996 resultados para Connection Design


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since privatisation, maintenance of DNO LV feeder maximum demand information has gradually demised in some Utility Areas, and it is postulated that lack of knowledge about 11kV and LV electrical networks is resulting in a less economical and energy efficient Network as a whole. In an attempt to quantify the negative impact, this paper examines ten postulated new connection scenarios for a set of real LV load readings, in order to find the difference in design solutions when LV load readings were and were not known. The load profiles of the substations were examined in order to explore the utilisation profile. It was found that in 70% of the scenarios explored, significant cost differences were found. These cost differences varied by an average of 1000%, between schemes designed with and without load readings. Obviously, over designing a system and therefore operating more, underutilised transformers becomes less financially beneficial and less energy efficient. The paper concludes that new connection design is improved in terms of cost when carried out based on known LV load information and enhances the case for regular maximum feeder demand information and/or metering of LV feeders. © 2013 IEEE.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Thesis (Ph.D.)--University of Washington, 2016-06

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Backgroud: The influence of diamond-like-carbon (DLC) films on bacterial leakage through the interface between abutments and dental implants of external hexagon (EH) and internal hexagon (IH) was evaluated. Film deposition was performed by PECVD (Plasma Enhanced Chemical Vapor Deposition). Sets of implants and abutments (N=180, n=30) were divided according to the connection design and the treatment of the abutment base: (1) no treatment (control); (2) DLC film deposition, and (3) Ag-DLC film deposition. Under sterile conditions, 1 µL of Enterococcus faecalis was inoculated inside the implants, and abutments were tightened. The sets were tested for immediate external contamination, suspended in test tubes containing sterile culture broth, and followed-up for five days. Turbidity of the broth indicated bacterial leakage. At the end of the period, the abutments were removed and the internal content of the implants was collected with paper points and plated in Petri dishes. They were incubated for 24 h for bacterial viability assessment and colony-forming unit (CFU) counting. Bacterial leakage was analyzed by Chi-square and Fisher exact tests (α=5%). The percentage of bacterial leakage was 16.09% for EH implants and 80.71% for IH implants (P<0.0001). The bacterial load was higher inside these implants (P=0.000). The type of implant significantly influenced the results (P=0.000), whereas the films did not (P=0.487). We concluded that: (1) IH implants showed a higher frequency of bacterial leakage and (2) the DLC and Ag-DLC films did not significantly reduce the frequency of bacterial leakage and bacteria load inside the implants.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Grid connected PhotoVoltaic (PV) inverters fall into three broad categories — Central, String and Module Integrated Converers (MICs). MICs offer any avantaes in performance and flexibility, but are at a cost disadvantage. Two alternative novel approaches proposed by the author — cascaded dc-dc MICs and bypass dc-dc MICs — integrate a simple non-isolated intelligent dc-dc converter with each PV module to provide the advantages of dc-ac MICs at a lower cost. A suitable universal 150W 5A dc-dc converter design is presented based on two interleaved MOSFET half bridges. Testing shows Zero Voltage Switching (ZVS) keeps losses under 1W for bi-directional power flows up to 15W between two adjacent 12V PV modules for the bypass application, and efficiencies over 94% for most of the operational power range for the cascaded converter application. Based on the experimental results, potential optimizations to further reduce losses are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a study of a specific type of beam-to-column connection for precast concrete structures. Furthermore, an analytical model to determine the strength and the stiffness of the connection, based on test results of two prototypes, is proposed. To evaluate the influence of the strength and stiffness of the connection on the behaviour of the structure, the results of numerical simulations of a typical multi-storey building with semi-rigid connections are also presented and compared with the results using pinned and rigid connections. The main conclusions are: (a) the proposed design model can reasonably evaluate the studied connection strength; (b) the evaluation of strength is more accurate than that of stiffness; (c) for a typical structure, it is possible to increase the number of storeys of the structure from two to four with lower horizontal displacement at the top, and only a small increase of the column base bending moment by replacing the pinned connections with semi-rigid ones; and (d) although there is significant uncertainty in the connection stiffness, the results show that the displacements at the top of the structure, and the column base moments present low susceptibility deviations to this parameter.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The simultaneous design of the steady-state and dynamic performance of a process has the ability to satisfy much more demanding dynamic performance criteria than the design of dynamics only by the connection of a control system. A method for designing process dynamics based on the use of a linearised systems' eigenvalues has been developed. The eigenvalues are associated with system states using the unit perturbation spectral resolution (UPSR), characterising the dynamics of each state. The design method uses a homotopy approach to determine a final design which satisfies both steady-state and dynamic performance criteria. A highly interacting single stage forced circulation evaporator system, including control loops, was designed by this method with the goal of reducing the time taken for the liquid composition to reach steady-state. Initially the system was successfully redesigned to speed up the eigenvalue associated with the liquid composition state, but this did not result in an improved startup performance. Further analysis showed that the integral action of the composition controller was the source of the limiting eigenvalue. Design changes made to speed up this eigenvalue did result in an improved startup performance. The proposed approach provides a structured way to address the design-control interface, giving significant insight into the dynamic behaviour of the system such that a systematic design or redesign of an existing system can be undertaken with confidence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Seismic events are a major factor to consider in structural design of buildings in many countries. With the purpose of saving lives, most of the design codes lead to structural solutions that withstand large seismic actions without collapsing, but without taking into account a possible usage of the structures after the earthquake. As a result, it is necessary to consider the time needed to repair/retrofit the damaged structures (i.e. the downtime) since this period of inactivity may result in huge financial implications for the occupants of the buildings. In order to minimise the damages and simplify repair operations, structural solutions with rocking systems and negligible residual displacements have been developed during the last two decades. Systems with precast concrete rocking walls were studied with the aim of investigat- ing suitable and convenient structural alternatives to minimise the damage in case of an earthquake. Experimental, numerical and analytical analyses on post-tensioned solutions, with and without energy dissipation devices, were carried out in this research. The energy dissipation devices were made from steel angles that were further developed during the research. Different solutions for these devices were experimentally tested under cyclic loading and the results are presented. Numerical and analytical work on steel angles was also carried out. Regarding the concrete rocking wall systems, two concrete rocking wall systems were studied: post-tensioned walls and post-tensioned walls with energy dissipation devices. In the latter, the solution was to fix them externally to the wall, allowing their easy replacement after an earthquake. It is shown that the dissipaters are a viable solution for use in precast concrete rocking wall systems. A building case study is presented. The comparison between a traditional monolithic system and a hybrid solution was carried out, allowing the evaluation of the efficiency of the solution that was developed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado em Design e Marketing

