997 resultados para Construction Delay


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Nowadays, construction delay disputes often end up on the arbitration route where the delay experts appointed by the parties advise the tribunal on the extension of times entitlements of the parties. For this purpose, the identification and quantification of concurrent and pacing delays are integral aspects of resolving these disputes using a proper delay analysis methodology. The aim of the study is therefore, threefold. Firstly, the available literature on the concurrent and pacing delays are analyzed in detail to establish the principles for the evaluation of the concurrency and pacing delays. Secondly, a robust delay analysis methodology called ‘windows impact/update method’ is explained often used by the experts for the effective quantification of concurrent and pacing delays. This methodology is an improved version of time impact analysis and normal windows analysis. For better demonstration, the explanation of the methodology is facilitated with the help of a typical case study analysis. Finally, the principles of concurrency and pacing, as explained in the literature review, are promptly applied to the case study results to show the applicability of the analysis method on any types of delay disputes. The study shows the effectiveness of the windows impact/update method for the quantification of the concurrent and pacing delays.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The addition of lime into soils has been widely used to stabilize the expansive sub-grade soils when the road pavements are constructed on them. It is common practice to apply a half of the required lime amount and allow a certain time period for lime to react with soils (Amelioration period) before applying the rest of lime and compacting the sub-grade. The optimum amelioration period is essential to minimize the construction delay and to gain the higher strength. In this study, two different expansive soils procured from two different locations in the state of Queensland in Australia were first mixed with different lime contents. A soil mixed with a particular lime content was compacted at different amelioration periods (e.g.: 0, 6, 12, 18, 24 hrs) to obtain soil samples to measure the Unconfined Compressive Strength (UCS). The results suggested that for a given amelioration period, UCS increased with the increase in lime content. The optimum amelioration period could be within 14~17 hours for most of the lime contents in tested soils. This could suggest that the current 24-48 hour amelioration period specified by the Queensland Department of Transport and Main roads could be reduced.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

During tunnel constriction the classification of rock mass is widely used in tunnel design and construction. Moreover it offers the base information about tunnel investment and security. The quick classification of rock mass is very important for not delaying tunnel construction. Nowadays the tunnel engineers usually use initial survey files which are obtained by probe drilling to design a tunnel. It brings the problem that initial surrounding rock classification is usually much different from the real condition during the tunnel construction. Because initial surrounding rock lack credibility, it need us to make real time surrounding rock classification during the tunnel construction, and feed back the result to designers and constructors. Therefore, to find a quick wall rock classification method is very important not only for the time limit for a project but also for not delaying tunnel construction. Not all but many tunnels and underground constructions do suffer form collapse during the period of construction. Although accidental collapse in a large project in civil and geotechnical engineering sometimes appears to be a local event, if it occurred, it can bring about casualties, disrupted,production, construction delay, environmental damage, capital cost etc,therefore, it has been a difficult problem ,both in theory and in practice, establishing how to prevent underground structures form collapse and how to handle such an event in case in occurs. It is important to develop effective solutions and technical measures to prevent and control the collapse. According to the tunnel collapse occurred in Cheng De this paper analyze the main collapse mechanism leading to tunnel collapse and summon up the disposal method when collapse happened. It may be useful for tunnel construction in Cheng De in future. This paper is base on tunnel surrounding rock classification and tunnel support tasks during the tunnel construction in Cheng De area. It aims at solving 4 important problems in tunnel design and construction. 1) The relationship between rock rebound strength and rock single axle compression strength. First we go to the face wall and do rebound test on the tunnel face, then we chose some pieces of rock and do point loading test. Form the tests record we try to find the relationship between rock rebound strength and rock single axle compression strength. 2) The relationship between the value [BQ] and the value Q. First in order to obtain the information of rock character, rock strength, degree of weathering, the structure of rock mass, the joint condition, underground water condition and so on, we go to the tunnel face to do field investigation. And then we use two kinds of rock classification method to make surrounding rock classification. Base on the works above, finally we analyze the relationship between the value [BQ] and the value Q. 3) Sum up the mechanism leading to tunnel collapse and it disposal method in Cheng De area According to the tunnel collapse occurred in Cheng De this paper analyze the main reasons leading to the tunnel collapse and sum up the disposal method when collapse happened. 4) Obtain the properties of steel frame grid by numerical simulation. First we establish the 3D numeral model of steel frame grid by ADINA, and then find the mechanics properties by numerical simulation in ADINA. Second Based on the rock mass geological structure model, we established steel frame grid numeral model which is installed in the tunnel by FLAC3D and simulated the progress of tunnel construction. We hope that the support effect in tunnel can be evaluated from the numerical simulation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La construcción es una de las industrias que mayores accidentes laborales genera, en esta investigación se realizó un análisis retrospectivo para determinar si existe alguna relación entre la ocurrencia de accidentes y la fecha de entrega de una meta, debido al incremento en la cantidad de trabajo expresado por la cantidad de días y horas extras trabajados, se cuenta con información de la accidentalidad de cinco empresas constructoras de un gran proyecto vial en Colombia en los años de 2012 y 2013. Se analizó la información correspondiente a la nómina de las mismas empresas, con el valor de la nómina mensual, el valor de las incapacidades mensuales y la cantidad de trabajadores por cada empresa en cada periodo. El manejo de los datos se hizo con EXCEL y el análisis estadístico con STATA 11.1, se usó la correlación de Spearman para encontrar la relación entre la cantidad de accidentes acumulados y: la cantidad acumulada de días trabajados en cada mes, la cantidad acumulada de horas extras trabajadas mensualmente y el costo acumulado en porcentaje de la nómina mensual, encontrándose en todos los casos una relación lineal. Por otra parte, se realizó una prueba binomial para establecer la relación de la fecha de entrega de la meta con la accidentalidad 30 días antes y después, encontrando que la accidentalidad aumenta en la proximidad previa a la entrega de la meta

