968 resultados para Canadian Niagara Power Company


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A census form for the year 1905. The form was approved by the Governor General in Council January 22, 1906.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Photograph of water rushing through hydro tunnel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Another photograph of several men walking through the tunnel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large group of men standing in the tunnel wearing boots and hard hats.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Group of men in the hydro tunnel with a loaded dolly and large lamp for light.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One male looking down tunnel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Three men looking down tunnel as water is pouring in.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men, same men from a previous photograph, standing in the water of the tunnel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A photograph of man working high in rafter of the tunnel with ropes securing him.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A photograph of the hydro tunnel wall.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Canadian Niagara Power Company was created in 1892, in large part due to the efforts of William Birch Rankine, a businessman who pioneered the development of hydropower on both the Canadian and American shores of the Niagara River. Numerous delays and problems postponed the construction and operation of the company's powerhouse, which was formally opened on January 2, 1905. Upon opening, the powerhouse boasted the largest generators of their kind in the world, with a capacity of 10,000 electrical horsepower each. The company was acquired by FortisOntario in 2002. In 2009, the company’s water rights expired and the Canadian Niagara Powerhouse building, also known as the Rankine Generating Station, was turned over to the Niagara Parks Commission.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Remarks of Mr. William B. Rankine, secretary of the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men (unidentified) walking in tunnel wearing hard hats and carrying flashlights.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Consulting Engineer drawing of Sections of the Discharge Tunnel. Included in the drawing is the "cross section of tunnel with timbering" and "longitudinal section showing Timber in straight tunnel". Dated October 1902.