908 resultados para Building Environmental Assessment
Resumo:
Building's construction activities, operation and demolition are increasingly recognised as a major source of environmental impact. One strategy for reducing such impacts is most widely known by the term Building Environmental Assessment (BEA). The research is an attempt to develop a new BEA scheme for residential buildings in Brunei which focussing on identifying BEA indicators that best suit for Brunei environment, social and economy. Studies show that Brunei residential sector needs urgent attention to transform its current consumption rate in more sustainable way. Recent launch of Brunei Green Building Council, mandatory energy efficiency guidelines and declaration of ambitious energy intensity reduction target, a new BEA scheme will help contribute sustainability target in residential sector. However the issues of developing a new BEA schemes using existing methods may face constraints in their effectiveness. In this regard, a consensus-forming technique-Delphi method-helps improve greater communication and gain consensus from experts in the construction industry through series of questionnaires. As a result, the final framework is produced comprises of 7 key categories and 37 applicable criteria that achieved high degree of consensus and importance.
Resumo:
The construction, operation and demolition of buildings represent one of the most damaging human activities in the global environment nowadays and water use and conservation is one of the most representative environmental loads to be considered. Brazil, unlike some other countries, has not yet implemented its own body building environmental assessment. The development of an environmental assessment system requires the identification of the most important topics to be considered in each theme for each country or region, due to local environmental agenda. This article presents a summary of the main topics concerning water conservation considered in some international environmental building assessment systems and presents a proposal of topics to take into account in a Brazilian assessment system. Practical application: The civil construction industry is not only one of the biggest sectors in the economy but is also one of the greatest polluters. Along with standardisation, it is also necessary to establish measures to attract significantly higher levels in different topics related to sustainable construction. New mechanisms that allow users to recognise the difference between buildings with different sustainable performance levels need to be developed. This article will be used as a base for the development of a Brazilian system of assessment and rating for building environmental performance and sustainability in terms of water use and conservation.
Resumo:
Since the last decade of the twentieth century, the healthcare industry is paying attention to the environmental impact of their buildings and therefore new regulations, policy goals and Buildings Sustainability Assessment (HBSA) methods are being developed and implemented. At the present, healthcare is one of the most regulated industries and it is also one of the largest consumers of energy per net floor area. To assess the sustainability of healthcare buildings it is necessary to establish a set of benchmarks related with their life-cycle performance. They are both essential to rate the sustainability of a project and to support designers and other stakeholders in the process of designing and operating a sustainable building, by allowing the comparison to be made between a project and the conventional and best market practices. This research is focused on the methodology to set the benchmarks for resources consumption, waste production, operation costs and potential environmental impacts related to the operational phase of healthcare buildings. It aims at contributing to the reduction of the subjectivity found in the definition of the benchmarks used in Building Sustainability Assessment (BSA) methods, and it is applied in the Portuguese context. These benchmarks will be used in the development of a Portuguese HBSA method.
Resumo:
Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on `what is strategic` is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval. (c) 2008 Elsevier Inc. All rights reserved.
Resumo:
A soft linguistic evaluation method is proposed for the environmental assessment of physical infrastructure projects based on fuzzy relations. Infrastructure projects are characterized in terms of linguistic expressions of 'performance' with respect to factors or impacts and the 'importance' of those factors/impacts. A simple example is developed to illustrate the method in the context of three road infrastructure projects assessed against five factors/impacts. In addition, a means to include hard or crisp factors is presented and illustrated with respect to a sixth factor.
Resumo:
Proceedings of the First International Conference on Coastal Conservation and Management in the Atlantic and Mediterranean, p. 91-98
Resumo:
The Institute of Public Health in Ireland is an all-island body which aims to improve health in Ireland by working to combat health inequalities and influence public policies in favour of health. The Institute promotes co-operation in research, training, information and policy in order to contribute to policies which tackle inequalities in health. Over the past six years the Institute has worked closely with the Department of Health and Children and the Department of Health, Social Services and Public Safety in Northern Ireland to build capacity for Health Impact Assessment. The Institute takes the view that health is determined by policies, plans and programmes in many sectors outside the health sector as well as being dependent on access to and availability of first class health services. The importance of other sectors is encapsulated in a social determinants of health perspective which recognises that health is largely shaped and influenced by the physical, social, economic and cultural environments in which people live, work and play. Figure 1 illustrates these multi-dimensional impacts on health and also serves to highlight the clear and inextricable links between health and sustainable development. Factors that impact on long-term sustainability will thus also impact on health.
