976 resultados para Construction Activity


Relevância:

100.00% 100.00%

Publicador:

Resumo:

At head of title: U. S. Department of commerce. Daniel C. Roper, secretary. Bureau of foreign and domestic commerce. Alexander V. Dye, director ...

Relevância:

70.00% 70.00%

Publicador:

Resumo:

It is questionable whether activities like construction, including maintenance and repair, can be considered a single entity or industry - on the basis that different sectors of construction/maintenance use fundamentally distinct resource and skill bases. This creates a number of issues including the development of competition and reform policy. de Valance deployed the Structure-Conduct-Performance model (SCP) to delineate sectors of new/installation construction activity and, in doing so, proposes that there exists multiple market structures in a given project. The purpose of this paper is to apply the SCP model to a different sector of construction activity, that is air conditioning maintenance and test de Valance's proposition concerning the existence of multiple market structures in a supply chain but this time to a built facility. The research method combines secondary data concerning the "Structure" component of the SCP model and primary data with regard to the "Conduct" and "Performance" parts of the SCP model. The results provide further support (beyond de Valance's analysis of new/installation activity) that a sector system approach using the SCP model is a more effective way to analyse market structures in construction activity. This paper also supports de Valance's proposition concerning the existence of multiple market structures in a supply chain to a project/facility.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

It is generally accepted that there is a close relationship between property investment and construction activity. The construction sector plays a crucial role in economic development, especially for a developing nation such as Malaysia. However, the volume of new properties added to the property market is only a fraction of the total volume of the property market. Is the conventional assumption of the relationship between property investment and construction supported by empirical data? This paper revisits the tripartite relationships between economic growths, property investment and construction activities with official Malaysian 2000Q1-2010Q4 quarterly time series data. The Granger causality tests are used to establish the causality runs from the GDP to the value of property transactions, and the growth of construction activities to GDP growth. The result is expected to be useful for policymakers and industrial practitioners in formulating industrial policies and corporate strategies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The specific objectives were to: WATER QUALITY 1. To measure the water physical variables as indicators of environmental conditions in the upstream and downstream transects of Kalange (1) and Buyala (2), respectively, 2. To determine the concentrations of total suspended solids as a major constituent likely to be released into the waters at any time during the construction activities, by comparing the concentrations at the two transects. FISH CATCH 1. To follow up trends in fish catch as construction activity progresses, and to precision of the estimate; 2. To estimate the prevailing fish catch rates, total fish catches and the total value of the fish catch to the local fishers at the two transects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The European construction industry is supposed to consume the 40% of the natural European resources and to generate the 40% of the European solid waste. Conscious of the great damage being suffered by the environment because of construction activity, this work tries to provide the building actors with a new tool to improve the current situation. The tool proposed is a model for the comprehensive evaluation of construction products by determining their environmental level. In this research, the environmental level of a construction product has been defined as its quality of accomplishing the construction requirements needed by causing the minimum ecological impact in its surrounding environment. This information allows building actors to choose suitable materials for building needs and also for the environment, mainly in the project stage or on the building site, contributing to improve the relationship between buildings and environment. For the assessment of the environmental level of construction products, five indicators have been identified regarding their global environmental impact through the product life cycle: CO2 emissions provoked during their production, volume and toxicity of waste generated on the building site, durability and recycling capacity after their useful life. Therefore, the less environmental impact one construction product produces, the higher environmental level performs. The model has been tested in 30 construction products that include environmental criteria in their description. The results obtained will be discussed in this article. Furthermore, this model can lay down guidelines for the selection of ecoefficient construction products and the design of new eco-competitive and eco-committed ones

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

campaign to oppose projects proposed in their local community. The social constructionist perspective advocates that these motivations are driven by activists’ interpretation of reality, such that activists will assign multiple meanings to and frame environmental issues in a way that reflects their view of reality. Past research suggest that these are also influenced by patterns of shared meaning and interpretation that develop over time in protest movements that shape activists’ perceptions of the environmental risks and impacts associated with construction activity. This paper explores the role of gender distinctions in shaping perceptions of environmental risk and how this affects their framing of the environmental, social, cultural/ historical impacts associated with a construction project. Using Snow and Benford’s (1988) 3-prong analytical tool for framing: diagnostic framing, prognostic framing and motivational framing, this paper presents findings from the content analysis of in-depth interviews of 24 activists protesting against a highly controversial housing project in the greater Sydney metropolitan area. The research adopts a single case study approach, and is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24-hour community picket in Australia.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Local communities are vulnerable to the potential environmental risks associated with construction activity. Currently, little is understood about how perceptions of environmental risks are shaped and spread within a community. A better understanding of this process can help bridge the gap between developers and communities and bring about more sustainable development practices. This paper reports a research methodology which uses social contagion theory to investigate this process. The research adopts a single case study approach of a highly controversial housing project in the greater Sydney metropolitan area. The case study is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24 hour community picket in the New South Wales.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper analyses the profits from 221 construction projects undertaken by an Australian building firm in the period 1910–1938 and examines the factors that influence the firm's profit levels. This involves a series of multiple regression analyses with three dependent variables representing profit and 26 independent variables representing economic conditions and project characteristics. From these, 11 models are derived of which two are chosen as having the best explanatory power in explaining approximately 72% of the variability in profit levels movements. The results show that unemployment, interest rates, level of construction activity in the state, change of wage level, inflation rate of building material and project value significantly influenced the firm's profit level during the period.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

