861 resultados para Building Rating Systems
Resumo:
The use of sustainable assessment methods in the UK is on the rise, anticipating the future regulatory trajectory towards zero carbon by 2016. The indisputable influence of sustainable rating tools on UK building regulations conveys the importance of evaluating their effectiveness in achieving true sustainable design, without adversely effecting human health and wellbeing. This paper reviews indoor air-quality (IAQ) issues addressed by UK sustainable assessment tools, and the potential trade-offs between building energy conservation and IAQ. The barriers to effective adoption of IAQ strategies are investigated, including recommendations, suggestions, and future research needs. The review identified a fundamental lack of IAQ criteria in sustainable assessment tools aimed at the residential sector. The consideration of occupants’ health and well-being should be paramount in any assessment scheme, and should not be overshadowed or obscured by the drive towards energy efficiency. A balance is essential.
Resumo:
The attention on green building is driven by the desire to reduce a building’s running cost over its entire life cycle. However, with the use of sustainable technologies and more environmentally friendly products in the building sector, the construction industry contributes significantly to sustainable actions of our society. Different certification systems have entered the market with the aim to measure a building’s sustainability. However, each system uses its own set of criteria for the purpose of rating. The primary goal of this study is to identify a comprehensive set of criteria for the measurement of building sustainability, and therefore to facilitate the comparison of existing rating methods. The collection and analysis of the criteria, identified through a comprehensive literature review, has led to the establishment of two additional categories besides the 3 pillars of sustainability. The comparative analyses presented in this thesis reveal strengths and weaknesses of the chosen green building certification systems - LEED, BREEAM, and DGNB.
Resumo:
Context The School of Information Technology at QUT has recently undertaken a major restructuring of their Bachelor of Information Technology (BIT) course. Some of the aims of this restructuring include a reduction in first year attrition and to provide an attractive degree course that meets both student and industry expectations. Emphasis has been placed on the first semester in the context of retaining students by introducing a set of four units that complement one another and provide introductory material on technology, programming and related skills, and generic skills that will aid the students throughout their undergraduate course and in their careers. This discussion relates to one of these four fist semester units, namely Building IT Systems. The aim of this unit is to create small Information Technology (IT) systems that use programming or scripting, databases as either standalone applications or web applications. In the prior history of teaching introductory computer programming at QUT, programming has been taught as a stand alone subject and integration of computer applications with other systems such as databases and networks was not undertaken until students had been given a thorough grounding in those topics as well. Feedback has indicated that students do not believe that working with a database requires programming skills. In fact, the teaching of the building blocks of computer applications have been compartmentalized and taught in isolation from each other. The teaching of introductory computer programming has been an industry requirement of IT degree courses as many jobs require at least some knowledge of the topic. Yet, computer programming is not a skill that all students have equal capabilities of learning (Bruce et al., 2004) and this is clearly shown by the volume of publications dedicated to this topic in the literature over a broad period of time (Eckerdal & Berglund, 2005; Mayer, 1981; Winslow, 1996). The teaching of this introductory material has been done pretty much the same way over the past thirty years. During this period of time that introductory computer programming courses have been taught at QUT, a number of different programming languages and programming paradigms have been used and different approaches to teaching and learning have been attempted in an effort to find the golden thread that would allow students to learn this complex topic. Unfortunately, computer programming is not a skill that can be learnt in one semester. Some basics can be learnt but it can take many years to master (Norvig, 2001). Faculty data typically has shown a bimodal distribution of results for students undertaking introductory programming courses with a high proportion of students receiving a high mark and a high proportion of students receiving a low or failing mark. This indicates that there are students who understand and excel with the introductory material while there is another group who struggle to understand the concepts and practices required to be able to translate a specification or problem statement into a computer program that achieves what is being requested. The consequence of a large group of students failing the introductory programming course has been a high level of attrition amongst first year students. This attrition level does not provide good continuity in student numbers in later years of the degree program and the current approach is not seen as sustainable.
