5 resultados para Calutron.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Includes bibliographical references.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Includes bibliographical references.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"The Y-12 Plant of the Clinton Engineer Works was operated by the Tennessee Eastman Corporation under Contract No. W-7401-eng-23 from Januaury 1943 until May 4, 1947, at which time operations were taken over by Carbide and Carbon Chemicals Corporation for the U.S. Atomic Energy Commission under Contract No. W-7405-eng-26"--Page 2 of cover.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Xerox copy.