996 resultados para Bond stress
Resumo:
This paper presents two test procedures for evaluating the bond stress–slip and the slip–radial dilation relationships when the prestressing force is transmitted by releasing the steel (wire or strand) in precast prestressed elements. The bond stress–slip relationship is obtained with short length specimens, to guarantee uniform bond stress, for three depths of the wire indentation (shallow, medium and deep). An analytical model for bond stress–slip relationship is proposed and compared with the experimental results. The model is also compared with the experimental results of other researchers. Since numerical models for studying bond-splitting problems in prestressed concrete require experimental data about dilatancy angle (radial dilation), a test procedure is proposed to evaluate these parameters. The obtained values of the radial dilation are compared with the prior estimated by numerical modelling and good agreement is reached
Resumo:
Carbon fiber reinforced polymer (CFRP) sheets have established a strong position as an effective method for innovative structural rehabilitation. However, the use of externally bonded CFRP in the repair and rehabilitation of steel structures is a relatively new technique that has the potential to improve the way structures are repaired. An important step toward understanding bond behaviour is to have an estimation of local bond stress versus slip relationship. The current study aims to establish the bond-slip model for CFRP sheets bonded to steel plate. To obtain the shear stress versus slippage relationship, a series of double strap tension type bond tests were conducted. This paper reports on the findings of the experimental studies. The strain and stress distributions measured in the specimens for two different bond lengths. The results show a preliminary bi-linear bond-slip model may be adopted for CFRP sheet bonded with steel plate.
Resumo:
Based on an analysis of the experimental results of a proposed bond test method, significant differences are shown to exist between the local FRP bond stress-slip relationships in the uncracked anchorage regions and in the regions between cracks. The proposed method simulates the bond behavior between the flexural cracks and anchorage regions of a flexurally FRP-strengthened RC beam. The boundary conditions, including the presence of cracks and steel, are shown to have significant effects on the local bond stress-slip models. The results showed that, at the same force, the bond stresses in the regions between cracks were lower than in regions outside the cracks, so the debonding formed in the anchorage regions. The local bond stress-slip models in the anchorage regions can be obtained from the conventional bond test methods but these do not mimic the conditions between the cracks.
Resumo:
This paper presents an analytical model for simulating the bond between steel and concrete, in precast prestressed concrete elements, during the prestressing force release. The model establishes a relationship between bond stress, steel and concrete stress and slip in such concrete structures. This relationship allows us to evaluate the bond stress in the transmission zone, where bond stress is not constant, along the whole prestressing force release process. The model is validated with the results of a series of tests and is extended to evaluate the transmission length. This capability has been checked by comparing the transmission length predicted by the model and one measured experimentally in a series of tests.
Resumo:
This paper presents an analytical model for simulating the bond between steel and concrete, in precast prestressed concrete elements, during the prestressing force release. The model establishes a relationship between bond stress, steel and concrete stress and slip in such concrete structures. This relationship allows us to evaluate the bond stress in the transmission zone, where bond stress is not constant, along the whole prestressing force release process. The model is validated with the results of a series of tests, considering different steel indentation depths and concrete covers and is extended to evaluate the transmission length. This capability has been checked by comparing the transmission length predicted by the model and one measured experimentally in two series of tests.
Resumo:
A bond analytical model is proposed in this paper. The model is capable of reproducing the bond stress developed between the steel and concrete, in precast prestressed elements, during the entire process of prestressing force release. The bond stress developed in the transmission zone, where the bond stress is not constant, is also obtained. The steel and concrete stresses as well as the slip between both materials can be also estimated by means of the relation established in the model between these parameters and the bond stress. The model is validated with the results of a series of tests, considering different steel indentation depths and concrete covers and it is extended to evaluate the transmission length. This has been checked by comparing the transmission length predicted by the model and one measured experimentally in two series of tests.
Resumo:
A bond analytical model is proposed in this paper. The model is capable of reproducing the bond stress developed between the steel and concrete, in precast prestressed elements, during the entire process of prestressing force release. The bond stress developed in the transmission zone, where the bond stress is not constant, is also obtained. The steel and concrete stresses as well as the slip between both materials can be also estimated by means of the relation established in the model between these parameters and the bond stress. The model is validated with the results of a series of tests, considering different steel indentation depths and concrete covers and it is extended to evaluate the transmission length. This has been checked by comparing the transmission length predicted by the model and one measured experimentally in two series of tests.
Resumo:
Synopsis: Bonded-in rod timber joints off er several advantages over conventional types of joint, including high local force transfer, very stiff connections, and improved ?re and aesthetic properties since the connection is completely hidden in the insulating timber members. More recently, the use of ?bre reinforced polymer (FRP) as a connecting rod, alternative to steel rods, in bonded-in rod connections for timber structures has been investigated. However, the investigation into the behaviour of such joints is limited, in particular, connections involving basalt ?bre reinforced polymers (BFRP) bars - which is the primary focus of this research. This paper presents an experimental programme conducted to investigate the behaviour of bonded-in BFRP bars loaded parallel to the grain of glulam members. Tensile pull-out tests were conducted to examine the effect of bonded length and bond stress-slip on the structural capacity of the connection. An analytical design expression for predicting pull-out capacity is proposed and the results have been compared with some established design equations. It was found that pull-out load increased approximately linearly with the bonded length, up to maximum which occurred at a bonded length of 15 times the hole diameter, and did not increase beyond this bonded length. The most signi?cant failure modes were failure at the timber/adhesive interface followed by pullout of the BFRP rod. Increased bonded lengths resulted in higher bond slip values compared to lower equivalent bonded lengths. The proposed design model gave the best predictions of pull-out capacity compared with other existing models.
Resumo:
The behaviour of Basalt Fibre Reinforced Polymer (BFRP) loaded perpendicular to glulam timber elements was investigated. It was found that pull-out load increased approximately linearly with the bonded length up to maximum which occurred at a bonded length of 250 mm (~15 times the hole diameter) and did not increase beyond this bonded length. Failure mode of the samples was mostly shear fracture which was located at the cylindrical zone at the timber/adhesive interface. Increased bonded lengths resulted in corresponding decrease in interfacial bond stress. At 250 mm bonded length, the pull-out capacity of the proposed design model was about 2% lower than that of the tests. The results also showed that the bond stress of the theoretical model (at the ascending and descending branches) of the stress–slip curve was approximately 5–10% of that of the experiment.
Resumo:
Use of bridge deck overlays is important in maximizing bridge service life. Overlays can replace the deteriorated part of the deck, thus extending the bridge life. Even though overlay construction avoids the construction of a whole new bridge deck, construction still takes significant time in re-opening the bridge to traffic. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. Reducing the construction time could have an effect on reducing the socioeconomic costs associated with bridge deck rehabilitation and the inconvenience caused to travelers. This work included three major tasks with literature review, field investigation, and laboratory testing. Overlay concrete mix used for present construction takes long curing hours and therefore an investigation was carried out to find fast-curing concrete mixes that could reduce construction time. Several fast-cuing concrete mixes were found and suggested for further evaluation. An on-going overlay construction project was observed and documented. Through these observations, several opportunities were suggested where small modifications in the process could lead to significant time savings. With current standards of the removal depth of substrate concrete in Iowa, it takes long hours for the removal process. Four different laboratory tests were performed with different loading conditions to determine the necessary substrate concrete removal depth for a proper bond between the substrate concrete and the new overlay concrete. Several parameters, such as failure load, bond stress, and stiffness, were compared for four different concrete removal depths. Through the results and observations of this investigation several conclusions were made which could reduce bridge deck overlay construction time.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Civil - FEIS