Resumo:
This paper treats the seismic mitigation of medium rise frame-shear wall structures and building facade systems using passive damping devices. The frame shear wall structures have embedded viscoelastic and friction dampers in different configurations and placed in various locations in the structure. Influence of damper type, configuration and location are investigated. Results for tip deflections which provide an overall evaluation of the seismic response of the structure, are determined. Seismic mitigation of building facade systems in which visco-elastic dampers are fitted at the horizontal connections between the facades and the frame, instead of the traditional rigid connections, are also treated. Finite element techniques are used to model and analyse the two structural systems under different earthquake loadings, scaled to the same peak ground acceleration for meaningful comparison of responses. Results demonstrate the feasibility of these techniques for seismic mitigation.
Resumo:
Increased focus on energy cost savings and carbon footprint reduction efforts improved the visibility of building energy simulation, which became a mandatory requirement of several building rating systems. Despite developments in building energy simulation algorithms and user interfaces, there are some major challenges associated with building energy simulation; an important one is the computational demands and processing time. In this paper, we analyze the opportunities and challenges associated with this topic while executing a set of 275 parametric energy models simultaneously in EnergyPlus using a High Performance Computing (HPC) cluster. Successful parallel computing implementation of building energy simulations will not only improve the time necessary to get the results and enable scenario development for different design considerations, but also might enable Dynamic-Building Information Modeling (BIM) integration and near real-time decision-making. This paper concludes with the discussions on future directions and opportunities associated with building energy modeling simulations.
Resumo:
Predictability - the ability to foretell that an implementation will not violate a set of specified reliability and timeliness requirements - is a crucial, highly desirable property of responsive embedded systems. This paper overviews a development methodology for responsive systems, which enhances predictability by eliminating potential hazards resulting from physically-unsound specifications. The backbone of our methodology is the Time-constrained Reactive Automaton (TRA) formalism, which adopts a fundamental notion of space and time that restricts expressiveness in a way that allows the specification of only reactive, spontaneous, and causal computation. Using the TRA model, unrealistic systems - possessing properties such as clairvoyance, caprice, in finite capacity, or perfect timing - cannot even be specified. We argue that this "ounce of prevention" at the specification level is likely to spare a lot of time and energy in the development cycle of responsive systems - not to mention the elimination of potential hazards that would have gone, otherwise, unnoticed. The TRA model is presented to system developers through the CLEOPATRA programming language. CLEOPATRA features a C-like imperative syntax for the description of computation, which makes it easier to incorporate in applications already using C. It is event-driven, and thus appropriate for embedded process control applications. It is object-oriented and compositional, thus advocating modularity and reusability. CLEOPATRA is semantically sound; its objects can be transformed, mechanically and unambiguously, into formal TRA automata for verification purposes, which can be pursued using model-checking or theorem proving techniques. Since 1989, an ancestor of CLEOPATRA has been in use as a specification and simulation language for embedded time-critical robotic processes.
Resumo:
Modern buildings are designed to enhance the match between environment, spaces and the people carrying out work, so that the well-being and the performance of the occupants are all in harmony. Building services are systems that facilitate a healthy working environment within which workers productivity can be optimised in the buildings. However, the maintenance of these services is fraught with problems that may contribute to up to 50% of the total life cycle cost of the building. Maintenance support is one area which is not usually designed into the system as this is not common practice in the services industry. The other areas of shortfall for future designs are; client requirements, commissioning, facilities management data and post occupancy evaluation feedback which needs to be adequately planned to capture and document this information for use in future designs. At the University of Reading an integrated approach has been developed to assemble the multitude of aspects inherent in this field. The means records required and measured achievements for the benefit of both building owners and practitioners. This integrated approach can be represented in a Through Life Business Model (TLBM) format using the concept of Integrated Logistic Support (ILS). The prototype TLBM developed utilises the tailored tools and techniques of ILS for building services. This TLBM approach will facilitate the successful development of a databank that would be invaluable in capturing essential data (e.g. reliability of components) for enhancing future building services designs, life cycle costing and decision making by practitioners, in particular facilities managers.