968 resultados para CONSORT extension
Resumo:
Peer reviewed
Resumo:
Background It can be argued that adaptive designs are underused in clinical research. We have explored concerns related to inadequate reporting of such trials, which may influence their uptake. Through a careful examination of the literature, we evaluated the standards of reporting of group sequential (GS) randomised controlled trials, one form of a confirmatory adaptive design. Methods We undertook a systematic review, by searching Ovid MEDLINE from the 1st January 2001 to 23rd September 2014, supplemented with trials from an audit study. We included parallel group, confirmatory, GS trials that were prospectively designed using a Frequentist approach. Eligible trials were examined for compliance in their reporting against the CONSORT 2010 checklist. In addition, as part of our evaluation, we developed a supplementary checklist to explicitly capture group sequential specific reporting aspects, and investigated how these are currently being reported. Results Of the 284 screened trials, 68(24%) were eligible. Most trials were published in “high impact” peer-reviewed journals. Examination of trials established that 46(68%) were stopped early, predominantly either for futility or efficacy. Suboptimal reporting compliance was found in general items relating to: access to full trials protocols; methods to generate randomisation list(s); details of randomisation concealment, and its implementation. Benchmarking against the supplementary checklist, GS aspects were largely inadequately reported. Only 3(7%) trials which stopped early reported use of statistical bias correction. Moreover, 52(76%) trials failed to disclose methods used to minimise the risk of operational bias, due to the knowledge or leakage of interim results. Occurrence of changes to trial methods and outcomes could not be determined in most trials, due to inaccessible protocols and amendments. Discussion and Conclusions There are issues with the reporting of GS trials, particularly those specific to the conduct of interim analyses. Suboptimal reporting of bias correction methods could potentially imply most GS trials stopping early are giving biased results of treatment effects. As a result, research consumers may question credibility of findings to change practice when trials are stopped early. These issues could be alleviated through a CONSORT extension. Assurance of scientific rigour through transparent adequate reporting is paramount to the credibility of findings from adaptive trials. Our systematic literature search was restricted to one database due to resource constraints.
Using the Hofstede-Gray Framework to Argue Normatively for an Extension of Islamic Corporate Reports
Resumo:
Oberon-2 is an object-oriented language with a class structure based on type extension. The runtime structure of Oberon-2 is described and the low-level mechanism for dynamic type checking explained. It is shown that the superior type-safety of the language, when used for programming styles based on heterogeneous, pointer-linked data structures, has an entirely negligible cost in runtime performance.
Resumo:
The most costly operations encountered in pairing computations are those that take place in the full extension field Fpk . At high levels of security, the complexity of operations in Fpk dominates the complexity of the operations that occur in the lower degree subfields. Consequently, full extension field operations have the greatest effect on the runtime of Miller’s algorithm. Many recent optimizations in the literature have focussed on improving the overall operation count by presenting new explicit formulas that reduce the number of subfield operations encountered throughout an iteration of Miller’s algorithm. Unfortunately, almost all of these improvements tend to suffer for larger embedding degrees where the expensive extension field operations far outweigh the operations in the smaller subfields. In this paper, we propose a new way of carrying out Miller’s algorithm that involves new explicit formulas which reduce the number of full extension field operations that occur in an iteration of the Miller loop, resulting in significant speed ups in most practical situations of between 5 and 30 percent.
Resumo:
Historically, the development philosophy for the two Territories of Papua and New Guinea (known as TPNG, formerly two territories, Papua and New Guinea) was equated with economic development, with a focus on agricultural development. To achieve the modification or complete change in indigenous farming systems the Australian Government’s Department of External Territories adopted and utilised a programme based on agricultural extension. Prior to World War II, under Australian administration, the economic development of these two territories, as in many colonies of the time, was based on the institution of the plantation. Little was initiated in agriculture development for indigenous people. This changed after World War II to a rationale based on the promotion and advancement of primary industry, but also came to include indigenous farmers. To develop agriculture within a colony it was thought that a modification to, or in some cases the complete transformation of, existing farming systems was necessary to improve the material welfare of the population. It was also seen to be a guarantee for the future national interest of the sovereign state after independence was granted. The Didiman and Didimisis became the frontline, field operatives of this theoretical model of development. This thesis examines the Didiman’s field operations, the structural organisation of agricultural administration and the application of policy in the two territories.
Resumo:
This paper serves as a first study on the implementation of control strategies developed using a kinematic reduction onto test bed autonomous underwater vehicles (AUVs). The equations of motion are presented in the framework of differential geometry, including external dissipative forces, as a forced affine connection control system. We show that the hydrodynamic drag forces can be included in the affine connection, resulting in an affine connection control system. The definitions of kinematic reduction and decoupling vector field are thus extended from the ideal fluid scenario. Control strategies are computed using this new extension and are reformulated for implementation onto a test-bed AUV. We compare these geometrically computed controls to time and energy optimal controls for the same trajectory which are computed using a previously developed algorithm. Through this comparison we are able to validate our theoretical results based on the experiments conducted using the time and energy efficient strategies.