Resumo:
The Institute of Public Health in Ireland welcomes the opportunity to comment on the Draft Guidance on Health in Strategic Environmental Assessment. Our organisation aims to improve health on the island of Ireland by working to combat health inequalities and influence public policies in favour of health. The Institute applies a holistic model of health which emphasises a wide range of health determinants, including economic, environmental, social and biological factors. Our work is based on the premise that improving health and reducing health inequalities can only be achieved through addressing these broad determinants of health.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analysis conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480).
Resumo:
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Iowa Wetland Management District: Environmental Assessment and Draft Comprehensive Conservation Plan
Resumo:
This Environmental Assessment documents the National Environmental Policy Act (NEPA) process for developing a Comprehensive Conservation Plan (CCP) for the Iowa Wetland Management District (WMD, district). In general, scoping reveals issues that drive alternative ways of managing the district. Implementation of each of those alternative management styles (including the No Action Alternative) may have different effects on the physical, biological, and socio-economic environment. Analysis of these effects reveals the “preferred” alternative, which constitutes the CCP. The CCP includes goals, objectives, and strategies for the district to guide overall management for the next 15 years. The Iowa WMD consists of scattered tracts of habitat (both wetland and upland grassland) known as Waterfowl Production Areas (WPAs). As of 2011, there are 75 WPAs in 18 counties in north-central Iowa totaling 24,712 acres in fee title primarily managed by the Iowa Department of Natural Resources (DNR). Even though district acquisition has only occurred in 18 counties to date, a larger 35-county boundary is approved. This boundary follows the historic range of the poorly drained Prairie Pothole Region (PPR) in Iowa, an area known for its waterfowl production. The district also includes 575 WPA acres and approximately 434 Farm Service Agency acres in conservation easements on private land. This plan was prepared with the intent that the strong partnership with the Iowa DNR will continue over the next 15 years.
Resumo:
DESCRIPTION OF PROPOSED ACTION This Environmental Assessment (EA) has been prepared in compliance with the requirements of the National Environmental Policy Act of 1969 (NEPA). This EA informs the public and interested agencies of the proposed action and alternatives to the proposed action in order to gather feedback on the improvements under consideration. Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) are evaluating potential alternatives to improve IA 122 in the City of Mason City. IA 122/Business US 18 is a primary east-west travel route through the City that transitions from a 4- lane undivided roadway, to 2-lane one-way pairs, then back to a 4-lane undivided roadway (Figure 1-1). The Iowa DOT proposes to flatten the tight reverse curves on the east end of the project. The one-way pairs will be narrowed by eliminating on-street parking along the corridor to more clearly define travel lanes. This will serve to calm traffic flows and reduce crashes along the highway. Additionally, improvements to intersections as well as consolidating or removing access points to improve traffic operations are proposed within the project corridor. A new access road for the Mason City Fire Department on the west end of the project will allow emergency trucks better access to travel south and east. Study Area The primary area of investigation for the Project is generally bounded by IA 122 through Mason City, known locally as 5th and 6th Street Southwest from South Monroe Avenue to South Carolina Avenue. US 65, known locally as Federal Avenue, bisects the study area. At this intersection of US 65 and Iowa 122, the 5th and 6th Street SW changes to 5th and 6th St SE. For the purposes of this discussion, this area will be referred to collectively as the IA 122 corridor. The Study Area boundaries were established to allow the development of a wide range of alternatives that could address the purpose and need for the project. The Study Area is larger than the area proposed for construction activities for the Project. However, some impacts may extend beyond the Study Area; where this occurs, it will be noted and addressed in the Environmental Analysis Section (Section 5). Figure 1-1 outlines the Study Area of the proposed action.
Resumo:
From Proposed Action: "The proposed action consists of reconstructing the East 1st Street/I-35 interchange with a Diverging Diamond interchange, widening I-35 from four (4) lanes to six (6) lanes, and widening East 1st Street from four (4) lanes to five (5) lanes from Delaware Avenue to Frisk Drive. The project also proposes to reconstruct the intersections of East 1st Street/Creekview Drive and East 1st Street/Frisk Drive."