For any construction activity in expansive soils, determination of swelling pressure/heave is an essential step. Though many attempts have been made to develop laboratory procedures by using the laboratory one-dimensional oedometer to determine swelling pressure of expansive soils, they are reported to yield varying results. The main reason for these variations could be heterogeneous moisture distribution of the sample over its thickness. To overcome this variation the experimental procedure should be such that the soil gets fully saturated. Attempts were made to introduce vertical sand drains in addition to the top and bottom drains. In this study five and nine vertical sand drains were introduced to experimentally find out the variations in the swell and swelling pressure. The variations in the moisture content at middle, top, and bottom of the sample in the oedometer test are also reported. It is found that swell-load method is better as compared to zero-swell method. Further, five number of vertical sand drains are found to be sufficient to obtain uniform moisture content distribution.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Intensive archaeological investigation was undertaken on an urban backlot in Annapolis, Maryland. Fieldwork was conducted on behalf of Historic Annapolis Foundation for the property's owners, King and Cornwall, Inc. Supplemental documentary research, an evaluation of existing conditions on the property, and below-ground excavation of a 35 X 70 ft. urban backlot were conducted. While the project was not a Section 106 compliance effort, the field methods and rationale for the site's investigation are comparable to those of standard Phase II site evaluations. Historical documentation attested to the fact that the 22 West Street Backlot, located along the western most edge of the Historic District of Annapolis, Maryland, had seen development and occupation since the first quarter of the eighteenth century. A substantial brick structure was known to have occupied the property in a series of altered forms for much of that period. This structure served a variety of purposes over time: a private residence in the eighteenth century, a boarding house in the nineteenth century (known as the National Hotel), a duplex in the early twentieth century, half of which remained in use until the structure was entirely razed in the 1970s after destruction by fire. Recovery and analysis of site formation processes (i.e., both cultural and natural transformations of the buried remains) indicated that sections of the site were disturbed to a depth of six feet. In contrast to what initially seemed a poor prognosis for site integrity, other areas of the backlot revealed numerous intact historical features and deposits. Structural remains from the dwelling and its associated outbuildings, additions, and attendant trash deposits were recovered. What was initiated as a program of limited testing evolved into a larger-scale undertaking that made use of largely hand-excavated units in conjunction with machine-assisted stripping of areas demonstrated to contain from four to six-foot deep sterile layers of fill. The current investigations provided a window into a portion of the city and period in its history not documented archaeologically. Moreover, this project provided valuable insight into the archaeology of the homelot within a lightly industrialized, urban context. Evidence was recovered of shifts in the layout and arrangement of the houselot as well as changing relations between individuals and the workplace--all within an urban context--an issue defined elsewhere in the archaeological literature as a significant one. No further investigations are recommended for the site, however, further analysis and interpretation of materials recovered are ongoing. In the event that the site were to undergo development, monitoring of any construction activity is recommended.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Actualmente las empresas requieren estrategias innovadoras, que permitan gestionar de forma integral, optimizando los recursos y maximizando los resultados. Siendo el objetivo del presente trabajo de investigación, diseñar un instrumento de gestión integral (gestión de la calidad, ambiental, seguridad y salud ocupacional) para el sector construcción en Cusco. Se realizó un análisis actual de la actividad de construcción, se planteó a diferencia de otras propuestas, el diseño que inicia con el diagnóstico, planificación, organización, ejecución, supervisión y optimización del sistema integral. Los resultados están expresados en el diagnóstico de los 3 sistemas, información clave, para el planteamiento y propuesta de las etapas posteriores; estructurando el planteamiento de los subprogramas basados en el diagnóstico integral, para finalmente determinar los lineamientos estratégicos, de implementación, evaluación y verificación del sistema, teniendo en cuenta la norma ISO 9001: 2008, ISO 14001:2004 y OSHAS 18001:2007; así como la legislación vigente para el Perú.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil Especialização em Edificações