895 resultados para Average Time to Signal
Resumo:
A Fortran computer program is given for the computation of the adjusted average time to signal, or AATS, for adaptive (X) over bar charts with one, two, or all three design parameters variable: the sample size, n, the sampling interval, h, and the factor k used in determining the width of the action limits. The program calculates the threshold limit to switch the adaptive design parameters and also provides the in-control average time to signal, or ATS.
Resumo:
In this article, we consider the synthetic control chart with two-stage sampling (SyTS chart) to control the process mean and variance. During the first stage, one item of the sample is inspected; if its value X, is close to the target value of the process mean, then the sampling is interrupted. Otherwise, the sampling goes on to the second stage, where the remaining items are inspected and the statistic T = Sigma [x(i) - mu(0) + xi sigma(0)](2) is computed taking into account all items of the sample. The design parameter is function of X-1. When the statistic T is larger than a specified value, the sample is classified as nonconforming. According to the synthetic procedure, the signal is based on Conforming Run Length (CRL). The CRL is the number of samples taken from the process since the previous nonconforming sample until the occurrence of the next nonconforming sample. If the CRL is sufficiently small, then a signal is generated. A comparative study shows that the SyTS chart and the joint X and S charts with double sampling are very similar in performance. However, from the practical viewpoint, the SyTS chart is more convenient to administer than the joint charts.
Resumo:
A standard (X) over bar chart for controlling the process mean takes samples of size no at specified, equally-spaced, fixed-time points. This article proposes a modification of the standard (X) over bar chart that allows one to take additional samples, bigger than no, between these fixed times. The additional samples are taken from the process when there is evidence that the process mean moved from target. Following the notation proposed by Reynolds (1996a) and Costs (1997) we shortly call the proposed (X) over bar chart as VSSIFT (X) over bar chart: where VSSIFT means variable sample size and sampling intervals with fixed times. The (X) over bar chart with the VSSIFT feature is easier to be administered than a standard VSSI (X) over bar chart that is not constrained to sample at the specified fixed times. The performances of the charts in detecting process mean shifts are comparable.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Recent theoretical studies have shown that the X̄ chart with variable sampling intervals (VSI) and the X̄ chart with variable sample size (VSS) are quicker than the traditional X̄ chart in detecting shifts in the process. This article considers the X̄ chart with variable sample size and sampling intervals (VSSI). It is assumed that the amount of time the process remains in control has exponential distribution. The properties of the VSSI X̄ chart are obtained using Markov chains. The VSSI X̄ chart is even quicker than the VSI or VSS X̄ charts in detecting moderate shifts in the process.
Resumo:
A standard X̄ chart for controlling the process mean takes samples of size n0 at specified, equally-spaced, fixed-time points. This article proposes a modification of the standard X chart that allows one to take additional samples, bigger than n0, between these fixed times. The additional samples are taken from the process when there is evidence that the process mean moved from target. Following the notation proposed by Reynolds (1996a) and Costa (1997) we shortly call the proposed X chart as VSSIFT X chart where VSSIFT means variable sample size and sampling intervals with fixed times. The X chart with the VSSIFT feature is easier to be administered than a standard VSSI X chart that is not constrained to sample at the specified fixed times. The performances of the charts in detecting process mean shifts are comparable. Copyright © 1998 by Marcel Dekker, Inc.
Resumo:
A Fortran computer program is given for the computation of the adjusted average time to signal, or AATS, for adaptive X̄ charts with one, two, or all three design parameters variable: the sample size, n, the sampling interval, h, and the factor k used in determining the width of the action limits. The program calculates the threshold limit to switch the adaptive design parameters and also provides the in-control average time to signal, or ATS.
Resumo:
Recent studies have shown that the X̄ chart with variable sampling intervals (VSI) and/or with variable sample sizes (VSS) detects process shifts faster than the traditional X̄ chart. This article extends these studies for processes that are monitored by both the X̄ and R charts. A Markov chain model is used to determine the properties of the joint X and R charts with variable sample sizes and sampling intervals (VSSI). The VSSI scheme improves the joint X̄ and R control chart performance in terms of the speed with which shifts in the process mean and/or variance are detected.
Resumo:
Varying the parameters of the X̄ chart has been explored extensively in recent years. In this paper, we extend the study of the X̄ chart with variable parameters to include variable action limits. The action limits establish whether the control should be relaxed or not. When the X̄ falls near the target, the control is relaxed so that there will be more time before the next sample and/or the next sample will be smaller than usual. When the X̄ falls far from the target but not in the action region, the control is tightened so that there is less time before the next sample and/or the next sample will be larger than usual. The goal is to draw the action limits wider than usual when the control is relaxed and narrower than usual when the control is tightened. This new feature then makes the X̄ chart more powerful than the CUSUM scheme in detecting shifts in the process mean.
Resumo:
Research has shown that applying the T-2 control chart by using a variable parameters (VP) scheme yields rapid detection of out-of-control states. In this paper, the problem of economic statistical design of the VP T-2 control chart is considered as a double-objective minimization problem with the statistical objective being the adjusted average time to signal and the economic objective being expected cost per hour. We then find the Pareto-optimal designs in which the two objectives are met simultaneously by using a multi-objective genetic algorithm. Through an illustrative example, we show that relatively large benefits can be achieved by applying the VP scheme when compared with usual schemes, and in addition, the multi-objective approach provides the user with designs that are flexible and adaptive.