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Alta is the biggest city in the country of Finnmark. The area of study, Bossekop, is situated 4km from the city centre. It has some commercial areas, offices, hotels and housing, mostly single family housing. The most important Norwegian road, E6 goes through Bossekop, there for it has a big traffic flow. The concept builds on the idea of two axis, one local leading from the local sports development area into the centre core, and one on a higher level, the E6. In Bodø, after analysing carefully the surroundings we reached the conclusion that it is posssible to conserve a lot of the green as well as offering the municipalities the chance to develop with several housing typologies. Nature should be preserved and with this connect directly the mountain to the sea, using the existing creek to make the water connection. In order to keep a big part of this land untouched, we suggest that the rest of the site can be developed quite densely in one of the areas and then continuously fading out in direction of the mountains. Finnsnes is an important communication point for the region with its good connections. In that way it is becoming a central point for commerce and leisure. The concept is based on the wish from the municipality of Lenvik to look upon the city’s connection to the surrounding sea and green areas, together with the wish to make the pedestrian access better and the car traffic lighter., and in that way improve the conditions in the city

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation has long recognized that approach slab pavements of integral abutment bridges are prone to settlement and cracking, which manifests as the “bump at the end of the bridge”. A commonly recommended solution is to integrally attach the approach slab to the bridge abutment. Two different approach slabs, one being precast concrete and the other being cast-inplace concrete, were integrally connected to side-by-side bridges and investigated. The primary objective of this investigation was to evaluate the approach slab performance and the impacts the approach slabs have on the bridge. To satisfy the research needs, the project scope involved a literature review, survey of Midwest Department of Transportation current practices, implementing a health monitoring system on the bridge and approach slab, interpreting the data obtained during the evaluation, and conducting periodic visual inspections. Based on the information obtained from the testing the following general conclusions were made: The integral connection between the approach slabs and the bridges appear to function well with no observed distress at this location and no relative longitudinal movement measured between the two components; Tying the approach slab to the bridge appears to impact the bridge; The two different approach slabs, the longer precast slab and the shorter cast-in-place slab, appear to impact the bridge differently; The measured strains in the approach slabs indicate a force exists at the expansion joint and should be taken into consideration when designing both the approach slab and the bridge; The observed responses generally followed an annual cyclic and/or short term cyclic pattern over time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The need for upgrading a large number of understrength bridges in the United States has been well documented in the literature. This manual presents two methods for strengthening continuous-span composite bridges: post-tensioning of the positive moment regions of the bridge stringers and the addition of superimposed trusses at the piers. The use of these two systems is an efficient method of reducing flexural overstresses in undercapacity bridges. Before strengthening a given bridge however, other deficiencies (inadequate shear connection, fatigue problems, extensive corrosion) should be addressed. Since continuous-span composite bridges are indeterminant structures, there is longitudinal and transverse distribution of the strengthening axial forces and moments. This manual basically provides the engineer with a procedure for determining the distribution of strengthening forces and moments throughout the bridge. As a result of the longitudinal and transverse force distribution, the design methodology presented in this manual for continuous-span composite bridges is extremely complex. To simplify the procedure, a spreadsheet has been developed for use by practicing engineers. This design aid greatly simplifies the design of a strengthening system for a given bridge in that it eliminates numerous tedious hand calculations, computes the required force and moment fractions, and performs the necessary iterations for determining the required strengthening forces. The force and moment distribution fraction formulas developed in this manual are primarily for the Iowa DOT V12 and V14 three-span four-stringer bridges. These formulas may be used on other bridges if they are within the limits stated in this manual. Use of the distribution fraction formulas for bridges not within the stated limits is not recommended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.