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This report summarizes Iowa results of a five year, Pooled Fund study involving the Wisconsin, Iowa, and Minnesota Departments of Transportation (DOTs) designed to 1) assess the public's perceptions of the DOTs' pavement improvement strategies and 2) develop customer-based thresholds of satisfaction with pavements on rural two lane highways in each state as related to the DOTs' physical indices, such as pavement ride and condition. The primary objective was to seek systematic customer input to improve the DOTs' pavement improvement policies by 1) determining how drivers perceive the DOTs' pavements in terms of comfort and convenience but also in terms of other tradeoffs the DOTs had not previously considered, 2) determining relationships between perceptions and measured pavement condition thresholds (including a general level of tolerance of winter ride conditions in two of the states), and 3) identifying important attributes and issues that may not have been considered in the past. Secondary objectives were 1) to provide a tool for systematic customer input in the future and 2) to provide information which can help structure public information programs. A University of Wisconsin-Extension survey lab conducted the surveys under the direction of a multi-disciplinary team from Marquette University. Approximately 4500 drivers in the 3 states participated in the 3 phases of the project. Researchers conducted 6 focus groups in each state, approximately 400 statewide telephone interviews in each state and 700-800 targeted telephone interviews in each state. Approximately 400 winter ride interviews were conducted in Wisconsin and Minnesota. A summary of the method for each survey is included. In Phase I, focus groups were conducted with drivers to get an initial indication of what the driving public believes in regards to pavements and to frame issues for inclusion in the more representative statewide surveys of drivers conducted in Phase II. Phase II interviews gathered information about improvement policy tradeoff issues and about preliminary thresholds of improvement in terms of physical pavement indices. In Phase III, a two step recruitment and post-drive interview procedure yielded thresholds of ride and condition index summarized for each state. Results show that, in general, the driving public wants longer lasting pavements and are willing to pay for them. They want to minimize construction delay, improve entire sections of highway at one time but they dislike detours, and prefer construction under traffic even if it stretches out construction time. Satisfaction with pavements does not correlate directly to a high degree with physical pavement indices, but was found instead to be a complex, multi-faceted phenomenon. A psychological model was applied to explain satisfaction to a respectable degree for the social sciences. Results also indicate a high degree of trust in the 3 DOTs which is enhanced when the public is asked for input on specific highway segments. Conclusions and recommendations include a 3-step methodology for other state studies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a new approach for delay-dependent robust H-infinity stability analysis and control synthesis of uncertain systems with time-varying delay. The key features of the approach include the introduction of a new Lyapunov–Krasovskii functional, the construction of an augmented matrix with uncorrelated terms, and the employment of a tighter bounding technique. As a result, significant performance improvement is achieved in system analysis and synthesis without using either free weighting matrices or model transformation. Examples are given to demonstrate the effectiveness of the proposed approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thin bed technology for clay/ concrete masonry is gaining popularity in many parts of the developed economy in recent times through active engagement of the industry with the academia. One of the main drivers for the development of thin bed technology is the progressive contraction of the professional brick and block laying workforce as the younger generation is not attracted towards this profession due to the general perception of the society towards manual work as being outdated in the modern digital economy. This situation has led to soaring cost of skilled labour associated with the general delay in completion of construction activities in recent times. In parallel, the advent of manufacturing technologies in producing bricks and blocks with adherence to specified dimensions and shapes and several rapid setting binders are other factors that have contributed to the development of thin bed technology. Although this technology is still emerging, especially for applications to earthquake prone regions, field applications are reported in Germany for over a few decades and in Italy since early 2000. The Australian concrete masonry industry has recently taken keen interest in pursuing research with a view to developing this technology. This paper presents the background information including review of literature and pilot studies that have been carried out to enable planning of the development of thin bed technology. The paper concludes with recommendations for future research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The decisions in Perdis v The Nominal Defendant [2003] QCA 555, Miller v the Nominal Defendant [2003] QCA 558 and Piper v the Nominal Defendant [2003] QCA 557 were handed down contemporaneously by the Queensland Court of Appeal on December 15 2003. They consider important issues as to the construction of key provisions of the Motor Accident Insurance Act 1994 (Qld)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, we generalize the existing rate-one space frequency (SF) and space-time frequency (STF) code constructions. The objective of this exercise is to provide a systematic design of full-diversity STF codes with high coding gain. Under this generalization, STF codes are formulated as linear transformations of data. Conditions on these linear transforms are then derived so that the resulting STF codes achieve full diversity and high coding gain with a moderate decoding complexity. Many of these conditions involve channel parameters like delay profile (DP) and temporal correlation. When these quantities are not available at the transmitter, design of codes that exploit full diversity on channels with arbitrary DIP and temporal correlation is considered. Complete characterization of a class of such robust codes is provided and their bit error rate (BER) performance is evaluated. On the other hand, when channel DIP and temporal correlation are available at the transmitter, linear transforms are optimized to maximize the coding gain of full-diversity STF codes. BER performance of such optimized codes is shown to be better than those of existing codes.