Resumo:
This work investigates the performance of cardiorespiratory analysis detecting periodic breathing (PB) in chest wall recordings in mountaineers climbing to extreme altitude. The breathing patterns of 34 mountaineers were monitored unobtrusively by inductance plethysmography, ECG and pulse oximetry using a portable recorder during climbs at altitudes between 4497 and 7546 m on Mt. Muztagh Ata. The minute ventilation (VE) and heart rate (HR) signals were studied, to identify visually scored PB, applying time-varying spectral, coherence and entropy analysis. In 411 climbing periods, 30-120 min in duration, high values of mean power (MP(VE)) and slope (MSlope(VE)) of the modulation frequency band of VE, accurately identified PB, with an area under the ROC curve of 88 and 89%, respectively. Prolonged stay at altitude was associated with an increase in PB. During PB episodes, higher peak power of ventilatory (MP(VE)) and cardiac (MP(LF)(HR) ) oscillations and cardiorespiratory coherence (MP(LF)(Coher)), but reduced ventilation entropy (SampEn(VE)), was observed. Therefore, the characterization of cardiorespiratory dynamics by the analysis of VE and HR signals accurately identifies PB and effects of altitude acclimatization, providing promising tools for investigating physiologic effects of environmental exposures and diseases.
Resumo:
The double spin-echo point resolved spectroscopy sequence (PRESS) is a widely used method and standard in clinical MR spectroscopy. Existence of important J-modulations at constant echo times, depending on the temporal delays between the rf-pulses, have been demonstrated recently for strongly coupled spin systems and were exploited for difference editing, removing singlets from the spectrum (strong-coupling PRESS, S-PRESS). A drawback of this method for in vivo applications is that large signal modulations needed for difference editing occur only at relatively long echo times. In this work we demonstrate that, by simply adding a third refocusing pulse (3S-PRESS), difference editing becomes possible at substantially shorter echo times while, as applied to citrate, more favorable lineshapes can be obtained. For the example of an AB system an analytical description of the MR signal, obtained with this triple refocusing sequence (3S-PRESS), is provided.
Resumo:
Time to flowering and maturity is an important adaptive feature in annual crops, including cowpeas (Vigna unguiculata (L.) Walp.). In West and Central Africa, photoperiod is the most important environmental variable affecting time to flowering in cowpea. The inheritance of time from sowing to flowering (f) in cowpeas was studied by crossing a photoperiod-sensitive genotype Kanannnado to a photoperiod-insensitive variety IT97D-941-1. Sufficient seed of F-1, F-2, F-3 and backcross populations were generated. The parental, F-1, F-2, F-3 and the backcross populations were screened for f under long natural days (mean daylength 13.4 h per day) in the field and the parents, F-1, F-2 and backcross populations under short day (10 h per day) conditions. The result of the screening showed that photoperiod in the field was long enough to delay flowering of photoperiod-sensitive genotypes. Photoperiod-sensitivity was found to be partially dominant to insensitivity. Frequency distribution of the trait in the various populations indicated quantitative inheritance. Additive (d) and additive x dominance (j) interactions were the most important gene actions conditioning time to flowering. A narrow sense heritability of 86% was estimated for this trait. This will result in 26 days gain in time to flowering with 5% selection intensity from the F-2 to F-3 generation. At least seven major gene pairs, with an average delay of 6 days each, were estimated to control time to flowering in this cross.
Resumo:
Statement of problem. The use of ultrasonic tips has become an alternative for cavity preparation. However, there are concerns about this type of device, particularly with respect to intrapulpal temperatures and cavity preparation time.Purpose. The purpose of this study was to analyze pulpal temperature increases generated by an ultrasonic cavity preparation with chemical vapor deposition (CVD) tips, in comparison to preparation with a high-speed handpiece with a diamond rotary cutting instrument. The time required to complete the cavity preparation with each system was also evaluated.Material and methods. Thermocouples were positioned in the pulp chamber of 20 extracted human third molars. Slot-type cavities (3 x 3 x 2 mm) were prepared on the buccal and the lingual surfaces of each tooth. The test groups were: high-speed cavity preparation with diamond rotary cutting instruments (n = 20) and ultrasonic cavity preparation with CVD points (n = 20). During cavity preparation, the increases In pulpal temperature, and the time required for the preparation, were recorded and analyzed by Student's t test for paired samples (alpha = .05).Results. The average pulpal temperature increases were 4.3 degrees C for the high-speed preparation and 3.8 degrees C for the ultrasonic preparation, which were statistically similar (P = .052). However, significant differences were found (P < .001) for the time expended (3.3 minutes for the high-speed bur and 13.77 minutes for the ultrasound device).Conclusions. The intrapulpal temperatures produced during cavity preparation by ultrasonic tips versus high-speed bur preparation were similar. However, the use of the ultrasonic device required 4 times longer for the completion of a cavity preparation.