987 resultados para Capacity Expansion


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Identifying railway capacity is an important task that can identify "in principal" whether the network can handle an intended traffic flow, and whether there is any free capacity left for additional train services. Capacity determination techniques can also be used to identify how best to improve an existing network, and at least cost. In this article an optimization approach has been applied to a case study of the Iran national railway, in order to identify its current capacity and to optimally expand it given a variety of technical conditions. This railway is very important in Iran and will be upgraded extensively in the coming years. Hence the conclusions in this article may help in that endeavor. A sensitivity analysis is recommended to evaluate a wider range of possible scenarios. Hence more useful lower and upper bounds can be provided for the performance of the system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a power system capacity expansion planning modelconsidering carbon emissions constraints. In addition to the traditionaltechnical and economical issues usually considered in the planning process, two environmental policies that consist on the taxation and the annual limitsof carbon dioxide (CO 2) emissions are considered. Furthermore, the gradualretirement of old inefficient generation plants has been included. The approachguarantees a cleaner electricity production in the expanded power system ata relatively low cost. The proposed model considers the transmission systemand is applied to a 4-region and 11-region power systems over a 20-yearplanning horizon. Results show practical investment decisions in terms of sustainability and costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Canada, increases in rural development has led to a growing need to effectively manage the resulting municipal and city sewage without the addition of significant cost- and energy- expending infrastructure. Storring Septic Service Limited is a family-owned, licensed wastewater treatment facility located in eastern Ontario. It makes use of a passive waste stabilization pond system to treat and dispose of waste and wastewater in an environmentally responsible manner. Storring Septic, like many other similar small-scale wastewater treatment facilities across Canada, has the potential to act as a sustainable eco-engineered facility that municipalities and service providers could utilize to manage and dispose of their wastewater. However, it is of concern that the substantial inclusion of third party material could be detrimental to the stability and robustness of the pond system. In order to augment the capacity of the current facility, and ensure it remains a self-sustaining system with the capacity to safely accept septage from other sewage haulers, it was hypothesized that pond effluent treatment could be further enhanced through the incorporation of one of three different technology solutions, which would allow the reduction of wastewater quality parameters below existing regulatory effluent discharge limits put in place by Ontario’s Ministry of the Environment and Climate Change (MOECC). Two of these solutions make use of biofilm technologies in order to enhance the removal of wastewater parameters of interest, and the third utilizes the natural water filtration capabilities of zebra mussels. Pilot-scale testing investigated the effects of each of these technologies on treatment performance under both cold and warm weather operation. This research aimed to understand the important mechanisms behind biological filtration methods in order to choose and optimize the best treatment strategy for full-scale testing and implementation. In doing so, a recommendation matrix was elaborated provided with the potential to be used as a universal operational strategy for wastewater treatment facilities located in environments of similar climate and ecology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Caption title.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investment in capacity expansion remains one of the most critical decisions for a manufacturing organisation with global production facilities. Multiple factors need to be considered making the decision process very complex. The purpose of this paper is to establish the state-of-the-art in multi-factor models for capacity expansion of manufacturing plants within a corporation. The research programme consisting of an extensive literature review and a structured assessment of the strengths and weaknesses of the current research is presented. The study found that there is a wealth of mathematical multi-factor models for evaluating capacity expansion decisions however no single contribution captures all the different facets of the problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Canada, increases in rural development has led to a growing need to effectively manage the resulting municipal and city sewage without the addition of significant cost- and energy- expending infrastructure. Storring Septic Service Limited is a family-owned, licensed wastewater treatment facility located in eastern Ontario. It makes use of a passive waste stabilization pond system to treat and dispose of waste and wastewater in an environmentally responsible manner. Storring Septic, like many other similar small-scale wastewater treatment facilities across Canada, has the potential to act as a sustainable eco-engineered facility that municipalities and service providers could utilize to manage and dispose of their wastewater. However, it is of concern that the substantial inclusion of third party material could be detrimental to the stability and robustness of the pond system. In order to augment the capacity of the current facility, and ensure it remains a self-sustaining system with the capacity to safely accept septage from other sewage haulers, it was hypothesized that pond effluent treatment could be further enhanced through the incorporation of one of three different technology solutions, which would allow the reduction of wastewater quality parameters below existing regulatory effluent discharge limits put in place by Ontario’s Ministry of the Environment and Climate Change (MOECC). Two of these solutions make use of biofilm technologies in order to enhance the removal of wastewater parameters of interest, and the third utilizes the natural water filtration capabilities of zebra mussels. Pilot-scale testing investigated the effects of each of these technologies on treatment performance under both cold and warm weather operation. This research aimed to understand the important mechanisms behind biological filtration methods in order to choose and optimize the best treatment strategy for full-scale testing and implementation. In doing so, a recommendation matrix was elaborated provided with the potential to be used as a universal operational strategy for wastewater treatment facilities located in environments of similar climate and ecology.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis focused upon the development of improved capacity analysis and capacity planning techniques for railways. A number of innovations were made and were tested on a case study of a real national railway. These techniques can reduce the time required to perform decision making activities that planners and managers need to perform. As all railways need to be expanded to meet increasing demands, the presumption that analytical capacity models can be used to identify how best to improve an existing network at least cost, was fully investigated. Track duplication was the mechanism used to expanding a network's capacity, and two variant capacity expansion models were formulated. Another outcome of this thesis is the development and validation of bi objective models for capacity analysis. These models regulate the competition for track access and perform a trade-off analysis. An opportunity to develop more general mulch-objective approaches was identified.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Analytical techniques for measuring and planning railway capacity expansion activities have been considered in this article. A preliminary mathematical framework involving track duplication and section sub divisions is proposed for this task. In railways these features have a great effect on network performance and for this reason they have been considered. Additional motivations have also arisen from the limitations of prior models that have not included them.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This article focusses upon multi-modal transportation systems (MMTS) and the issues surrounding the determination of system capacity. For that purpose a multi-objective framework is advocated that integrates all the different modes and many different competing capacity objectives. This framework is analytical in nature and facilitates a variety of capacity querying and capacity expansion planning.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Changing the topology of a railway network can greatly affect its capacity. Railway networks however can be altered in a multitude of different ways. As each way has significant immediate and long term financial ramifications, it is a difficult task to decide how and where to expand the network. In response some railway capacity expansion models (RCEM) have been developed to help capacity planning activities, and to remove physical bottlenecks in the current railway system. The exact purpose of these models is to decide given a fixed budget, where track duplications and track sub divisions should be made, in order to increase theoretical capacity most. These models are high level and strategic, and this is why increases to the theoretical capacity is concentrated upon. The optimization models have been applied to a case study to demonstrate their application and their worth. The case study evidently shows how automated approaches of this nature could be a formidable alternative to current manual planning techniques and simulation. If the exact effect of track duplications and sub-divisions can be sufficiently approximated, this approach will be very applicable.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Do hospitals experience safety tipping points as utilization increases, and if so, what are the implications for hospital operations management? We argue that safety tipping points occur when managerial escalation policies are exhausted and workload variability buffers are depleted. Front-line clinical staff is forced to ration resources and, at the same time, becomes more error prone as a result of elevated stress hormone levels. We confirm the existence of safety tipping points for in-hospital mortality using the discharge records of 82,280 patients across six high-mortality-risk conditions from 256 clinical departments of 83 German hospitals. Focusing on survival during the first seven days following admission, we estimate a mortality tipping point at an occupancy level of 92.5%. Among the 17% of patients in our sample who experienced occupancy above the tipping point during the first seven days of their hospital stay, high occupancy accounted for one in seven deaths. The existence of a safety tipping point has important implications for hospital management. First, flexible capacity expansion is more cost-effective for safety improvement than rigid capacity, because it will only be used when occupancy reaches the tipping point. In the context of our sample, flexible staffing saves more than 40% of the cost of a fully staffed capacity expansion, while achieving the same reduction in mortality. Second, reducing the variability of demand by pooling capacity in hospital clusters can greatly increase safety in a hospital system, because it reduces the likelihood that a patient will experience occupancy levels beyond the tipping point. Pooling the capacity of nearby hospitals in our sample reduces the number of deaths due to high occupancy by 34%.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Geraint Ellis and Richard Cowell explain the findings of the ‘Delivering renewable energy under devolution’ project, including some reasons for Scotland’s lead.

