utilized to provide a dynamic way for retrieving data from the document. Expert systems technology is utilized to build a set of rules that activate the recommendations to aid the user during the process of retrieval of clauses. The rules are based on experts knowledge. The prototype system helps the user retrieve related clauses that are not explicitly cross-referenced but, according to expert experience, are relevant to the topic that the user is interested in.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to investigate the cost management practices of building industry companies of Parana that follow the typology of Porter's strategies. The sample comprises member companies of the Association of Construction Industries of the State of Parana (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis of the data allowed us to identify two groups of cost management practices. Analyses suggest equality between the adopted cost management practices and the Cost Control Planning (CCP) practices among the companies of the Group 1, regardless of the generic strategy adopted. The companies of the Group 2 that adopted the differentiation strategy seem to use mainly the ACR cost management practice. Our findings differ from those obtained by Chenhall insofar as companies that adopt low cost strategies tend to use managerial controls focused on cost control and rigid budgetary controls.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has long been considered as highly fragmented and non-collaborative industry. This fragmentation sprouted from complex and unstructured traditional coordination processes and information exchanges amongst all parties involved in a construction project. This nature coupled with risk and uncertainty has pushed clients and their supply chain to search for new ways of improving their business process to deliver better quality and high performing product. This research will closely investigate the need to implement a Digital Nervous System (DNS), analogous to a biological nervous system, on the flow and management of digital information across the project lifecycle. This will be through direct examination of the key processes and information produced in a construction project and how a DNS can provide a well-integrated flow of digital information throughout the project lifecycle. This research will also investigate how a DNS can create a tight digital feedback loop that enables the organisation to sense, react and adapt to changing project conditions. A Digital Nervous System is a digital infrastructure that provides a well-integrated flow of digital information to the right part of the organisation at the right time. It provides the organisation with the relevant and up-to-date information it needs, for critical project issues, to aid in near real-time decision-making. Previous literature review and survey questionnaires were used in this research to collect and analyse data about information management problems of the industry – e.g. disruption and discontinuity of digital information flow due to interoperability issues, disintegration/fragmentation of the adopted digital solutions and paper-based transactions. Results analysis revealed efficient and effective information management requires the creation and implementation of a DNS.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The rising problems associated with construction such as decreasing quality and productivity, labour shortages, occupational safety, and inferior working conditions have opened the possibility of more revolutionary solutions within the industry. One prospective option is in the implementation of innovative technologies such as automation and robotics, which has the potential to improve the industry in terms of productivity, safety and quality. The construction work site could, theoretically, be contained in a safer environment, with more efficient execution of the work, greater consistency of the outcome and higher level of control over the production process. By identifying the barriers to construction automation and robotics implementation in construction, and investigating ways in which to overcome them, contributions could be made in terms of better understanding and facilitating, where relevant, greater use of these technologies in the construction industry so as to promote its efficiency. This research aims to ascertain and explain the barriers to construction automation and robotics implementation by exploring and establishing the relationship between characteristics of the construction industry and attributes of existing construction automation and robotics technologies to level of usage and implementation in three selected countries; Japan, Australia and Malaysia. These three countries were chosen as their construction industry characteristics provide contrast in terms of culture, gross domestic product, technology application, organisational structure and labour policies. This research uses a mixed method approach of gathering data, both quantitative and qualitative, by employing a questionnaire survey and an interview schedule; using a wide range of sample from management through to on-site users, working in a range of small (less than AUD0.2million) to large companies (more than AUD500million), and involved in a broad range of business types and construction sectors. Detailed quantitative (statistical) and qualitative (content) data analysis is performed to provide a set of descriptions, relationships, and differences. The statistical tests selected for use include cross-tabulations, bivariate and multivariate analysis for investigating possible relationships between variables; and Kruskal-Wallis and Mann Whitney U test of independent samples for hypothesis testing and inferring the research sample to the construction industry population. Findings and conclusions arising from the research