952 resultados para Confined Site Construction
Resumo:
The objective of this paper is to identify the various managerial constraints, difficulties and issues encountered and resulting strategies adopted, to aid in the management of the various and often complex health and safety concerns, which occur within a confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, to ensure the successful management of such confined environments within the realm of health and safety. Through an extensive literature review and detailed interviews, a comprehensive insight into the health and safety concerns within a confined construction site environment is portrayed. The leading managerial strategies to the management of health and safety on confined construction sites may be listed as follows; (1) Traffic Management Plan, (2) Effective Resource Management Plan, (3) Temporary Facilities Management Plan, (4) Safe System of Work Plan, (5) Site Safety Plan, (6) Design Site Layout, (7) Space Management Plan, (8) Effective Program Management, and (9) Space Scheduling. Based on the research, it can be concluded, that through effective management of these issues identified coupled with implementing the various strategies highlighted; successful management of health and safety within a confined construction site environment is attainable.
Resumo:
The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.
Resumo:
The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.
Resumo:
The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.
Resumo:
Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.
Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.
Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.
Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.
Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.
Resumo:
The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.
Resumo:
With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.
Resumo:
Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.
Resumo:
The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.
Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.
Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.
Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.
Resumo:
The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.
Resumo:
Climate change, whether gradual or sudden, has frequently been invoked as a causal factor to explain many aspects of cultural change during the prehistoric and early historic periods. Critiquing such theories has often proven difficult, not least because of the imprecise dating of many aspects of the palaeoclimate or archaeological records and the difficulties of merging the two strands of research. Here we consider one example of the archaeological record – peatland site construction in Ireland – which has previously been interpreted in terms of social response to climate change and examine whether close scrutiny of the archaeological and palaeoenvironmental records uphold the climatically deterministic hypotheses. We evaluate evidence for phasing in the temporal distribution of trackways and related sites in Irish peatlands, of which more than 3,500 examples have been recorded, through the examination of ~350 dendrochronological and 14C dates from these structures. The role of climate change in influencing when such sites were constructed is assessed by comparing visually and statistically the frequency of sites over the last 4,500 years with well-dated, multi-proxy climate reconstructions from Irish peatlands. We demonstrate that national patterns of “peatland activity” exist that indicate that the construction of sites in bogs was neither a constant nor random phenomenon. Phases of activity (i.e. periods in which the number of structures increased), as well as the ‘lulls’ that separate them, show no consistent correlation with periods of wetter or drier conditions on the bogs, suggesting that the impetus for the start or cessation of such activity was not climatically-determined. We propose that trigger(s) for peatland site construction in Ireland must instead also be sought within the wider, contemporary social background. Perhaps not surprisingly, a comparison with archaeological and palynological evidence shows that peatland activity tends to occur at times of more expansive settlement and land-use, suggesting that the bogs were used when the landscape was being more widely occupied. Interestingly, the lulls in peatland site construction coincide with transitional points between nominal archaeological phases, typically defined on the basis of their material culture, implying that there may indeed have been a cultural discontinuity at these times. © 2012 Elsevier Ltd. All rights reserved.
Resumo:
Aim: The aim of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.
Methodology: A literature review, case study analysis and questionnaire survey are employed, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.
Results: The following are the leading strategies in the management of materials in a confined urban site environment; (1) Consult and review the project programme, (2) Effective communication and delivery, (3) Implement site safety management plans, and (4) Proactive spatial monitoring and control.
Implication for Practice: With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a development.
Originality/Value: As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.
Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) together with a questionnaire survey from the industry, investigating the managerial strategies in the management of plant and material in confined urban site environments
Resumo:
Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.