The UK has seen massive increases in renewable energy since 1998, with installed capacity growing from 2,600 MW to 12,300 MW in 2011. This has coincided with devolution and it is within Northern Ireland, Scotland and Wales that the greatest increases have been seen.

As devolved administrations now host half of the UK’s renewable energy capacity, their policies are critical to achieving the broader UK targets. This also provides a fascinating insight into what sort of approach works best, and why. This has been the focus of a two-year study, funded by the Economic and Social Research Council, involving universities from across the UK, which indicates that Scotland is leading the way on renewable energy.

All devolved governments have offered significant support to renewable energy but have different degrees of powers in relation to energy. Scotland’s success seems to be based on the centrality of energy issues to current political aspirations, particularly the SNP, but also has cross-party support. The research suggests that the consensus on the importance of renewable energy amongst élite interests in Scotland helps to explain why Scottish governments have been empowered and enabled to make robust use of the powers available.

As it has achieved successful growth in the sector, this too helps cultivate credibility among key business interests and gives increased leverage to its position in policy discussions with the UK Government. Scotland has been more consistent over time in presenting the expansion of renewable energy as a national economic agenda, rather than just an environmental or rural development agenda. The availability of larger, windy, but relatively less contested sites for onshore wind in Scotland has meant that more projects went through central consenting procedures rather than local planning authorities. Its enhanced support for wave and tidal power technologies is also notable. These political conditions have been harder to find in the rest of the UK, making progress a little more uncertain.

Northern Ireland has used its powers (which are more extensive than Scotland’s) to facilitate small-scale renewables and bio-fuel processes, with its liberalised planning regime offering an initial boost to expanding capacity.

This has contrasted with the position in Wales, which has least control over energy but the Welsh Government has adopted a more innovative approach to strategic spatial zoning; this appears to have pulled in a larger volume of onshore wind development interest than could be expected in a comparable region of England. A downside of the Welsh approach appears to be the fact that the concentration of these wind projects in these zones has triggered public opposition and political conflict.

It therefore appears that the powers available to the devolved governments do not seem to determine which country has been able to make greatest headway, with broader political commitments being more significant. Despite this, the research does not conclude that the actions and activities undertaken by the devolved governments are necessarily the most important factors in shaping the development of renewable energy in the UK. This is because devolution is still a relatively new dimension of energy governance in the UK and decisions affecting key drivers for renewable energy investment are still made mainly in Westminster, with the Treasury exercising close budgetary control. In all areas of the UK, grid capacity expansion remains slow to achieve. The major growth in offshore wind to date has been driven mainly by Westminster and cross-UK bodies with the most significant capacity growth being in English territorial waters.