work which include the ranking schemes produced for four key areas of, the construction attributes on level of usage; barrier variables; differing levels of usage between countries; and future trends, have established a number of potential areas that could impact the level of implementation both globally and for individual countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Supply chain management and knowledge management have emerged as two distinct business philosophies in the last decade. Both are making rapid inroads into the construction industry. The premise of this paper is that knowledge management would make it possible for all the trading partners in a supply chain to reap benefits. Current research in knowledge management in the construction industry is generally targeting those big organisations that are main contractors. This has restricted the scope of knowledge management, and limits the benefits to a few, rather than the whole industry. If the construction industry as a whole is to prosper and improve its productivity, strategies for knowledge management strategy at the industry level must be established. This paper argues the case for extending the scope of knowledge management across the full extent of the supply chain, and attempts to identify the benefits that may arise out of sharing knowledge across the supply chain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is a fragmented and profoundly competitive industry with high levels of subcontracting resulting in complex supply chain formations. Traditional methods and forms of communication are being proven as inefficient and losing their charm while participants face heavy volumes of communications that often occurs on a daily basis between trading partners in a supply chain on projects. Information Communication Technologies (ICT), due to their robustness and the ability to quickly disseminate data/information, have the capacity to address highlighted communication issues in a structured and an efficient manner. Timesavings produced by these can be directly translated in terms of productivity gain. This paper presents perceptions of subcontractors working in the construction industry in Melbourne Australia on the use of ICT obtained through an exploratory study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the early 1980s, researchers and practitioners in the organisational and management fields have presumed a link between organisational, or corporate, culture and organisational performance. Whilst many believe this exists, other authors have been critical of the validity of such studies. Part of this doubt stems from a reliance on measures of organisational performance that are based purely on financial measures of business growth. Using the construction industry as the subject of his research, Vaughan Coffey traces the development of the literature on organisational culture and business effectiveness and investigates the culture–performance link using a new and highly objective measure of company performance and an evaluation of organisational culture, which is largely behaviourally-based. Providing a theoretical contribution to the field, this work shows that various cultural traits appear to be closely linked to objectively measured organisational effectiveness. This book will be valuable to professionals and researchers in the fields of management and public policy. It indicates directions for construction companies to develop and change, and in doing so strengthen their chances of remaining strong when opportunities for work might deplete and only the most successful companies will be able to survive.---- Selected Contents: 1. An Introduction to Organizations, Culture, Performance and Construction 2. Organizations, Culture and Climate 3. Organizational Culture Studies 4. Measuring Organizational Performance and Effectiveness 5. Organizational Culture and Effectiveness – The Link Between Them 6. Research on the Relationship between Organizational Culture and Performance in Hong Kong Construction Companies 7. The Hong Kong Experiment – Presentation of Demographic Data, Overall Results and some Descriptive and Qualitative Analysis 8. Detailed Statistical Analysis of the Docs and Pass Data in Relation to the Major Research Questions 9. Four Hong Kong Construction Mini-Case Studies 10. Conclusions and Future Research Directions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Anecdotal evidence from the infrastructure and building sectors highlights issues of drugs and alcohol and its association with safety risk on construction sites. Operating machinery and mobile equipment, proximity to live traffic together with congested sites, electrical equipment and operating at heights conspire to accentuate the potential adverse impact of drugs and alcohol in the workplace. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgement from drugs and alcohol. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients; unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. This study has four key objectives. Firstly, using the standard World Health Organisation AUDIT, a national qualitative and quantitative assessment of the use of drugs and alcohol will be carried out. This will build upon similar studies carried out in the Australian energy and mining sectors. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Thirdly, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. Finally, an implementation plan will be developed from data gathered from both managers and construction employees. Such an approach stands to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This paper will provide an overview of the background and significance of the study as well as outlining the proposed methodology that will be used to evaluate the safety impacts of alcohol and other drugs in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.