883 resultados para Construction Project Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.